  <dc:contributor>Robert E. Hammond</dc:contributor>
  <dc:creator>Michael A. Ivanoff</dc:creator>
  <dc:date>1997</dc:date>
  <dc:description>&lt;p&gt;This report provides the results of a detailed Level II analysis of scour potential at structure 
BRNETH00070045 on Town Highway 7 crossing the Stevens River, Barnet, Vermont 
(figures 1–8). A Level II study is a basic engineering analysis of the site, including a 
quantitative analysis of stream stability and scour (U.S. Department of Transportation, 
1993). Results of a Level I scour investigation also are included in Appendix E of this 
report. A Level I investigation provides a qualitative geomorphic characterization of the 
study site. Information on the bridge, gleaned from Vermont Agency of Transportation 
(VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is 
found in Appendix D.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The site is in the New England Upland section of the New England physiographic province 
in east-central Vermont. The 41.5-mi&lt;sup&gt;2&lt;/sup&gt;
 drainage area is in a predominantly rural and forested 
basin. In the vicinity of the study site, the surface cover is forest upstream and pasture 
downstream of the bridge while the immediate banks have dense woody vegetation. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;In the study area, the Stevens River has an incised, sinuous channel with a slope of 
approximately 0.02 ft/ft, an average channel top width of 100 ft and an average bank height 
of 17 ft. The channel bed material ranges from gravel to boulder with a median grain size 
(D&lt;sub&gt;50&lt;/sub&gt;) of 105 mm (0.344 ft). The geomorphic assessment at the time of the Level I and Level 
II site visit on August 22, 1995, indicated that the reach was stable.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The Town Highway 7 crossing of the Stevens River is a 37-ft-long, two-lane bridge 
consisting of one 34-foot concrete slab span (Vermont Agency of Transportation, written 
communication, March 16, 1995). The opening length of the structure parallel to the bridge 
face is 33 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The 
channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 20 degrees. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;The only scour protection measure at the site was type-2 stone fill (less than 36 inches 
diameter) along the entire left and right abutments, upstream and downstream wingwalls, 
and upstream and downstream banks. Additional details describing conditions at the site are 
included in the Level II Summary and Appendices D and E.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Scour depths and recommended rock rip-rap sizes were computed using the general 
guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) 
for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping 
discharge is determined and analyzed as another potential worst-case scour scenario. Total 
scour at a highway crossing is comprised of three components: 1) long-term streambed 
degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow 
area at a bridge) and; 3) local scour (caused by accelerated flow around piers and 
abutments). Total scour is the sum of the three components. Equations are available to 
compute depths for contraction and local scour and a summary of the results of these 
computations follows.&lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;Contraction scour for all modelled flows ranged from 0.8 to 5.4 ft. The worst-case 
contraction scour occurred at the incipient roadway-overtopping discharge, which was 
greater than the 100-year discharge. Left abutment scour ranged from 21.8 to 28.6 ft. The 
worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour 
ranged from 14.6 to 17.4 ft. The worst-case right abutment scour occurred at the incipient 
roadway-overtopping discharge. Additional information on scour depths and depths to 
armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, 
based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the 
scour computed at the bridge is presented in figure 8. Scour depths were calculated 
assuming an infinite depth of erosive material and a homogeneous particle-size distribution. &lt;/p&gt;
&lt;br/&gt;
&lt;p&gt;It is generally accepted that the Froehlich equation (abutment scour) gives “excessively 
conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, 
computed scour depths are evaluated in combination with other information including (but 
not limited to) historical performance during flood events, the geomorphic stability 
assessment, existing scour protection measures, and the results of the hydraulic analyses. 
Therefore, scour depths adopted by VTAOT may differ from the computed values 
documented herein.&lt;/p&gt;</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr97753</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Level II scour analysis for Bridge 45 (BRNETH00070045) on Town Highway 7, crossing the Stevens River, Barnet, Vermont</dc:title>
  <dc:type>reports</dc:type>