Link to USGS Home

U.S. Geological Survey Open-File Report 03-307

Ratio of post-densification qc value (measured 1 to 30 days after densification) to pre-densification qc value for different areas and densification procedures (from Mesri et al., 1990).

[an error occurred while processing this directive]