<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>Lloyd A. Reed</dc:creator>
  <dc:date>1971</dc:date>
  <dc:description>&lt;p&gt;This report shows the effects that the construction of half a mile of one-lane roadway during June, July, and August 1970 and construction of a 5-acre pond during August and September 1970, had on sediment concentrations and sediment discharge of a stream draining an area of 0.76 square mile. The effects of the construction are shown by comparing the data collected from the affected basin with data collected from a similar adjacent basin, unaffected by construction.&lt;/p&gt;&lt;p&gt;During the pond construction, base-flow sediment concentrations increased from the expected 6 mg/1 (milligrams per liter) to an average of 35 mg/l. Sediment discharge during June through December 1970 attributable to the construction was 55 tons, two-thirds of the amount normally expected during a year.&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr71234</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Effects of roadway and pond construction on sediment yield near Harrisburg, Pennsylvania</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>