<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:contributor>Michael A. Ivanoff</dc:contributor>
  <dc:creator>Ronda L. Burns</dc:creator>
  <dc:date>1997</dc:date>
  <dc:description>&lt;p&gt;This report provides the results of a detailed Level II analysis of scour potential at structure 
HUNTTH00210034 on Town Highway 21 crossing Brush Brook, Huntington, Vermont 
(figures 1–8). A Level II study is a basic engineering analysis of the site, including a 
quantitative analysis of stream stability and scour (U.S. Department of Transportation, 
1993). Results of a Level I scour investigation also are included in Appendix E of this 
report. A Level I investigation provides a qualitative geomorphic characterization of the 
study site. Information on the bridge, gleaned from Vermont Agency of Transportation 
(VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is 
found in Appendix D.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The site is in the Green Mountain section of the New England physiographic province in 
central Vermont. The 6.23-mi&lt;sup&gt;2&lt;/sup&gt;
 drainage area is in a predominantly rural and forested basin. 
In the vicinity of the study site, the surface cover is forest.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;In the study area, Brush Brook has an incised, straight channel with a slope of 
approximately 0.03 ft/ft, an average channel top width of 43 ft and an average bank height 
of 4 ft. The channel bed material ranges from gravel to boulder with a median grain size 
(D&lt;sub&gt;50&lt;/sub&gt;) of 90.0 mm (0.295 ft). The geomorphic assessment at the time of the Level I and 
Level II site visit on June 26, 1996, indicated that the reach was stable.
&lt;br/&gt;
&lt;p&gt;The Town Highway 21 crossing of Brush Brook is a 28-ft-long, one-lane bridge consisting 
of one 26-foot steel-beam span with a timber deck (Vermont Agency of Transportation, 
written communication November 30, 1995). The opening length of the structure parallel to 
the bridge face is 25.4 ft. The bridge is supported by vertical, concrete abutments with a 
wingwall on the upstream right. The channel is skewed approximately 5 degrees to the 
opening and the computed opening-skew-to-roadway is 5 degrees. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;A tributary enters Brush Brook on the right bank immediately downstream of the bridge. 
At the confluence, the left bank of Brush Brook is eroded and there is a small void under the 
downstream end of the left abutment footing which is completely exposed. The right 
abutment footing is also exposed. The scour countermeasures at the site include type-2 
stone fill (less than 36 inches diameter) along the upstream banks and in front of the right 
abutment and type-3 stone fill (less than 48 inches diameter) along the entire base length of 
the upstream right wingwall and along the downstream right bank. Additional details 
describing conditions at the site are included in the Level II Summary and Appendices D 
and E.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Scour depths and recommended rock rip-rap sizes were computed using the general 
guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) 
for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping 
discharge is determined and analyzed as another potential worst-case scour scenario. Total 
scour at a highway crossing is comprised of three components: 1) long-term streambed 
degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow 
area at a bridge) and; 3) local scour (caused by accelerated flow around piers and 
abutments). Total scour is the sum of the three components. Equations are available to 
compute depths for contraction and local scour and a summary of the results of these 
computations follows.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Contraction scour for all modelled flows ranged from 0.0 to 0.7 ft. The worst-case 
contraction scour occurred at the incipient roadway-overtopping discharge, which was less 
than the 100-year discharge. Abutment scour ranged from 6.9 to 10.9 ft. The worst-case 
abutment scour occurred at the 500-year discharge. Additional information on scour depths 
and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. 
A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths 
were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;It is generally accepted that the Froehlich equation (abutment scour) gives “excessively 
conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, 
computed scour depths are evaluated in combination with other information including (but 
not limited to) historical performance during flood events, the geomorphic stability 
assessment, existing scour protection measures, and the results of the hydraulic analyses. 
Therefore, scour depths adopted by VTAOT may differ from the computed values 
documented herein.&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr97663</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Level II scour analysis for Bridge 34 (HUNTTH00210034) on Town Highway 21, crossing Brush Brook, Huntington, Vermont</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>