<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:contributor>Larry M. Pisto</dc:contributor>
  <dc:contributor>Bruce B. Howell</dc:contributor>
  <dc:contributor>Roderick A. Hutchnson</dc:contributor>
  <dc:contributor>Anon</dc:contributor>
  <dc:creator>Robert O. Fournier</dc:creator>
  <dc:date>1993</dc:date>
  <dc:description>In November 1992 the valve at the top of a U.S. Geological Survey drill hole in Yellowstone National Park parted from the casting as a result of corrosion. This allowed uncontrolled venting of boiling water and steam from the well at an estimated liquid flow rate of about 25-50 gallons per minute. A flow diverter assembly was designed, fabricated and installed on the well within 16 days, which allowed drill rods to be safely stripped into the well through on annular Blow-Out Preventer. Once this was accomplished it was a relatively routine matter to set a packer in the casting and cement the well shut permanently. The drill hole was brought under control and cemented shut within 18 days of the wellhead failure at a total cost of $47,066, which was about $5,000 less than anticipated.</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:language>en</dc:language>
  <dc:publisher>Publ by Geothermal Resources Council</dc:publisher>
  <dc:title>Taming a wild geothermal research well in yellowstone national park</dc:title>
  <dc:type>text</dc:type>
</oai_dc:dc>