Introduction
This set of videos presents about 15 hours of footage documenting the 141 experiments conducted at the USGS debris-flow flume from 1992 to 2012. Owing to improvements in video technology over the years, the quality of footage from recent experiments generally exceeds that from earlier experiments.
Use the list below to access the individual videos, which are grouped by year and listed by date and subject matter. When an experiment is selected from the list, multiple video sequences are automatically shown in succession, beginning with a far-field overview and proceeding to close-up views and post-experiment documentation.
Interpretations and data from experiments at the USGS debris-flow flume are not provided here but can be found in published reports, many of which are available online at: https://profile.usgs.gov/riverson/
A brief introduction to the flume facility is also available online in USGS Open-File Report 92–483 [http://pubs.er.usgs.gov/usgspubs/ofr/ofr92483].
Flume-Video Credits
The experiments shown here would not have been possible without the long-term participation of flume stalwarts:
Tony Bequette, Roger Denlinger, Jonathan Godt, Julie Griswold, Kevin Hadley, Rick LaHusen, Jon Major, Mark Reid, Kelly Swinford, Jim Vallance, Joe Walder
Additional assistance vital to successful experiments was provided by:
Matteo Berti, Jean-François Benoit, Catherine Berger, Dianne Brien, Emily Cahoon, Sue Cannon, Dallas Childers, Sarah Christian, John Costa, Jeff Coe, Jay DeNatale, Hannah Dieterich, Carolyn Dreidger, John Duffy, Brooke Fiderovich, Greg Fiegel, Cate Fox-Lent, Dave George, Nico Gray, Marc Gullison, Tom Hale, Scott Henderson, Shannon Hayes, Neal Iverson, Chris Johnston, Jackie Kendrick, Peter Kokelaar, Stephen Lancaster, Chris Locket, Tom Lill, Michael Manga, Linda Mark, Larry Mastin, Brian McCardell, Adam Mosbrucker, Simon Mudd, Kate Potter, Ben Schonfeld, Ron Shreve, Bill Shultz, Joel Smith, Oscar Sorenson, Kurt Spicer, Winston Stokes, Gordon Stratford, Anthony Thornton, Dan Turner, Tristan Wellman, Christine Williams, Peter Vollmoeller, Carl Zimmerman
Videos of experiments conducted at the USGS Debris-Flow Flume 1992–2012
1992
04-10-1992 First flume test, flow of moist pea gravel
04-30-1992 First debris flow test, wet sand & gravel
05-21-1992 Debris flow, wet sand & gravel
06-10-1992 Debris flow, wet sand & gravel
07-16-1992 Debris flow, wet sand & gravel
09-22-1992 Dry grain flow of Steilacoom gravel
09-25-1992 Debris flow, wet sand & gravel
1993
04-07-1993 Debris flow against cylindrical obstacle
04-08-1993 Debris flow against planar obstacle
05-06-1993 Debris flow, wet sand & gravel
07-21-1993 Debris-flow superelevation, 10-m curve
07-22-1993 Debris-flow superelevation, 10-m curve
08-10-1993 Dry gravel flow with high-speed film
08-11-1993 Dry gravel flow with high-speed film
09-15-1993 Debris-flow superelevation, 4-m curve
09-16-1993 Debris-flow superelevation, 4-m curve
10-19-1993 Debris flow with channelized runout
10-21-1993 Debris flow with channelized runout
1994
04-19-1994 Debris flow, wet sand & gravel
04-21-1994 Debris flow, wet sand & gravel
05-26-1994 Debris flow, wet sand, gravel & loam
06-21-1994 Debris-flow impact on rigid wall
06-23-1994 Debris-flow impact on rigid wall
07-20-1994 Debris flow with loam, channelized runout
08-30-1994 Clear water dam-break flood
08-31-1994 Debris flow with loam, channelized runout
09-28-1994 Water flood following failed landslide experiment
1995
04-26-1995 Debris flow with channelized runout
