Cruise Log for
2002 Hawaii Cruise Leg-1
July 12 17:00 Scientist on board Yokosuka at Pier #9
July 13
8:00-11:00
Scientist meeting
Role of scientists during Leg-1A
Research Plan for Leg-1A (initial)
15:30 Left Honolulu Port Pier-9
16:17 Start towing proton magnetometer
19:17 Start MNBES (seabeam) survey
19:00- Scientist Meeting
“Petrology and Geochemistry of submarine
Hana Ridge”
Zhong-Yuan Ren
July 14
2:54 Finished MNBES
and headed to Dive site
5:57 Released XBT
6:00 Arrived dive site for S686
6:27-7:08 Commenced MNBES for S686 dive site
10:02
Shinkai dove
17:09
Shinkai6500 refloated
17:34
Shinkai recovered
18:00
commenced towing proton magnetometer
18:05
MNBES site survey for Dive S687, 688
19:00
commenced MNBES survey
20:00
Scientist meeting
Results
of Dive S686 at Hana ridge Kevin Johnson
Degassing
process in 1999 Pinatsubo Eruption Julia Hammer
July 15
5:51 Finished MNBES survey
6:54 Recovered proton magnetometer
7:00
Arrived dive point for S687
10:02
Sinkai 6500 dove
17:00
Shinkai6500 refloated
17:34
Shinkai recovered
18:00
commenced towing proton magnetometer
18:05
MNBES site survey
20:00
Scientist Seminar
Results of Dive
S687 at Hana ridge Susumu
Umino
July 16
4:00
Finished MNBES mapping
6:58
recovered proton
9:40
supended SHINKAI operation
11:10
launched air gun
11:28
lowered streamer
13:19
commenced SCS survey
17:05
finished SCS survey
17:16
recovered streamer cable
17:34
commenced towing proton
18:57
commenced MNBES survey
19:00 Scientist Meeting
Results
of SCS study at NE of Maui
Hosoya & Eakins
“Geology
and tectonics of MacQuire island, new Zealand”
Nathan Daczco
July 17
00:50 finished MNBES and move to the dive
site
6:00-6:35
carried out MNBES survey for dive site
6:50
recovered proton
9:21
lowered working boat
9:55
launched SHINKAI
15:32
launched working boat
15:58
Shinkai refloated
16:57
recovered SHINKAI
17:29
commenced towing proton
18:36
commenced MNBES mapping
20:00
Scientist meeting
Results of Dive S688
at Puna ridge Kevin Johnson
“Ultrahigh
Cl in submarine basalt glass, Kilauea” Michelle Coombs
July 18
4:47
finished MNBES
6:57
recovered proton
9:30
suspended SHINKAI operation
10:48
launched air gun
11:05
lowered stramer cable
11:21
commenced SCS survey
16:41
finished SCS survey
17:00
recovered air gun
17:08
commenced towing proton
18:02
commenced MNBES mapping
19:00 Scientist meeting
Results of SCS survey at Puna ridge Hosoya & Eakins
“Kerguelen Hotspot magma output since
130Ma” Mike Coffin
July 19
6:36 Finished MBNES
6:59 Recovered proton
10:00
Shinkai6500 dove (#689)
17:04
Shinkai6500 refloated
17:29
Shinkai6500 recovered
17:55
Commenced proton magnetometer
20:00 Results of Dive 689 at South Kona H.Yokose
“ Noble gas study of
Hawaiian hot spot” T.Hanyuu
21:39
commenced MNBES survey
July 20th
7:17
Finished MNBES survey
7:57
recovered proton magnetometer
9:54
Shinkai6500 dove (#690)
17:02
Shinkai6500 refloated
18:48
Commenced MNBES survey
20:00
Scientist meeting
Results of Dive
S690 Mike Coffin
July 21th
3:19
Finished MNBES survey
8:00
Sea slight
9:57
Shinkai6500 dove (#691)
12:00
Sea mod
16:32
Shinkai refloated
18:32
Commenced MNBES survey
20:00
Scientist meeting
Results of Dive
S691 Eiichi Takahashi
Research plan
for Leg-1A (Final)
July 22nd
5:56
Finished MNBES survey
6:58
recovered proton
9:58
Shinkai6500 dove (#692)
16:00
sea smooth
17:14
Shinkai refloated
19:00-20:00 Scientist Meeting
Results of Dive S692
at North Kona Julia Hammer
19:26
Commenced MNBES survey
20:30-24:00 Party with Yokosuka Crew and Shinkai
team
July 23rd
6:50
Finished MNBES
6:56
recovered proton
8:40
Anchor touched at 42m, off coast of Kona port.
10:30-11:15
Exchange scientist at Kona Port by boat
17:40
Anchor cleared up and left Kona.
