Scientific Investigations Report 2007–5050
U.S. GEOLOGICAL SURVEY
Scientific Investigations Report 2007–5050
Version 1.1, April 2010
Table 6. Estimated ground-water discharge to principal stream reaches in the upper Klamath Basin, Oregon and California.
[Reach: River miles in Reach column are from Oregon Water Resources Department Klamath Drainage Basin Map, Map No. 14.6, 1971. Confidence level: Confidence levels represent a subjective assessment of the interval (plus or minus) that has a 95 percent probability of containing the true value. Confidence level categories are: 1, 10 percent; 2, 20 percent; 3, 30 percent; 4, 50 percent; 5, data insufficient to assess uncertainty. Subtotals rounded to two significant figures. Unless otherwise noted, values were derived by taking the average of estimated discharge in the fall (Sept, Oct, Nov). USGS synoptic measurement data from Leonard and Harris (1974). Abbreviations: BOR, Bureau of Reclamation; CDWR, California Department of Water Resources; Cr, Creek; ft3/s, cubic feet per second; Hwy, Highway; mi, mile; NA, not applicable; NPS, National Park Service; OWRD, Oregon Water Resources Department; R, River; Res, Reservoir; RM, river mile; RR, rail road; USFS, U.S. Forest Service; USGS, U.S. Geological Survey]
Number | Stream name | Reach | Estimated gain (+) or loss (-) (ft3/s) | Data source | Period of record | Methods | Remarks | Confidence level |
---|---|---|---|---|---|---|---|---|
1 | South Fork Sprague River | Headwaters to above Brownsworth Cr (RM 15.2) | 14 | USFS gage | 10/1992-09/1997 | Index regression to Chewaucan near Paisley, Oreg. (USGS site 10384000) | OWRD site 61420208 | 3 |
2 | Brownsworth Creek | Entire drainage | 5 | USFS measurements (46) | 12/1991-04/1997 | Miscellaneous measurement regression to Chewaucan near Paisley, Oreg. (USGS site 10384000) | OWRD site 21420206 | 3 |
3 | Fritz and Deming Creeks | Entire drainage of both creeks | 5 | N/A | N/A | Regional regression | 5 | |
14 | South Fork Sprague River | Brownsworth Cr (RM 15.2) to picnic area (RM 10.2) | 0 | USFS measurements (34) | 1/1992– 3/1996 | Miscellaneous measurement regression to Chewaucan near Paisley, Oreg. (USGS site 10384000). Mass balance. | OWRD site 21420201. Gains calculated from difference with upstream inflows. | 3 |
Subtotal for South Fork Sprague River | 24 | |||||||
5 | North Fork Sprague River | Headwaters to above Sandhill Crossing (RM 23.5) | 16 | USFS gage | 10/1992–9/1997 | Index regression to Chewaucan near Paisley, Oreg. (USGS site 10384000) | OWRD site 61420206 | 3 |
6 | North Fork Sprague River | Sandhill Crossing to The Elbow (RM 23.5 to RM 12.2) | 43 | USFS measurements (46) | 01/1992– 05/1997 | Miscellaneous measurement regression to Chewaucan near Paisley (USGS site 10384000). Mass balance. | OWRD site 21420202. Gains calculated from difference with upstream inflows. | 2 |
7 | Meryl Creek | Headwaters to approximately 1.5 mi above mouth | 13 | USGS/OWRD measurements (5) | 09/1915, 09/1954, 10/1970, 09/1983, 11/2000 | Average | Majority of measurements approximately 1.5 mi from mouth. | 4 |
8 | Fivemile Creek | Headwaters to approximately 4.0 mi above mouth | 20 | USGS/OWRD measurements (280) | 08/1917– 09/1973 | Miscellaneous measurement regression to Williamson R below Sprague R near Chiloquin, Oreg. (USGS site 11502500). | Measurements at USGS site 11497000. Used data as miscellaneous measurement site due to large amounts of missing data. | 1 |
