<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>B. C. Ruddy</dc:creator>
  <dc:date>1987</dc:date>
  <dc:description>Stream-discharge data collected from May 1982 through October 1985 and sediment data collected from March 1985 through October 1985 at stream flow-gaging station 09041500 Muddy Creek at Kremmling, Colorado, were used to determine total-sediment discharge into the proposed Wolford Mountain Reservoir. The data were divided on a seasonal basis, and statistical relations between suspended-sediment discharge and stream discharge were determined for the rising stage, falling stage, and base-flow period. One statistical relation between bedload discharge and stream discharge was determined from all collected data. These relations were used with 3 years of daily stream-discharge data to estimate total-sediment discharge. Total-sediment discharge was largest prior to the annual peak stream discharge during the study period and decreased thereafter. At least 97% of the total-sediment discharge was suspended sediment. Mean annual total-sediment discharge in Muddy Creek near Kremmling was estimated to be 83,000 tons per year for the 1983 through 1985 water years. Water-storage capacity of the proposed Wolford Mountain Reservoir at site C would decrease 10% after 100 years at this rate of mean annual total-sediment discharge. (USGS)</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>10.3133/wri874011</dc:identifier>
  <dc:language>en</dc:language>
  <dc:publisher>U.S. Geological Survey,</dc:publisher>
  <dc:title>Sediment discharge in Muddy Creek and the effect of sedimentation rate on the proposed Wolford Mountain reservoir near Kremmling, Colorado</dc:title>
  <dc:type>reports</dc:type>
</oai_dc:dc>