17:45
Commenced towing proton
July 24
7:00-7:40 Ccarried out MNBES for diving site at
South Arch
8:00 Sea Mod Suspended Shinkai Operation
9:30-
10:14 Carried out MNBES for
alternative dive site
11:56
Commenced MNBES survey
July 25th
2:12 Finished MNBES proceed to dive site
7:05 Recovered proton survey
8:00
Sea smooth
9:54
Shinkai dove (S-693)
12:00
Sea slight
16:00
Sea rough
16:11
Shinkai refloated
17:01
Commenced towing proton magnetometer
18:26-19:06
Carried out MNBES dive site survey
20:00
Sea Smooth
20:00-22:05 Scientist meeting
Results of Dive
S693 H Yokose
“Oceanic Rifted
margins, South Pacific” Barry
Eakins
20:49-
23:54 carried out MNBES survey
24:00
sea rough
July 26th
0:36-01:15
Carried out MNBES site survey at Loihi
8:00
Sea smooth
8:35
recovered proton magnetometer
9:55
Shinkai dove (S694)
16:00
Sea smooth
16:55
Shinkai refloated
17:57
commenced towing proton magnetometer
18:58 Commenced MNBES mapping survey
20:00
Sea slight
20:00-22:00
Scientist meting
Results of Dive
S694 N.Hirano
“Geologic Evolution of
Mauna Loa: current results of study on the
South Kona and North
Kona regions” H.Yokose
July27th
04:00
Sea modi.
04:59
Finished MNBES mapping survey.
08:00
Sea rough.
08:37
Recovered proton magnetometer.
09:15
Lowererd working boat No.2.
09:19
Transferred maneuvering control to aft bridge.
09:47
Launched SHINKAI 6500.
09:54
SHINKAI 6500 dove & started her operation No.
noon
Sea smooth.
16:00
Sea smooth.
16:47
Lowererd working boat No.2.
16:50
Transferred maneuvering control to aft bridge.
17:15
SHINKAI 6500 refloated.
17:33
Hoisted up SHINKAI 6500.
17:41
Recovered SHINKAI 6500 &finished above operation.
17:45
Hoisted up working boat No.2.
17:50
Transferred maneuvering control to fore bridge.
18:00
Com’ced proceeding to MNBES mapping survey area.
Mid
Night Sea slight
July28th
04:00
Sea Smooth
06:42
Finished MNBES mapping survey
08:00
Sea modi
09:20
Lowererd working boat No.2.
09:24
Transferred maneuvering control to aft bridge.
09:50
Launched SHINKAI 6500.
09:57
SHINKAI 6500 dove & started her operation No.696
10:02
Hoisted up working boat No.2.
10:03
Transferred maneuvering control to fore bridge.
12:00
Sea modi
16:00
Sea slight
16:32
Lowererd working boat No.2.
16:35
Transferred maneuvering control to aft bridge.
17:00
SHINKAI 6500 refloated.
17:14
Hoisted up SHINKAI 6500.
17:21
Recovered SHINKAI 6500 &finished above operation.
17:26
Hoisted up working boat No.2.
17:29
Transferred maneuvering control to fore bridge.
17:50
Com'ced MNBES mapping survey.
20:00
Sea modi
Mid
Night Sea slight
July29th
04:00
Sea slight
07:00
Finished MNBES mapping survey.
08:00
Sea sligh
09:26
Lowererd working boat No.2.
09:33
Transferred maneuvering control to aft bridge.
09:52
Launched SHINKAI 6500.
09:58
SHINKAI 6500 dove & started her operation No.697
10:03
Lowererd working boat No.2.
10:04
Transferred maneuvering control to fore bridge.
12:00
Sea slight
16:00
Sea slight
16:44
Lowererd working boat No.2.
16:48
Transferred maneuvering control to aft bridge.
17:10
SHINKAI 6500 refloated.
17:25
Hoisted up SHINKAI 6500.
17:31
Recovered SHINKAI 6500 &finished above operation.
17:35
Hoisted up working boat No.2.
17:37
Transferred maneuvering control to fore bridge.
18:08
Com'ced towing proton magnetometer.
18:36
Com'ced MNBES mapping survey.
20:00
Sea slight
21:30
Sience Meeting
・
Results
of Dive S697 T.Hanyu
・
Plan
for Dive S698 Loihi T.Matumoto
・
Plan
for July 30(battery Maintenance day)
・
Research
plan for South Arch
・
Seminer;Improvemen6t
of large capacity air guns formalit-channel seisuic study Hosoya
22:00-23:00
The following equipments has been tested found them in good condition.
Mid
Night Sea slight
July30th
01:17
Finished MNBES mapping survey and Com’ced proceeding to next MNBES mapping
survey area.
04:00
Sea slight.
06:53
Recovered transponder No.
07:03-08:00
Carried out MNBES mapping survey and Com’ced proceeding to KONA.
08:00
Sea slight.
08:05
Stationed all hands for anchoring and stand by both anchor.
08:18
Stop’d engines.
08:21
Walked lack (P) anchor.
08:30
Touched (P) anchor into 46m of water and asrrived at KONA anchorage A.