19 | North Fork Sprague River | The Elbow (RM 12.2) to RM 1.5 | 0 | OWRD synoptic measurement | 11/2000 | Synoptic measurement | No gains other than tributary inflows. | 3 |
Subtotal for North Fork Sprague River | 92 | |||||||
10 | Upper Sprague River | South Fork Sprague at Picnic Area (RM 10.2) to Sprague at Cinder Pit (RM 77.5) | 26 | OWRD/USGS synoptic measurements (2) | 11/2000, 10/1970 | Average | Good agreement between seepage measurements. Discharge recorded at Beatty gage during synoptic measurements was close to long term average. | 3 |
11 | Upper Sprague River | Cinder Pit (RM 77.5) to OWRD gage at Beatty Gap (RM 75) | 26 | OWRD/USGS synoptic measurements (2) | 11/2000, 10/1970 | Average | Large difference between synoptic measurements. | 4 |
Subtotal for upper Sprague River | 52 | |||||||
112 | Lower Sprague River | OWRD gage at Beatty Gap (RM 75) to below old RR crossing (RM 74.2) | 34 | OWRD/USGS synoptic measurements (3) | 10/1970, 11/2000, 10/2002 | Average | Estimate includes gains from Medicine Springs (14 ft3/s from seven measurements). | 3 |
113 | Spring Creek | Headwater to mouth (Sprague RM 73.2). Note: Spring Creek is too short to show on figures; enters Sprague near Brown Creek. | 18 | OWRD synoptic measurements (2) | 11/2000, 10/2002 | Average | Good agreement between synoptic measurements. | 4 |
14 | Brown Creek | Headwater to 1 mi above confluence (Sprague RM 73) | 3 | OWRD synoptic measurements (2) | 11/2000, 10/2002 | Average | Good agreement between synoptic measurements. | 4 |
15 | Sprague River | Near old RR crossing (RM 74.2) to Watchdog Butte (RM 49) | 7 | OWRD/USGS synoptic measurements (2) | 11/2000, 10/1970 | Average | Gains within measurement error. However, some springs in the vicinity RM 69 and 70. Springs measured 4 ft3/s in 10/2002. Synoptic measurements made when flows recorded at USGS gage near Chiloquin were similar to long term average. | 4 |
16 | Whisky Creek | Headwaters to approximately 1.0 mi above mouth | 13 | OWRD/USGS synoptic measurements (3) | 10/1970, 11/2000, 10/2002 | Average | 1970 measurement about 10 ft3/s larger than others. | 4 |
117 | Sprague River | Watchdog Butte (RM 49) to below Trout Cr confluence (RM 37) | 0 | OWRD | 11/1/2000 | Synoptic measurement | Synoptic measurements made when flows recorded at USGS gage near Chiloquin were similar to long-term average fall flow. | 3 |
118 | Sprague River | Trout Cr confluence (RM 37) to bridge near Lone Pine (RM 33) | 0 | OWRD synoptic measurements (2) | 11/2000, 10/2002 | Average | Synoptic measurements on 10/1970 demonstrate gain of 30 ft3/s. Recent results do not concur with this finding. | 4 |
119 | Sprague River | Bridge near Lone Pine (RM 33) to above Wolff Ranch (RM 28.5) | 4 | OWRD/USGS synoptic measurements (3) | 10/1970, 11/2000, 10/2002 | Average | Gains within measurement error. | 3 |
20 | Sprague River | above Wolff Ranch (RM 28.5) to below Kamkaun Springs (RM 23.2) | 50 | OWRD synoptic measurements | 11/2000 | Synoptic measurement | Good agreement with average of 26 direct measurements on Kamkaun/McReady springs made from 04/1920 to 09/1973 | 2 |
21 | Sprague River | Kamkaun Springs (RM 23.2) to Hwy Bridge near Braymill (RM 10.1) | 19 | OWRD synoptic measurement | 11/2000 | Synoptic measurement | Gains probably near Whitehorse Spring | 3 |
122 | Sprague River | Braymill (RM 10.1) to Chiloquin (RM 5.2) | 0 | OWRD synoptic measurement | 11/2000 | Synoptic measurement | 3 | |
Subtotal for lower Sprague River | 150 | |||||||
