KR01-12 PC LOG
PC-7
| Core: | PC-7 |
| Pilot: | PL-7 |
| Area: | North of Oahu |
| Date: | Augst/17/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | fine |
| Wind: | 90 deg , 9.5 knt |
| Latitude* | 24-01.8645 N |
| Longitude* | 155-05.2214W |
| Depth (m) | 4389 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 7:13 | Started winch operation | |||
| 7:35 | 0 | 8 | 18 | Started wire-out |
| 7:58 | 1000 | 15 | 60 | |
| 8:14 | 2000 | 20 | 60 | |
| 8:31 | 3000 | 23 | 60 | |
| 8:48 | 4000 | 35 | 60 | |
| 8:53 | 4300 | 36 | Stopped wire-out | |
| 8:56 | 4300 | 36 | 18 | Started slow wire-out |
| 9:03 | 4424 | 24 | 18 | PC reached to the bottom |
| 9:06 | 4390 | 51 | 18 | PC Left the bottom |
| 9:13 | 4000 | 37 | 70 | |
| 9:27 | 3000 | 35 | 70 | |
| 9:43 | 2000 | 25 | 45 | |
| 9:58 | 1000 | 15 | 70 | |
| 10:26 | 0 | PC surfaced | ||
| 10:35 | Ended winch operation |
PC-8
| Core: | PC-8 |
| Pilot: | PL-8 |
| Area: | North of Oahu |
| Date: | Augst/17/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | cloudy |
| Wind: | 92 deg , 10.3 knt |
| Latitude* | 23-56.0642 N |
| Longitude* | 156-12.2895W |
| Depth (m) | 4354 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 15:30 | Started winch operation | |||
| 15:54 | 0 | 8 | 18 | Started wire-out |
| 16:14 | 1000 | 15 | 60 | |
| 16:30 | 2000 | 20 | 60 | |
| 16:47 | 3000 | 26 | 60 | |
| 17:11 | 4000 | 43 | 60 | |
| 17:16 | 4200 | 28 | Stopped wire-out | |
| 17:17 | 4200 | 28 | 20 | Started slow wire-out |
| 17:25 | 4353 | 22 | 20 | PC reached to the bottom |
| 17:26 | 4334 | 47 | 18 | PC Left the bottom |
| 17:33 | 4000 | 40 | 70 | |
| 17:49 | 3000 | 32 | 70 | |
| 18:05 | 2000 | 25 | 70 | |
| 18:19 | 1000 | 17 | 70 | |
| 18:44 | 0 | PC surfaced | ||
| 18:50 | Ended winch operation |
PC-9
| Core: | PC-9 |
| Pilot: | PL-9 |
| Area: | Northeast of Hawaii Island |
| Date: | Augst/21/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | fine |
| Wind: | 68 deg , 9.0 knt |
| Latitude* | 21-00.0071N |
| Longitude* | 154-29.9809W |
| Depth (m) | 5444 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 6:06 | Started winch operation | |||
| 6:26 | 0 | 6 | 18 | Started wire-out |
| 6:47 | 1000 | 13 | 60 | |
| 7:04 | 2000 | 19 | 60 | |
| 7:20 | 3000 | 25 | 60 | |
| 7:37 | 4000 | 32 | 60 | |
| 7:54 | 5000 | 38 | 60 | |
| 8:00 | 5300 | 44 | Stopped wire-out | |
| 8:02 | 5300 | 44 | 20 | Started slow wire-out |
| 8:10 | 5443 | 26 | 20 | PC reached to the bottom |
| 8:11 | 5433 | 57 | 20 | PC Left the bottom |
| 8:22 | 5000 | 42 | 60 | |
| 8:39 | 4000 | 35 | 70 | |
| 8:57 | 3000 | 27 | 70 | |
| 9:17 | 2000 | 23 | 70 | |
| 9:35 | 1000 | 13 | 60 | |
| 10:00 | 0 | PC surfaced | ||
| 10:09 | Ended winch operation |
PC-10
| Core: | PC-10 |
| Pilot: | PL-10 |
| Area: | Northeast of Hawaii Island |
| Date: | Augst/21/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | Fine |
| Wind: | 50 deg , 5.2 knt |
| Latitude* | 20-10.1520 N |
| Longitude* | 154-00.9561W |
| Depth (m) | 5375 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 14:21 | Started winch operation | |||