08:35
Brought up anchor wf 6cs of oalle in the water.
08:40
Hold on chaines, then dismissed above at ation.
Noon
Sea smooth.
15:00-15:15
Teated steering system and offer navi equipments.
15:20
Atationed all hands for heaving.
15:40
Com’ced heaving (P) anchor.
15:50
Up and down anchor, soon up anchor and left KONA for reseach area.
15:51
D/S engines, then used engines and steering verily.
15:55
Com'ced towing proton magnetometer.
16:00
Sea smooth.
16:05-16:20
Carried out MNBES mapping survey.
19:24
Com’ced MNBES mapping survey.
20:00
Sea smooth.
9:30-11:00 Seminer series-1
・
Morphomitric
study of pahoehoe lava entered to the sea,1990 Kaimu Bay flow of Kilauea,Hawaii
M.Nonaka
・
“Piggy
back”tectonics of Kilauea Pete
Lipman
19:00-21:00
seminer series-2
・
Multi-stage
evolution of the Tertiary Mineoka ophiorite,Boso Peninsula,japan Naota Hirano
・
Petrochemical
study of E-MORB around 46°E,Gulf of Aden Yuji Orihashi
July31th
04:00
Sea slight.
06:55
Recovered proton magnetometer.
08:00
Sea slight.
09:15
Lowererd working boat No.2.
09:20
Transferred maneuvering control to aft bridge.
09:55
Launched SHINKAI 6500.
10:02
SHINKAI 6500 dove & started her operation No.
10:07
Hoisted up working boat No.2.
10:10
Transferred maneuvering control to fore bridge.
Noon
Sea slight.
15:51
Lowererd working boat No.2.
15:55
Transferred maneuvering control to fore bridge.
16:00
Sea slight.
16:16
SHINKAI 6500 refloated.
16:33
Hoisted up SHINKAI 6500.
16:40
Recovered SHINKAI 6500 &finished above operation.
16:45
Hoisted up working boat No.2.
16:47
Transferred maneuvering control to fore bridge.
17:05
Com'ced towing proton magnetometer.
20:00
Sea slight.
20:00
Science meeting
l
Results
of Dive S698 T.Matsumoto
l
Plan
of Dive S699 B.Eakins
l
Schedule
of Aug.1,2,3
l
Reseach
plan for Loihi Orihashi
Aug.1st
0330
Finished MNBES mapping survey&com’ced procceding to dive site.
0440
Sea slight.
0624 Recovered
transponder No.
0630
Arrived at above site.
0800
Sea slight.
0819 Lowererd
working boat No.2.
0821 Transferred
maneuvering control to aft bridge.
0848 Launched
SHINKAI 6500.
0855 SHINKAI
6500 dove & started her operation No.
0859 Hoisted
up working boat No.2.
0901 Transferred
maneuvering control to fore bridge.
Noon
Sea slight.
1530 Lowererd
working boat No.2.
1535 Transferred
maneuvering control to aft bridge.
1553 SHINKAI
6500 refloated.
1600
Sea slight.
1610 Hoisted
up SHINKAI 6500.
1617 Recovered
transponder No.2&finished above operation.
1621 Hoisted
up working boat No.2.
1623 Transferred
maneuvering control to fore bridge.
2000
Sea smooth.
m.n.
Sea slight.
Aug.2nd
0440
Sea smooth.
0557 Released
XBT.
0600
Arrived at researching area.
0638-0707
Finished MNBES mapping survey.
0800
Sea slight.
0918 Lowererd
working boat No.2.
0922 Transferred
maneuvering control to aft bridge.
0950 Launched
SHINKAI 6500.
0957 SHINKAI
6500 dove & started her operation No.
1001 Hoisted
up working boat No.2.
1003 Transferred
maneuvering control to fore bridge.
Noon
Sea slight.
1600
Sea slight.
1645 Lowererd
working boat No.2.
1649 Transferred
maneuvering control to aft bridge.
1710 SHINKAI
6500 refloated.
1725 Hoisted
up SHINKAI 6500.
1732 Recovered
SHINKAI 6500 &finished above operation.
1737 Hoisted
up working boat No.2.
1738 Transferred
maneuvering control to fore bridge.
2000 Com'ced
MNBES mapping survey.
m.n.
Sea slight.
Aug.10th
0400
Light treeze&fine but cloudyWs.
0800
Ligth air&fine but cloudyWs.
0930-1120
tool in F.W.
noon
Gentle breeze&fine but cloudyWs.
2000
Light breeze&fine but cloudy Ws.
m.n.
Modi breeze&fine but cloudy Ws.
Aug.11th
0400
Light breeze&fine but cloudy Ws.
0800
Light air&fine but cloudy Ws.
0800-0830
Carried out education&training for scientists.
0845-0900
Tried engins&S/B engins then atationed for leaving poat.
0920
Pilot can’t “T,HEBERIE” came on boored.
0925
Angle up.
0930
Let go all shore lines &left HONOLULU for research area.