123 | Long Creek | Headwaters to T31S, R12E, S5 | 9 | USFS gage | 10/1992–09/1997 | Index regression to Eagle Cr above Skull Cr, near New Bridge, Oreg. (USGS Site 13288200) | OWRD site 61420205 | 1 |
24 | Long Creek | T31S, R12E, S5 to mouth (Sycan Marsh) | 7 | N/A | N/A | Regional regression | Ungaged drainage area below USFS gage (OWRD site 61420205) | 5 |
25 | Sycan River | Headwaters to Sycan Marsh (RM 46.5) | 8 | USFS gage | 10/1992–09/1997 | Index regression to Deep Cr above Adel, Oreg. (USGS Site 10371500). | OWRD site 61420209 | 2 |
Subtotal for upper Sycan River | 24 | |||||||
126 | Sycan Marsh | Sycan Marsh | -10 to -20 | USFS gages | 10/1992–09/1997 | Mass balance and index regression of USFS gage below Sycan Marsh to Chewaucan R near Paisley (USGS Site 10384000). | OWRD site 61420210. Gains calculated from mass balance with upstream estimates during the fall. | 5 |
Subtotal for Sycan Marsh | -10 to -20 | |||||||
127 | Sycan River | Sycan Marsh Outlet (RM 35) to RM 30 (above Torrent Spring) | 0 | OWRD synoptic measurement | 08/2000 | Synoptic measurement | Overall gains from synoptic measurements below Sycan Marsh in 08/2000 is similar to average difference in fall flows from gages at OWRD site 61420210 to USGS Site 11499100. | 3 |
28 | Torrent Spring | Above and below Torrent Spring on Sycan R (RM 30 to RM 24) | 12 | OWRD/USFS synoptic measurements (5) | 10/1997, 10/1998, 08/1999, 10/1999, 08/2000 | Average | Synoptic measurement in 08/2000, plus additional synoptic measurements taken at RM 35 and RM 24. Overall gains from synoptic measurements below Sycan Marsh in 08/2000 is similar to average difference in fall flows from gages. | 3 |
129 | Sycan River | Below Torrent Springs (RM 24) to confluence with Blue Cr (RM 11) | 0 | OWRD synoptic measurement | 08/2000 | Synoptic measurement | Overall gains from synoptic measurements below Sycan Marsh in 08/2000 is similar to average difference in fall flows from gages at OWRD site 61420210 to USGS Site 11499100. | 3 |
130 | Brown Creek | 1/4 mi below spring | 4 | OWRD synoptic measurement | 08/2000 | Synoptic measurement | Overall gains from synoptic measurements below Sycan Marsh in 08/2000 is similar to average difference in fall flows from gages at OWRD site 61420210 to USGS Site 11499100. | 3 |
31 | Sycan River | Blue Cr confluence (RM 11) to OWRD gage (RM 3) | 5 | OWRD synoptic measurement | 08/2000 | Synoptic measurement | Overall gains from synoptic measurements below Sycan Marsh in 08/2000 is similar to average difference in fall flows from gages at OWRD site 61420210 to USGS Site 11499100. | 3 |
Subtotal for lower Sycan River | 21 | |||||||
32 | Williamson River | Head of River Springs (RM 86) | 8 | OWRD synoptic measurement | 11/2002 | Synoptic measurement | Dry conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 85 percent of average fall flows. | 2 |
33 | Williamson River | Head of River (RM 86) to downstream side of reservoir below Bull Pasture (RM 81) | 8 | OWRD synoptic measurement | 11/2002 | Synoptic measurement | Dry conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 85 percent of average fall flows. | 2 |
34 | Williamson River | Reservoir (RM 81) to above Wickiup Spring (RM 79.8) | 14 | OWRD synoptic measurement | 11/2002 | Synoptic measurement | Dry conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 85 percent of average fall flows. | 2 |
35 | Wickiup Spring | RM 79.8 | 24 | OWRD synoptic measurement | 11/2002 | Synoptic measurement | Dry conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 85 percent of average fall flows. | 2 |