| 14:40 | 0 | 5 | 20 | Started wire-out |
| 14:59 | 1000 | 12 | 60 | |
| 15:16 | 2000 | 18 | 60 | |
| 15:33 | 3000 | 24 | 60 | |
| 15:49 | 4000 | 30 | 60 | |
| 16:06 | 5000 | 37 | 60 | |
| 16:11 | 5250 | 42 | Stopped wire-out | |
| 16:13 | 5250 | 42 | 18 | Started slow wire-out |
| 16:23 | 5419 | 30 | 18 | PC reached to the bottom |
| 16:24 | 5395 | 71 | 18 | PC Left the bottom |
| 16:33 | 5000 | 45 | 70 | |
| 16:49 | 4000 | 39 | 70 | |
| 17:05 | 3000 | 25 | 70 | |
| 17:20 | 2000 | 23 | 70 | |
| 17:36 | 1000 | 15 | 70 | |
| 17:58 | 0 | PC surfaced | ||
| 18:08 | Ended winch operation |
PC-11
| Core: | PC-11 |
| Pilot: | PL-11 |
| Area: | South of Hawaii Island |
| Date: | Augst/22/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | Fine |
| Wind: | 26 deg , 7.9 knt |
| Latitude* | 17-51.9247 N |
| Longitude* | 153-47.2414W |
| Depth (m) | 4947 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 6:03 | Started winch operation | |||
| 6:20 | 0 | 5 | 20 | Started wire-out |
| 6:39 | 1000 | 14 | 60 | |
| 6:56 | 2000 | 20 | 60 | |
| 7:13 | 3000 | 24 | 60 | |
| 7:29 | 4000 | 31 | 60 | |
| 7:44 | 4850 | 35 | Stopped wire-out | |
| 7:47 | 4850 | 35 | 20 | Started slow wire-out |
| 7:54 | 4979 | 24 | 20 | PC reached to the bottom |
| 7:55 | 4969 | 50 | 20 | PC Left the bottom |
| 8:12 | 4000 | 38 | 70 | |
| 8:26 | 3000 | 31 | 70 | |
| 8:41 | 2000 | 22 | 70 | |
| 8:57 | 1000 | 15 | 70 | |
| 9:18 | 0 | PC surfaced | ||
| 9:27 | Ended winch operation |
PC-12
| Core: | PC-12 |
| Pilot: | PL-12 |
| Area: | South of Hawaii Island |
| Date: | Augst/22/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | Fine |
| Wind: | 71 deg , 9.9 knt |
| Latitude* | 17-02.2467N |
| Longitude* | 153-03.6493W |
| Depth (m) | 5201 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 14:19 | Started winch operation | |||
| 14:36 | 0 | 5 | 20 | Started wire-out |
| 14:56 | 1000 | 13 | 60 | |
| 15:12 | 2000 | 19 | 60 | |
| 15:29 | 3000 | 25 | 60 | |
| 15:46 | 4000 | 30 | 60 | |
| 16:03 | 5000 | 37 | 60 | |
| 16:05 | 5100 | 39 | Stopped wire-out | |
| 16:07 | 5100 | 39 | 18 | Started slow wire-out |
| 16:16 | 5250 | 30 | 18 | PC reached to the bottom |
| 16:17 | 5239 | 63 | 18 | PC Left the bottom |
| 16:25 | 5000 | 42 | 70 | |
| 16:40 | 4000 | 36 | 70 | |
| 16:56 | 3000 | 30 | 70 | |
| 17:13 | 2000 | 21 | 70 | |
| 17:32 | 1000 | 15 | 70 | |
| 17:56 | 0 | PC surfaced | ||
| 18:04 | Ended winch operation |
PC-13
| Core: | PC-13 |
| Pilot: | PL-13 |
| Area: | South of Hawaii Island |
| Date: | Augst/23/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | Fine |
| Wind: | 97 deg , 6.2 knt |
| Latitude* | 18-36.3386N |
| Longitude* | 156-46.9997E |
| Depth (m) | 4575 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 14:08 | Started winch operation | |||
| 14:18 | 0 | 6 | 20 | Started wire-out |
| 14:37 | 1000 | 11 | 60 | |
| 14:54 | 2000 | 21 | 60 | |
| 15:11 | 3000 | 26 | 60 | |
| 15:27 | 4000 | 32 | 60 | |
| 15:36 | 4450 | 35 | Stopped wire-out | |
| 15:38 | 4450 | 35 | 18 | Started slow wire-out |