0933
D/S engines then used engines&steering vaul.
0940
Pilot left her, then drained above attention.
1000
Arrived at research area.
1007 Com’ced
MNBES mapping survey.
1154
Released XBT(at 20°57.5330N,158°21.4740W)
noon
Sea modi.
1211
Launched AIR-GUN.
1217
Launched streamer cabbe.
1233
Com’ced S.C.S. survey.
1600
Sea smooth.
1700
Finished S.C.S. survey.
1708
Recovered streamer cabbe.
1718
Recovered air gun.
1737
Com’ced touring proton magnetometers.
2000
Sea smooth.
m.n.
Sea smooth.
1900-
Science meetings
l
Plan
for S701 dive –Michelle Coombs
l
Plan
for sea beam Aug.11. Aug.12. –Barry Eakins
l
Summary
on Southwest Oahu volcanic field –E.Takahashi
l
Seminer
by Nogushi &Nakagawa”Petrology&geochemistry of Kauai-Oahu alkali
basalts”
Aug.12th
0400
Sea smooth.
0456
Finished MNBS mapping survey.
0700
Arrived at divepoint.
0650
Recovered proton magnetometer.
0800
Sea smooth.
0913
Lowered working boat No.2.
0917 Transferred
maneuvering control to afti bridge.
0950
Launched SHINKAI6500.
0956
SHINKAI6500 dove & started her operation No
1000
Hoisted up working boat No.2.
1001 Transferred
maneuvering control to fore bridge
noon
Sea smooth.
1536
Lowered working boat No.2
1541 Transferred
maneuvering control to afti bridge
1605
SHINKAI6500 refloated.
1622
Hoisted up SHINKAI6500.
1630
Recovered SHINKAI6500 & finished aboveoperations.
1638
Hoisted up working boat No.2.
1640 Transferred
maneuvering control to fore bridge
1702
Com’ced towing proton magnetometer>
1741
Com’ced MNBES mapping survey.
2000
Sea smooth.
m.n
Sea slight..
19:00-
Scientist meeting
l
Results
of S701 dive –Michelle Coombs
l
Plan
for S702 dive –Mitsuhiro Nakagawa
l
Sea
beam plan for Aug. 12-13 –Barry Eakins (Bad
weather plan…)
l
Reaerch
plan for South west Oahu
l
Seminer
–David Clague “Submarine explosive Eruption”
Aug.13th
0400
Sea smooth.
0650
Released XBT.
0656
Recovered proton magnetometer.
0800
Sea slight.
0914
Lowered working boat No.2.
0919 Transferred
maneuvering control to afti bridge
0944
Launched SHINKAI6500.
0950
SHINKAI6500 dove & started her operation No.2.
0955
Hoisted up working boat No.2.
0958 Transferred
maneuvering control to fore bridge
noon
Sea slight.
1600
Sea smooth.
1638
Lowered working boat No.2.
1642 Transferred
maneuvering control to afti bridge
1705
SHINKAI6500 refloated.
1721
Hoisted up working boat No.2
1729
Recovered SHINKAI6500 & finished above operation.
1734
Hoisted up SHINKAI6500.
1737 Transferred
maneuvering control to fore bridge
1803
Com’ced towing proton magnetometer.
1925
Com’ced MNBES mapping survey.
2000
Sea smooth.
m.n.
Sea slight.
20:00-
Scientist meeting
l
Results
of Dive S702 –Mitsuhiro Nakagawa
l
Plan
for Dive S703 –Susumu Umino
l
Later
schedule of Leg2A
Aug.14th
0400
Sea smooth.
0650
Finished MNBSE mapping survey.
0655
Recovered proton magnetometer.
0800
Sea slight.
0916
Lowered working boat No.2.
0922 Transferred
maneuvering control to afti bridge.
0949
Launcheed SHINKAI 6500.
0956.
SHINKAI 6500 dove & started her operation No.
1001
Hoisted up working boatNo.2
1002 Transferred
maneuvering control to fore bridge
noon
Sea modi.
1600
Sea modi.
1638
Lowered working boat No.2
1642 Transferred
maneuvering control to afti bridge.
1704
SHINKAI 6500 refloated.
1717
Hoisted up SHINKAI 6500.
1724
Recovered SHINKAI 6500 & finished above operation.
1729
Hoisted up working boat No.2
1730 Transferred
maneuvering control to fore bridge.
1754
Com’ced towing proton magnetometer.
2000
Sea smooth.
2042
Com’ced MNBES mapping survey.
m.n.
sea smooth.
20:00-
Scientist meeting
l
Results
of Dive S703 –Susumu Umino
l
Plan
for seabeam work at North Arch –David Clague
l
Plan
for Dive S704 –N.Horano
l
Plan
for Aug 15th
l
Seminer
by H.Hirano
“A
new type of intraplate alkalic magmatism”
Aug.15h
0400 Sea
slight.
0800
Sea slight.
1053
Released XBT (24°08’0455N,158°30’0355N)
noon
Sea slight.
