<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>Peter M. Jorgensen</dc:creator>
  <dc:date>1981</dc:date>
  <dc:description>&lt;p&gt;This portion of the Cache Creek-Little Granite Creek EIS Data Gathering and Evaluation Study had two central objectives.&lt;/p&gt;&lt;p&gt;The first was to review all land access possibilities to the NCRA Cache Creek and to the Getty-Reserve Little Granite Creek proposed drilling sites. Based on this review, the preferred access corridor to each site was selected.&lt;/p&gt;&lt;p&gt;The second objective was to perform a reconnaissance survey of a feasible route within the selected corridor. Soils and design data were collected for the development of cost estimates and for use in studies being performed by other disciplines.&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr81858</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Identification of transportation route alternatives and engineering feasibility studies for Bridger-Teton National Forest, Cache Creek, and Little Granite Creek EIS data gathering and evaluation</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>