<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>James C. Storey</dc:creator>
  <dc:date>2001</dc:date>
  <dc:description>&lt;p&gt;&lt;span&gt;The Landsat 7 spacecraft and its Enhanced Thematic Mapper Plus (ETM+) were launched on April 15, 1999. Pre-launch modeling of the ETM+ optical system predicted that modulation transfer function (MTF) performance would change on-orbit. A method was developed to monitor the along-scan MTF performance of the ETM+ sensor system using on-orbit data of the Lake Pontchartrain Causeway in Louisiana. ETM+ image scan lines crossing the bridge were treated as multiple measurements of the target taken at varying sampling phases. These line measurements were interleaved to construct an over-sampled target profile for each ETM+ system transfer function. Model parameters were adjusted to achieve the best fit between the simulated profiles and the image measurements. The ETM+ modulation at the Nyquist frequency and the full width at half maximum of the point spread function were computed from the best-fit system transfer function model. Trending these parameters over time revealed apparent MTF performance degradation, observed mainly in the 15-meter resolution ETM+ panchromatic band. This confirmed the pre-launch model prediction that the panchromatic band was the most sensitive to changes in ETM+ optical performance.&lt;/span&gt;&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.1117/12.450647</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>SPIE</dc:publisher>
  <dc:title>Landsat 7 on-orbit modulation transfer function estimation</dc:title>
  <dc:type>text</dc:type>
</oai_dc:dc>