1600
Sea slight.
2000
Sea slight.
m.n.
Sea slight.
Aug.16h
0300 Finished
MNBES mapping survey.
0400
Sea slight
0600-0636
Carried out MNBES mapping survey.
0656
Recovered proton
0800 Sea
slight
0914 Lowered
working boat No.2
0920 Tranced
maneuvering control to fore bridge
0950 Launched
SHINKAI 6500.
0956 SHINKAI
6500 dove & started her operation No.704
1001 Hoisted
up working boat No.2.
1002 Tranced
maneuvering control to aft bridge.
1200 Sea
slight.
1600 Sea
slight.
1635 Lowered
working boat No.2
1636 Tranced
maneuvering control to fore bridge.
1701 “SHINKAI
6500” refloated.
1715 Hoisted
up SHINKAI 6500.
1723 Recovered
SHINKAI 6500 & finished above operation.
1727 Hoisted
up working boat No.2
1728 Tranced maneuvering control to aft bridge.
1751 Com'ced
towing proton magnetometer.
2000 Sea
slight.
2013 Com'ced
MNBES mapping survey.
Mn. Sea
slight.
2000-Scientist
Meeting
・ Result of Dive S704 – Naoto Hirano
・
Plan
for Dive S705 – David Clague / Michelle Coombs
・
Plan
for seabeam in North Arch – David Clague
・
Schedule
until Kona transit
Aug.17th
0115
Stop’d MNBES mapping survey.
0141
Recovered proton magnetometer.
0239-0252
Used working boat No.2.
0340 Com'ced
MNBES mapping survey.
0400 Sea
slight
0700 Finished
MNBES mapping survey.
0800 Sea
slight
0917 Lowered
working boat No.2.
0920 Tranced
maneuvering control to fore bridge.
0952 Launched
SHINKAI 6500.
0959 SHINKAI
6500 dove & started her operation No.705 (35)
1003 Hoisted
up SHINKAI 6500.
1004 Tranced
maneuvering control to aft bridge.
1200 Sea
slight.
1600 Sea
slight.
1657 Lowered
working boat No.2.
1701 Tranced
maneuvering control to fore bridge.
1721 SHINKAI
6500 refloated.
1737 Hoisted
up SHINKAI 6500.
1744 Recovered
SHINKAI 6500 & finished above operation.
1749 Hoisted
up working boat No.2.
1750 Tranced
maneuvering control to aft bridge.
1815 Com'ced
towing proton magnetometer.
2000 Sea
slight.
2002 Com'ced
MNBES mapping survey.
2400 Sea
slight
2000-Scientist
Meeting
Result
of Dive S705 – Michelle Coombs
Plan
for Dive S706 – Mitsuhiro Nakagawa
Research
Plan for North Arch – David Clague
Schedule
for Aug. 18
Aug.18th
0400 Sea
slight
0800 Sea
slight
0853-0907
Carried
out figure eight turn at <24°-40’.7W. 157°-51’.1W> D=4228
1200 Sea mod’
1600 Sea slight
2000 Sea
slight
2400 Sea
slight
1300 –
Seminar
・Volatiles in Kilauea magmas imprications
for its growth – Michelle Coombs
・Sequential caldela-forming eruptions from
multiple magma chambers of Sikotsu caldera, Hokkaido, Japan – Mitsuhiro
Nakagawa
2000-
Seminar
・Structure and Growth of the Nankai
Torough Accretionary Prism –Greg Moore
・Submarine volcanic and hydrothermal
activity – David Clague
Aug.19th
0042
Finished MNBES mapping survey.
0400 Sea
slight
0654 Recovered
proton magnetometer.
0800
Sea mod’
0920 Lowered
working boat No.2.
0925 Tranced
maneuvering control to fore bridge.
0956 SHINKAI
6500 dove & started her operation No.706 (36)
1000 Hoisted
up working boat No.2.
1001 Tranced
maneuvering control to aft bridge.
1200
Sea mod’
1534 Lowered
working boat No.2.
1539 Tranced
maneuvering control to fore bridge.
1559 SHINKAI
6500 refloated.
1600
Sea mod’
1613 Hoisted
up SHINKAI 6500.
1620 Recovered
SHINKAI 6500 & finished above operation.
1625 Hoisted
up working boat No.2.
1626 Tranced
maneuvering control to aft bridge.
1649 Com'ced
towing proton magnetometer.
1859 Com'ced
MNBES mapping survey.
2000 Sea
slight
2400 Sea mod’
2000-
Scientist Meeting
・Result of Dive S706 – Mitsuhiro Nakagawa
・Plan for Dive S707- Hisayoshi Yokose
・Research Policies for 2001-2002 Hawaii
Cruise – Eiichi Takahashi
Aug.20th
0158 Finished MNBES mapping survey.
0400 Sea slight
0548 Released XBT.(21-39.2980N, 157-10.5687E)
0625-0704 Carried out MNBES mapping survey.
