#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 22112 UIRB UIRB 05549850 A 7/17/2000 11:00 REACH R Bridge US side of Kelsey Rd. Tegt, Sarah, Stewart, Jana S., Wolf, Julie A. Excellent Slightly turbid, bank stabilization structure on us end of reach, some banks undercut Lightly affected 150 15 -164.4 -14.4 164.4 meters US of Kelsey Rd. Bridge t-1 is 14.4 m upstream of the bridge at Kelsey rd. Slightly turbid, bank stabilization structure on us end of reach, some banks undercut 8/2/2000 17:32 6/25/2003 17:06