06-07-1995 Landslide initiation by surface sprinkling
06-08-1995 Landslide initiation by groundwater feed
07-24-1995 Debris flow, partly channelized runout
07-26-1995 Debris flow runout on existing deposit
09-12-1995 Debris flow, wet Steilacoom gravel
09-13-1995 Debris flow with loam, channelized runout
1996
06-18-1996 Debris-flow impact on cable net
06-20-1996 Debris-flow impact on cable net
06-21-1996 Debris-flow impact on cable net
06-22-1996 Debris-flow impact on cable net
06-23-1996 Debris-flow impact on cable net
06-25-1996 Debris-flow impact on cable net
07-24-1996 Landslide initiation, 50% loam
07-25-1996 Landslide initiation, 50% loam
08-27-1996 Debris flow into ponded water
08-28-1996 Debris flow into ponded water
08-29-1996 Debris flow with loam into ponded water
1997
05-20-1997 Debris-flow runup on adverse 30-deg slope
05-22-1997 Debris-flow runup on adverse 30-deg slope
07-22-1997 Debris flow containing 50% loam
07-24-1997 Debris flow containing 50% loam
08-26-1997 Debris flow containing large rocks
08-28-1997 Debris flow containing large rocks
1998
06-17-1998 Landslide initiation, loose 25% loam
06-18-1998 Landslide initiation, loose 25% loam
06-22-1998 Landslide initiation, dense 25% loam
06-23-1998 Landslide initiation, loose 25% loam
06-25-1998 Landslide initiation, dense 25% loam
08-25-1998 Debris flow over rough bed (slatted fence)
08-27-1998a Debris flow on erodible sandy loam bed
08-27-1998b Water flood on sediment-laden bed
09-01-1998 Debris flow on erodible crushed rock bed
09-02-1998 Water flood on existing debris-flow deposit
1999
06-09-1999 Landslide initiation, loose 25% loam
06-10-1999 Landslide initiation, dense 25% loam
06-15-1999 Landslide initiation, dense 25% loam
06-17-1999a Landslide initiation, dense 25% loam first part
06-17-1999b Landslide initiation, dense 25% loam second part
09-15-1999 Debris flow on channeled erodible bed
09-16-1999 Debris flow with surcharge of logs
09-21-1999 Debris flow on erodible bed with logs
09-22-1999 Water flood over eroded sediment bed
09-23-1999 Debris flow on erodible bed with logs
2000
09-19-2000 First debris flow on rough concrete bed
09-21-2000 Debris flow, sand & gravel on rough bed
09-25-2000 Debris flow, sand & gravel on rough bed
09-26-2000 Debris flow, sand & gravel on rough bed
09-27-2000 Dam-break water flood on rough concrete bed
09-28-2000 Debris flow, sand, gravel & loam on rough bed
09-29-2000 Dam-break water flood on rough concrete bed
2001
2001_06_19 Dam-break water flood on rough concrete bed
2001_06_20 Dam-break water flood over sediment bed
2001_06_26 Dam-break water flood over sediment bed
2001_06_28 Debris flow, sand, gravel & loam on rough bed
2001_09_11 Controlled water flood over sediment bed
2001_09_13 Debris flow, sand, gravel & loam on rough bed
2001_09_18 Controlled water flood over sediment bed
2001_09_20 Dam-break water flood over sediment bed
2002
2002_08_28 Dam-break water flood on rough concrete bed
2002_09_10 Dam-break water flood over sediment bed
2002_09_11 Dam-break water flood over eroded sediment bed
2002_09_12 Debris flow, sand, gravel & loam on rough bed
2002_09_17 Debris flow, sand, gravel & loam on rough bed
2002_09_18 Debris flow, sand & gravel on rough bed
2002_09_19 Debris flow, sand & gravel on rough bed
2003
06-17-2003 Debris flow over sediment bed at flume base
06-19-2003 Debris flow over sediment bed at flume base
06-24-2003 Debris flow over sediment bed at flume base
06-25-2003 Debris flow over sediment bed at flume base
2004
2004_09_14 Debris flow, sand, gravel & loam on rough bed