0713 Recovered towing proton magnetometer.
0800 Sea mod’.
0930 Suspended SHINKAI 6500 submergenci due to
rough sea.
1003 Launched ATR-GUN
1007 Lowered streamer cable.
1019 Com’ced S.C.S. survey.
1200 Sea rough
1600 Sea rough
1700 Finished S.C.S. survey.
1711 Recovered streamer cable.
1719 Recovered ATR-GUN
2000 Sea mod’
2119 Com'ced MNBES mapping survey.
2400 Sea slight
2000 Scientist Meeting
・Results
of SCS #12 – Imamura, Oyaizu, Yokose
#11 – Imamura, Oyaizu, Takahashi
・Plan
for Dive S707 – Greg Moore
・Bud-weather
Plan – Eiichi Takahashi
Aug.21th
0348 Finished MNBES mapping survey.
0400 Sea mod’
0559-0636 Carried out MNBES mapping survey.
0655 Recovered proton magnetometer.
0710-0739 Carried out
MNBES mapping survey.
0800 Sea mod’
0935 Lowered working boat No.2
0942 Tranced maneuvering control to fore
bridge
1021 Launched SHINKAI 6500.
1028 SHINKAI 6500 dove & started her operation
No.707
(37)
1032 Hoisted up working boat No.2.
1033 Tranced maneuvering control to aft bridge
1200 Sea mod’
1600 Sea mod’
1617 Lowered working boat No.2
1622 Tranced maneuvering control to fore
bridge
1644 SHINKAI 6500 refloated.
1700 Hoisted up SHINKAI 6500.
1706 Recovered SHINKAI 6500 & finished
above operation
1710 Hoisted up working boat No.2
1711 Tranced maneuvering control to aft bridge
1733 Com'ced towing proton magnetometer.
1928 Com'ced MNBES mapping survey.
2000 Sea mod’
2200 -2300
The following equipment has been tested of
founds them in good condition
1)
Rimary of secondary steering gear.
2)
All internal vessel control communication of
vessel control alarms.
3)
Stand by on emergency generator.
4)
Emergency batteries.
5)
Main propulsion machinery and of a sterm, low
thranster.
2400 Sea slight
2000 Scientist Meeting
・Result
of Dive707 – Gerg Moore
・Research
Plan ( confirmation)
・Schedule
until Kona transit.
Aug.22th
0250 Finished MNBES mapping survey & Com’ced
proceeding to Kona S/ Co to 127°
0400 Sea mod’
0649 Recovered proton magnetometer.
0745 Bore keahole Pt L’t H°on
<182°>
6.9’off of steering var’ly
0800 Sea rippled calm.
0815 Stationed all hands for anchoring and stand
by both anchor.
0842 Stop’d engines.
0843 Walked lack (S) anchor.
0845 Touched anchor into 41m of water and
asrrived at KONA anchorage A.
0850 Brought up anchor wf 6cs of oalle in the
water.
0855 Hold on chaines, then dismissed above at
ation.
1030-1135 Used working boat No.1
1200 Light bridge & fine brit cloudy W.
1300-1340 Carried out education training for
scientists
1430 Teated steering system and offer navi equipments
then founds them in good condition.
1445 Stationed all hands for heaving.
1455 Com’ced heaving (S) anchor.
1500 Up and down anchor, soon up anchor and left
KONA for research area.
1503 D/S engines, then used engines and steering
verily.
1600 Sea smooth
1803-1840 Carried out MNBES mapping survey.
2000 Sea mod’
2300-2343 Carried out MNBES mapping survey.
2400 Sea mod'
1300 Briefing
for new comers
1900 Meeting
・Working group
・Plan for Dive 708 – Julia Morgan/ Jiro Naka
Aug.23th
0400 Sea
mod'
0800 Sea
mod'
0918 Lowered
working boat No.2
0923 Tranced
maneuvering control to fore bridge
0948 Launched
SHINKAI 6500.
0954 SHINKAI
6500 dove & started her operation No.708 (38)
0958 Hoisted
up working boat No.2.
1001 Tranced
maneuvering control to aft bridge
1200 Sea
mod'
1600 Sea
mod'
1553 Lowered working boat No.2
1558 Tranced
maneuvering control to fore bridge
1619 SHINKAI
6500 refloated.
1633 Hoisted
up SHINKAI 6500.
1640 Recovered
SHINKAI 6500 & finished above operation
1646 Hoisted
up working boat No.2
1647 Tranced
maneuvering control to aft bridge
1715 Com'ced
towing proton magnetometer.
1757-1831
Carried out MNBES mapping survey
1928-2004
Carried out MNBES mapping survey
2000 Sea
mod'
2010 Com'ced
MNBES mapping survey.
2400 Sea
slight
2000 Scientist
Meeting
・Result of Dive 708- Jiro Naka
・Plan for Dive 709 – Tom Sisson
Aug.24th
0400 Sea
slight
0645 Finished
MNBES mapping survey.