| 15:47 | 4608 | 23 | 18 | PC reached to the bottom |
| 15:48 | 4592 | 45 | 18 | PC Left the bottom |
| 16:00 | 4000 | 35 | 70 | |
| 16:16 | 3000 | 30 | 70 | |
| 16:32 | 2000 | 22 | 70 | |
| 16:51 | 1000 | 14 | 70 | |
| 17:08 | 0 | PC surfaced | ||
| 17:25 | Ended winch operation |
PC-14
| Core: | PC-14 |
| Pilot: | PL-14 |
| Area: | South of Oahu Island |
| Date: | Augst/24/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | Fine |
| Wind: | 112 deg , 4.6 knt |
| Latitude* | 19-59.9795N |
| Longitude* | 158-27.9865W |
| Depth (m) | 4344 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 6:05 | Started winch operation | |||
| 6:16 | 0 | 5 | 20 | Started wire-out |
| 6:36 | 1000 | 12 | 60 | |
| 6:52 | 2000 | 19 | 60 | |
| 7:09 | 3000 | 26 | 60 | |
| 7:26 | 4000 | 30 | 60 | |
| 7:30 | 4250 | 32 | Stopped wire-out | |
| 7:33 | 4250 | 32 | 20 | Started slow wire-out |
| 7:39 | 4371 | 31 | 20 | PC reached to the bottom |
| 7:40 | 4360 | 41 | 20 | PC Left the bottom |
| 7:46 | 4000 | 35 | 70 | |
| 8:03 | 3000 | 30 | 70 | |
| 8:28 | 2000 | 22 | 70 | |
| 8:51 | 1000 | 15 | 70 | |
| 9:10 | 0 | PC surfaced | ||
| 9:30 | Ended winch operation |
PC-15
| Core: | PC-15 |
| Pilot: | PL-15 |
| Area: | South of Oahu Island |
| Date: | Augst/25/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | Fine |
| Wind: | 139 deg , 3.0 knt |
| Latitude* | 20-25.1469N |
| Longitude* | 159-26.6639W |
| Depth (m) | 4543 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 5:49 | Started winch operation | |||
| 6:01 | 0 | 5 | 20 | Started wire-out |
| 6:21 | 1000 | 12 | 60 | |
| 6:38 | 2000 | 19 | 60 | |
| 6:54 | 3000 | 25 | 60 | |
| 7:11 | 4000 | 30 | 60 | |
| 7:18 | 4450 | 35 | Stopped wire-out | |
| 7:20 | 4450 | 35 | 20 | Started slow wire-out |
| 7:27 | 4583 | 18 | 20 | PC reached to the bottom |
| 7:28 | 4577 | 43 | 20 | PC Left the bottom |
| 7:41 | 4000 | 35 | 70 | |
| 8:01 | 3000 | 28 | 70 | |
| 8:18 | 2000 | 24 | 70 | |
| 8:37 | 1000 | 15 | 70 | |
| 9:05 | 0 | PC surfaced | ||
| 9:12 | Ended winch operation |
| Core: | Unnamed |
| Pilot: | Unnamed |
| Area: | Northeast of Oahu Island |
| Date: | Augst/19/2001 |
| Length of pipes: | 10m |
| Length of main wire: | 17.8m |
| Length of Pilot wire: | 18.8m |
| Length of free fall: | 5.55m |
| Weather: | fine |
| Wind: | 79 deg , 10.2 knt |
| Latitude* | 22-00.0603 N |
| Longitude* | 155-29.5440W |
| Depth (m) | 4838 |
| Time | Wire-length (m) | Tension (kN) | Wire-speed (m/min) | Remarks |
| 6:13 | Started winch operation | |||
| 6:28 | 0 | 6 | 18 | Started wire-out |
| 6:48 | 1000 | 13 | 60 | |
| 7:04 | 2000 | 22 | 60 | |
| 7:22 | 3000 | 26 | 60 | |
| 7:39 | 4000 | 35 | 60 | |
| 7:51 | 4700 | 39 | Stopped wire-out | |
| 7:53 | 4700 | 39 | 18 | Started slow wire-out |
| 8:04 | 4889 | uncertain | 18 | PC reached to the bottom ? |
| 8:06 | 4850 | uncertain | 18 | PC Left the bottom ? |
| 8:23 | 4000 | 37 | 70 | |
| 8:38 | 3000 | 32 | 70 | |
| 8:54 | 2000 | 24 | 70 | |
| 9:10 | 1000 | 16 | 70 | |
| 9:37 | 0 | PC surfaced | ||
| 9:46 | Ended winch operation |