2004_09_20 Debris flow, sand & gravel on rough bed
2004_09_22 Debris flow over sediment at flume base
2004_09_23 Debris flow, sand & gravel on rough bed
2006 (no files for 2005)
2006_06_07 Dam-break water flood on rough bed
2006_06_08a Debris flow, sand, gravel, & loam on rough bed (6m3)
2006_06_08b Dam-break water flood over debris-flow deposit
2006_09_12 Debris flow, sand, gravel, & loam on rough bed (6m3)
2006_09_14 Debris flow, sand, gravel & loam on erodible bed (6m3)
2006_09_19 Debris flow, sand, gravel & loam on erodible bed (6m3)
2006_09_21 Debris flow, sand, gravel & loam on erodible bed (6m3)
2007
2007_06_12 Dam-break water flood on rough bed
2007_06_14a Debris flow, sand, gravel & loam on erodible bed (6m3)
2007_06_14b Dam-break water flood over debris-flow deposit
2007_06_19 Debris flow, sand, gravel, & loam on rough bed (6m3)
2007_06_21 Debris flow, sand, gravel & loam on erodible bed (6m3)
2008
2008_05_13 Debris flow, sand, gravel & loam on erodible bed (6m3)
2008_05_15 Debris flow, sand, gravel & loam on erodible bed (6m3)
2008_08_19 Debris flow, sand & gravel on rough bed
2008_08_21 Debris flow, sand, gravel, & loam on rough bed with runout diversion
2008_08_26 Debris flow, sand & gravel with large rocks on rough bed with runout diversion, total run time (TRT): 00:06:52
2008_08_28 Debris flow, sand & gravel on rough bed with runout diversion
2009
2009_06_02 Debris flow, sand, gravel & loam on erodible bed (6m3)
2009_06_04 Debris flow, sand, gravel & loam on erodible bed (6m3)
2009_08_18 Debris flow, sand & gravel on rough bed with particle tracking and runout diversion
2009_08_20 Debris flow, sand & gravel on rough bed with particle tracking and runout diversion
2009_08_25 Debris flow, sand & gravel on rough bed with particle tracking and runout diversion
2009_08_27 Debris flow, sand & gravel on rough bed with particle tracking and runout diversion TRT: 00:06:53
2010
2010_05_25 Debris flow, sand, gravel & loam on erodible bed (6m3). TRT: 00:09:12
2010_05_27 Debris flow, sand, gravel & loam on rough bed (6m3). TRT: 00:06:50
DamBreach_Introduction Introduction to dam-breach experiments at foot of flume: TRT: 00:02:05
2010_08_18 Dam-breach experiment at foot of flume: water impounded by 1-m-high dam. TRT: 00:07:29
2010_08_20 Dam-breach experiment at foot of flume: water impounded by 1-m-high dam. TRT: 00:07:13
2010_08_24 Dam-breach experiment at foot of flume: water impounded by 1-m-high dam. TRT: 00:07:22
2010_08_26 Dam-breach experiment at foot of flume: water impounded by 1-m-high dam. TRT: 00:05:44
2011
2011_08_16 Debris flow, sand, gravel & loam on rough bed (6m3). TRT: 00:05:32
2011_08_18 Debris flow, sand, gravel & loam on erodible bed (6m3). TRT: 00:07:35
2011_08_24 Debris flow, sand, gravel & loam on erodible bed (6m3). TRT: 00:05:28
2011_08_25 Dam-break water flood over debris-flow deposit. TRT: 00:02:11
2012
2012_06_13 Dam-breach experiment at foot of flume: water impounded by 1-m-high dam. TRT:00:05:23
2012_06_14 Dam-breach experiment at foot of flume: water impounded by 0.77-m-high dam. TRT:00:12:02
2012_06_19 Dam-breach experiment at foot of flume: water impounded by 0.77-m-high dam. TRT:00:15:47
2012_06_20 Dam-breach experiment at foot of flume: water impounded by 0.58-m-high dam. TRT:00:30:27
2012_06_21 Dam-breach experiment at foot of flume: water impounded by 0.58-m-high dam. TRT:00:24:45
2012_08_22 Debris flow, sand, gravel & loam on erodible bed (6m3). TRT: 00:05:45
2012_08_23 Debris flow, sand, gravel & loam on rough bed (6m3). TRT: 00:04:45