0649 Recovered
towing proton magnetometer.
0800 Sea
slight
1043 Lowered
working boat No.2
1047 Tranced
maneuvering control to fore bridge
1108 Launched
SHINKAI 6500.
1116 SHINKAI
6500 dove & started her operation
1120 Hoisted up working boat No.2.
1122 Tranced
maneuvering control to fore bridge
1200 Sea
slight
1636 Lowered
working boat No.2
1641 Tranced
maneuvering control to fore bridge
1702 SHINKAI
6500 refloated.
1719 Hoisted
up SHINKAI 6500.
1726 Recovered
SHINKAI 6500 & finished above operation
1730 Hoisted
up working boat No.2
1731 Tranced
maneuvering control to aft bridge
1750 Com'ced
towing proton magnetometer.
1802-1815
Carried out eight figure turn at <19°-12’.1825N 155°-05’.4140W>
D=2149
2000 Sea
slight
2007 Com'ced
MNBES mapping survey.
2400 Finished
MNBES mapping survey. Sea
slight
2000 Scientist
Meeting
・Result of Dive 709 – Tom Sisson
・Plan for Dive 710 – Pete Lipman
・Semiar: Structure and Evolution of Papa’u Sea mount – Julia Morgan
Aug.25h
0400 Sea
slight
0653 Recovered
proton magnetometer.
0800 Sea slight
with ESE’ly mod’ swell long
0924 Lowered
working boat No.2
0928 Tranced
maneuvering control to fore bridge
0945 Launched
SHINKAI 6500.
0951 SHINKAI
6500 dove & started her operation No.
0956 Hoisted
up working boat No.2.
0957 Tranced
maneuvering control to aft bridge
1200 Sea slight
with ESE’ly mod’ swell long
1600 Sea mod’
1547 Lowered
working boat No.2
1550 Tranced
maneuvering control to fore bridge
1612 SHINKAI
6500 refloated.
1627 Hoisted
up SHINKAI 6500.
1634 Recovered
SHINKAI 6500 & finished above operation
1638 Hoisted
up working boat No.2
1639 Tranced
maneuvering control to aft bridge
1700 Com'ced
towing proton magnetometer.
2000 Sea
slight
2234 Com'ced
MNBES mapping survey.
2400 Sea
slight
2000 Scientist
Meeting
・Result of Dive 710 – Pete Lipman
・Plan for Dive 711 – Junichi Kimura
Aug.26h
0400 Sea
slight
0506 Finished
MNBES mapping survey.
0651 Recovered
proton magnetometer.
0800 Sea
slight
0917 Lowered
working boat No.2
0922 Tranced
maneuvering control to fore bridge
0945 Launched
SHINKAI 6500.
0951 SHINKAI
6500 dove & started her operation No.
0955 Hoisted
up working boat No.2.
0956 Tranced
maneuvering control to aft bridge
1200 Sea
slight
1600 Sea
slight
1633 Lowered
working boat No.2
1636 Tranced
maneuvering control to fore bridge
1700 SHINKAI
6500 refloated.
1714 Hoisted
up SHINKAI 6500.
1721 Recovered
SHINKAI 6500 & finished above operation
1724 Hoisted
up working boat No.2
1725 Tranced maneuvering control to aft
bridge
1745 Com'ced
towing proton magnetometer.
1922 Com'ced
MNBES mapping survey.
2000 Sea
slight
2400 Sea
slight
2000 Scientist Meeting
・Results of Dive 711 – Junichi Kimura
・Plan for Dive 712 – Michelle Coombs
Aug.27h
0400 Sea
slight
0416 Finished
MNBES mapping survey.
0654 Com'ced
proton magnetometer.
0800 Sea slight
0915 Lowered
working boat No.2
0919 Tranced
maneuvering control to fore bridge
0946 Launched
SHINKAI 6500.
0954 SHINKAI
6500 dove & started her operation No.712 (42)
0958 Hoisted
up working boat No.2.
1000 Tranced
maneuvering control to aft bridge
1200 Sea
slight
1600 Sea
slight
1633 Lowered
working boat No.2
1638 Tranced
maneuvering control to fore bridge
1659 SHINKAI
6500 refloated.
1715 Hoisted
up SHINKAI 6500.
1720 Recovered
SHINKAI 6500 & finished above operation
1725 Hoisted
up working boat No.2
1727 Tranced
maneuvering control to aft bridge
1751 Com'ced
towing proton magnetometer.
2000 Sea
slight
2037 Com'ced
MNBES mapping survey.
2400 Sea
slight
2000 Scieintist
Meeting
・Result of Dive 712 – Michelle Coombs
・Plan for Dive 713 – Hisayoshi Yokose
Aug.28h
0400 Sea
slight
0645 Finished
MNBES mapping survey.
0650 Recovered
towing proton magnetometer.
0800 Sea
slight
0917 Lowered
working boat No.2
0922 Tranced
maneuvering control to fore bridge
0947 Launched
SHINKAI 6500.
