  <dc:description>&lt;p&gt;This report provides the results of a detailed Level II analysis of scour potential at structure 
HUNTTH00010012 on Town Highway 1 crossing Brush Brook, Huntington, Vermont 
(figures 1–9). A Level II study is a basic engineering analysis of the site, including a 
quantitative analysis of stream stability and scour (U.S. Department of Transportation, 
1993). Results of a Level I scour investigation also are included in Appendix E of this 
report. A Level I investigation provides a qualitative geomorphic characterization of the 
study site. Information on the bridge, gleaned from Vermont Agency of Transportation 
(VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is 
found in Appendix D.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;In August 1976, Hurricane Belle caused flooding at this site which resulted in road and 
bridge damage (figures 7-8). This was approximately a 25-year flood event based on flood-
frequency data contained in the Flood Insurance Study for the Town of Huntington (U.S. 
Department of Housing and Urban Development, 1978).&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The site is in the Green Mountain section of the New England physiographic province in 
central Vermont. The 9.19-mi&lt;sup&gt;2&lt;/sup&gt;
 drainage area is in a predominantly rural and forested basin. 
In the vicinity of the study site, the surface cover is pasture while the immediate banks have 
some woody vegetation. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;In the study area, the Brush Brook has a sinuous channel with a slope of approximately 0.02 
ft/ft, an average channel top width of 62 ft and an average bank height of 5 ft. The channel 
bed material ranges from gravel to cobble with a median grain size (D&lt;sub&gt;50&lt;/sub&gt;) of 100.0 mm 
(0.328 ft). The geomorphic assessment at the time of the Level I and Level II site visit on 
June 25, 1996, indicated that the reach was stable.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The Town Highway 1 crossing of Brush Brook is a 64-ft-long, two-lane bridge consisting of 
one 62-foot steel-stringer span (Vermont Agency of Transportation, written 
communication, November 30, 1995). The bridge is supported by vertical, concrete 
abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening 
while the opening-skew-to-roadway is 6 degrees. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Channel scour 2.2 ft deeper than the mean thalweg depth was observed along the upstream 
right bank and along the base of the spill-through protection for the right abutment during 
the Level I assessment. Scour protection measured at the site was type-2 stone fill (less 
than 36 inches diameter) along the upstream left and right banks and in front of all four 
wingwalls. In front of the abutments, there was type-3 stone fill (less than 48 inches 
diameter) forming a spill-through slope. Additional details describing conditions at the site 
are included in the Level II Summary and Appendices D and E.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Scour depths and recommended rock rip-rap sizes were computed using the general 
guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). 
Total scour at a highway crossing is comprised of three components: 1) long-term 
streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction 
in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and 
abutments). Total scour is the sum of the three components. Equations are available to 
compute depths for contraction and local scour and a summary of the results of these 
computations follows.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;There was no computed contraction scour for any modelled flow. Abutment scour ranged 
from 1.4 to 2.8 ft. The worst-case abutment scour occurred at the 500-year discharge. 
Additional information on scour depths and depths to armoring are included in the section 
titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, 
are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is 
presented in figure 9. Scour depths were calculated assuming an infinite depth of erosive 
material and a homogeneous particle-size distribution. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;It is generally accepted that the Froehlich equation (abutment scour) gives “excessively 
conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, 
computed scour depths are evaluated in combination with other information including (but 
not limited to) historical performance during flood events, the geomorphic stability 
assessment, existing scour protection measures, and the results of the hydraulic analyses. 
Therefore, scour depths adopted by VTAOT may differ from the computed values 
documented herein.&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr97226</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Level II scour analysis for Bridge 12 (HUNTTH00010012) on Town Highway 001, crossing Brush Brook, Huntington, Vermont</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>