<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:contributor>Robert E. Hammond</dc:contributor>
  <dc:creator>Michael A. Ivanoff</dc:creator>
  <dc:date>1997</dc:date>
  <dc:description>&lt;p&gt;This report provides the results of a detailed Level II analysis of scour potential at structure 
CAMBTH00750053 on Town Highway 75 crossing the Brewster River, Cambridge, 
Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including 
a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 
1993). Results of a Level I scour investigation also are included in Appendix E of this 
report. A Level I investigation provides a qualitative geomorphic characterization of the 
study site. Information on the bridge, gleaned from Vermont Agency of Transportation 
(VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is 
found in Appendix D.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The site is in the Green Mountain section of the New England physiographic province in 
northwestern Vermont. The 4.30-mi&lt;sup&gt;2&lt;/sup&gt;
 drainage area is in a predominantly rural and forested 
basin. In the vicinity of the study site, the surface cover is forest, except for the downstream 
right overbank area which has a barn surrounded by grass and shrubs.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;In the study area, the Brewster River has an incised, straight channel with a slope of 
approximately 0.05 ft/ft, an average channel top width of 62 ft and an average bank height 
of 12 ft. The channel bed material ranges from gravel to boulder with a median grain size 
(D&lt;sub&gt;50&lt;/sub&gt;) of 84.4 mm (0.277 ft). The geomorphic assessment at the time of the Level I and 
Level II site visit on July 11, 1995, indicated that the reach was stable.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The Town Highway 75 crossing of the Brewster River is a 28-ft-long, two-lane bridge 
consisting of one 24-foot concrete tee-beam span (Vermont Agency of Transportation, 
written communication, March 8, 1995). The opening length of the structure parallel to the 
bridge face is 22.4 ft. The bridge is supported by vertical, concrete abutments with 
wingwalls. The channel is skewed approximately 40 degrees to the opening while the 
opening-skew-to-roadway as surveyed is 10 degrees.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;A scour hole 1 ft deeper than the mean thalweg depth was observed along the left abutment 
during the Level I assessment. The scour counter-measures at the site included type-3 stone 
fill (less than 48 inches diameter) along the entire base length of the upstream left wingwall. 
There was also type-4 stone fill (less than 60 inches diameter) along the downstream end of 
the downstream right wingwall. Additional details describing conditions at the site are 
included in the Level II Summary and Appendices D and E.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Scour depths and recommended rock rip-rap sizes were computed using the general 
guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). 
Total scour at a highway crossing is comprised of three components: 1) long-term 
streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction 
in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and 
abutments). Total scour is the sum of the three components. Equations are available to 
compute depths for contraction and local scour and a summary of the results of these 
computations follows.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Contraction scour for all modelled flows ranged from 1.1 to 1.4 ft. The worst-case 
contraction scour occurred at the 100-year discharge. Abutment scour ranged from 10.7 to 
17.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional 
information on scour depths and depths to armoring are included in the section titled “Scour 
Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented 
in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 
8. Scour depths were calculated assuming an infinite depth of erosive material and a 
homogeneous particle-size distribution. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;It is generally accepted that the Froehlich equation (abutment scour) gives “excessively 
conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, 
computed scour depths are evaluated in combination with other information including (but 
not limited to) historical performance during flood events, the geomorphic stability 
assessment, existing scour protection measures, and the results of the hydraulic analyses. 
Therefore, scour depths adopted by VTAOT may differ from the computed values 
documented herein.&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr97647</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Level II scour analysis for Bridge 53 (CAMBTH00750053) on Town Highway 75, crossing the Brewster River, Cambridge, Vermont</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>