0954 SHINKAI
6500 dove & started her operation No.
0957 Hoisted
up working boat No.2.
0959 Tranced
maneuvering control to aft bridge
1200 Sea
mod'
1600 Sea
mod'
1639 Lowered
working boat No.2
1644 Tranced
maneuvering control to fore bridge
1702 SHINKAI
6500 refloated.
1717 Hoisted
up SHINKAI 6500.
1724 Recovered
SHINKAI 6500 & finished above operation
1728 Hoisted
up working boat No.2
1730 Tranced
maneuvering control to aft bridge
2000 Sea
mod'
2400 Sea
mod'
2000 Scientist
Meeting
・Result of Dive 713 – Hisayoshi Yokose
・Plan for Dive 714 – Julia Morgan
Aug.29h
0044-0466
Carried out MNBES mapping survey
0400 Sea smooth
0800 Sea
slight
0918 Lowered
working boat No.2
0922 Tranced
maneuvering control to fore bridge
0944 Launched
SHINKAI 6500.
0951 SHINKAI
6500 dove & started her operation No.
0955 Hoisted
up working boat No.2.
0957 Tranced
maneuvering control to aft bridge
1200 Sea
slight
1600 Sea
slight
1639 Lowered
working boat No.2
1644 Tranced
maneuvering control to fore bridge
1706 SHINKAI
6500 refloated.
1723 Hoisted
up SHINKAI 6500.
1730 Recovered
SHINKAI 6500 & finished above operation
1734 Hoisted
up working boat No.2
1735 Tranced
maneuvering control to aft bridge
1755 Com'ced
towing proton magnetometer.
1921- 1955
Carried out MNBES mapping survey
2000 Sea smooth
2159 Com'ced
MNBES mapping survey.
2400 Sea
slight
20:00 Scientist
Meeting
・Result of Dive 714 – Julia Morgan
・Plan for Dive 715 – Toshiya Kanamatsu
・SCS Plan
・Seabeam Plan for Sep. 1
Aug.30th
0400 Sea
slight
0413 Finished
MNBES mapping survey.
0647 Recovered
proton magnetometer.
0800 Sea smooth
0917 Lowered
working boat No.2
0922 Tranced
maneuvering control to fore bridge
0944 Launched
SHINKAI 6500.
0951 SHINKAI
6500 dove & started her operation No.
0955 Hoisted
up working boat No.2.
0956 Tranced
maneuvering control to aft bridge
1200 Sea smooth
1600 Sea
slight
1644 Lowered
working boat No.2
1648 Tranced
maneuvering control to fore bridge
1708 SHINKAI
6500 refloated.
1720 Hoisted
up SHINKAI 6500.
1728 Recovered
SHINKAI 6500 & finished above operation
1732 Hoisted
up working boat No.2
1733 Tranced
maneuvering control to aft bridge
1753 Com'ced
towing proton magnetometer.
2000 Sea
slight
2056 Com'ced
MNBES mapping survey.
2400 Sea smooth
2000 Scientist
Meeting
・Result of Dive 715 – Toshiya kanamatsu
・Schedule of Aug. 31 & Sep 1
Aug.31st
0400 Sea
slight
0640 Recovered
proton magnetometer.
0654 Launched
ATR-GUN
0657 Launched
streamer cable
0743 Com’ced
SCS survey
0800 Sea smooth
1200 Sea
slight
1600 Sea mod’
1629 Finished
SCS survey
1639 Recovered
streamer cable
1651 Recovered
AIR-GUN
1654 Com’ced
proton magnetometer
2000 Sea
mod'
2400 Sea
slight
1400 Scientist
Meeting
・Research Plan
Sept.1st
0400 Sea
slight
0800 Sea
mod'
1200 Sea
mod'
1400-1414 Carried
out figure eight figure running (20-19.7N 157-55.3W)
1426 Recovered proton magnetometer
1600 Sea smooth
2000 Sea smooth
2200-2300
The following equipment has been tested of
founds them in good condition
1)
Rimary of secondary steering gear.
2)
All internal vessel control communication of
vessel control alarms.
3)
Stand by on emergency generator.
4)
Emergency batteries.
5)
Main propulsion machinery and of a sterm, low
thranster.
2400 Sea slight
1300 Scientist Meeting
1500 Party on deck with ship crew and Shinkai
Team
Sept.2nd
0313 Finished MNBES mapping survey.
0315 Com’ced proceeding to Honolulu & S/Co
to 355°<T.Co355°M.Co343°>
0400 Sea smooth
0610 Bore Koko Head p’b on <355°>
2! off steering varly
0715 Pilot capt “L.STENBACK” care on board
0754 Stop’d eng’s
0800 Sea rippled calm
0810 Sent out 1st shore line arrived
at Honolulu
0815 M/F to pier 11 on her starb’d side, then
F/W eng’s
0820 Pilot left her, then dismissed above station
0830-0900 Immigration officers came on board
inspected respectivery