#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 4113 UIRB UIRB 05520500 A 7/21/1999 9:20 REACH R bridge @ Highway 17 in Momence, downstream side Fitzpatrick, Faith, Teyt,Sarah, Adolphson,Woessner Good Maybe should have had more than 30m between transects. Wadable, but wide enough that a boat would be required for excellent sampling. Not Modified 300 30 245 745 Both Both rebar on left bank with orange flagging, flagging on right bank. located 3m south of LEW, 7m north of center of brick building, 4m east of large multiple trunked silver maple, and 2m northeast of red wood. yellow-capped rebar in grass about 3m from LEW, 1.5m west of upright maple, 2.5m above GS. GPS: 41 09 34.65 87 40 07.36 0.000467 Surveying Level Maybe should have had more than 30m between transects. Wadable, but wide enough that a boat would be required for excellent sampling. 1/27/2000 12:03 6/25/2003 17:06