  <dc:description>This report provides the results of a detailed Level II analysis of scour potential at structure 
NEWBTH00500016 on Town Highway 50 crossing Halls Brook, Newbury, Vermont 
(figures 1–8). A Level II study is a basic engineering analysis of the site, including a 
quantitative analysis of stream stability and scour (U.S. Department of Transportation, 
1993). Results of a Level I scour investigation also are included in Appendix E of this 
report. A Level I investigation provides a qualitative geomorphic characterization of the 
study site. Information on the bridge, gleaned from Vermont Agency of Transportation 
(VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is 
found in Appendix D.
The site is in the New England Upland section of the New England physiographic province 
in east-central Vermont. The 23.4-mi&lt;sup&gt;2&lt;/sup&gt;
 drainage area is in a predominantly rural and forested 
basin. In the vicinity of the study site, the surface cover is shrub and brushland.
In the study area, Halls Brook has an incised, sinuous channel with a slope of approximately 
0.02 ft/ft, an average channel top width of 53 ft and an average bank height of 7 ft. The 
channel bed material ranges from silt to gravel with a median grain size (D&lt;sub&gt;50&lt;/sub&gt;) of 40.4 mm 
(0.133 ft). The geomorphic assessment at the time of the Level I and Level II site visit on 
August 29, 1995, indicated that the reach was laterally unstable. The channel bed and banks 
are composed of fine material and show signs of erosion. There is also evidence of beaver 
activity in the area.
The Town Highway 50 crossing of Halls Brook is a 44-ft-long, two-lane bridge consisting 
of one 38-foot prestressed concrete slab span (Vermont Agency of Transportation, written 
communication, March 27, 1995). The opening length of the structure parallel to the bridge 
face is 35.2 ft. The bridge is supported by vertical, stone masonry abutments. The channel is 
skewed approximately 40 degrees to the opening while the computed opening-skew-toroadway is 5 degrees. 
A channel scour hole 1.0 ft deeper than the mean thalweg depth was observed just upstream 
of the bridge behind the remains of a beaver dam during the Level I assessment. An 
additional channel scour hole 4.5 ft deeper than the mean thalweg depth was observed in the 
downstream reach. The scour countermeasures at the site included type-1 stone fill (less 
than 12 inches diameter) along the left abutment and type-2 stone fill (less than 36 inches 
diameter) along the right abutment and left bank upstream and downstream. Along the 
downstream right bank is type-3 stone fill (less than 48 inches diameter) and along the 
upstream right bank is type-4 stone fill (less than 60 inches diameter). Additional details 
describing conditions at the site are included in the Level II Summary and Appendices D 
and E.
Scour depths and recommended rock rip-rap sizes were computed using the general 
guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) 
for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping 
discharge was analyzed since it has the potential of being the worst-case scour scenario. 
Total scour at a highway crossing is comprised of three components: 1) long-term 
streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction 
in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and 
abutments). Total scour is the sum of the three components. Equations are available to 
compute depths for contraction and local scour and a summary of the results of these 
computations follows.
Contraction scour for all modelled flows ranged from 2.6 to 4.6 ft. The worst-case 
contraction scour occurred at the incipient roadway-overtopping discharge. The left 
abutment scour ranged from 11.6 to 12.1 ft. The worst-case left abutment scour occurred at 
the incipient road-overtopping discharge. The right abutment scour ranged from 13.6 to 
17.9 ft. The worst-case right abutment scour occurred at the 500-year discharge. Additional 
information on scour depths and depths to armoring are included in the section titled “Scour 
Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented 
in Tables 1 and 2. A cross-section of the scour computed at the bridge is presented in Figure 
8. Scour depths were calculated assuming an infinite depth of erosive material and a 
homogeneous particle-size distribution. 
It is generally accepted that the Froehlich equation (abutment scour) gives “excessively 
conservative estimates of scour depths” (Richardson and others, 1995, p. 46). Usually, 
computed scour depths are evaluated in combination with other information including (but 
not limited to) historical performance during flood events, the geomorphic stability 
assessment, existing scour protection measures, and the results of the hydraulic analyses. 
Therefore, scour depths adopted by VTAOT may differ from the computed values 
documented herein.</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/ofr97814</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey</dc:publisher>
  <dc:title>Level II scour analysis for Bridge 16, (NEWBTH00500016) on Town Highway 50, crossing Halls Brook, Newbury, Vermont</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>