136 | Williamson River | Below Wickiup Spring (RM 79.8) to OWRD gage below Sheep Cr (RM 67.7) | 0 | OWRD synoptic measurement | 11/2002 | Synoptic measurement | Dry conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 85 percent of average fall flows. | 2 |
37 | Jackson Creek | Headwaters to road crossing | 6 | USFS measurements (68) | 11/1991-04/1997 | Miscellaneous measurement regression to Chewaucan near Paisley, Oreg. (USGS Site 10384000). | OWRD site 21420110 | 4 |
38 | Jack Creek | Headwaters to Silver Lake Road | 2 | OWRD synoptic measurement | 03/2000 | Synoptic measurement | Wet conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 120 percent of average fall flows. | 4 |
39 | Williamson River | OWRD gage below Sheep Cr (RM 67.7) to above Cholo Ditch (RM 58.3) | 18 | OWRD synoptic measurement | 03/2000 | Synoptic measurement | Wet conditions. Synoptic measurements made when OWRD gage below Sheep Cr (USGS Site 11491400) at 120 percent of average fall flows. | 4 |
Subtotal for upper Williamson River | 80 | |||||||
40 | Klamath Marsh | Cholo Ditch (RM 58.3) to Kirks Reef (RM 27) | 50 | USFWS marsh stage measurements and OWRD, USGS, USFWS gage data | 1971–2000 | Mass balance. Annual Average | Mass balance used gaged inflows and outflows, precipitation recorded at Chemult, and marsh evapotranspiration rates from USFWS rates coupled with ungaged tributary flow estimates | 5 |
Subtotal for Klamath Marsh | 50 | |||||||
41 | Big Springs Creek | Headwaters to confluence with Lenz Cr | 34 | OWRD measurements (33) | 10/1916–09/1987 | Average | Synoptic measurements demonstrate some gains to creek below confluence with Lenz Cr and above mouth | 4 |
42 | Miller Creek | Headwaters to National Forest Boundary (RM 8.3) | 8 | USFS gage | 10/1992–09/1997 | Index regression to Eagle Cr above Skull Cr, near New Bridge, Oreg. (USGS Site 13288200) | OWRD site 61420102 | 3 |
43 | Sink Creek | Headwaters to RM 6.2 | 4 | USFS gage | 10/1995–09/1997 | Index regression to Eagle Cr above Skull Cr, near New Bridge, Oreg. (USGS Site 13288200) | OWRD site 61420104 | 2 |
44 | Scott Creek | Headwaters to above Highway 232 (RM 4.6) | 9 | OWRD(52) and USFS(50) measurements | 06/1929–05/1993 (OWRD) and 08/1991–05/1997 (USFS) | Miscellaneous measurement regression to Deschutes River below Snow Cr, near Lapine, Oreg. (USGS Site 14050000) | OWRD site 21420107 | 3 |
45 | Sand Creek | Headwaters to above Highway 232 (RM 5.8) | 23 | USFS gage | 10/1992–09/1997 | Index regression to Deschutes River below Snow Cr, near Lapine, Oreg. (USGS Site 14050000) | OWRD site 61420103 | 3 |
Subtotal for Klamath Marsh tributaries | 78 | |||||||
146 | Williamson River | Kirks Reef (RM 27) to base of falls near Calimus (RM 22.2) | 0 | OWRD synoptic measurement | 10/2002 | Synoptic measurement | 4 | |
47 | Williamson River | Calimus (RM 22.2) to old USGS Station 11494000 (RM 19.7) | 22 | OWRD measurements (16) | 10/1955–09/1973 | Average | Average of difference in concurrent flows recorded at Kirk (USGS Site 11493500) and below Road 9730 (USGS Site 11494000). From synoptic measurements on 10/2002, gains appear to occur below Calimus. | 3 |
148 | Larkin Creek | At Williamson confluence (RM 19.2) | 10 | OWRD measurements (27) | 10/1923–11/1985 | Average | OWRD site 21420105 | 3 |
149 | Larkin Springs | At Williamson confluence (RM 17.5) | 10 | OWRD synoptic measurement | 10/2002 | Synoptic measurement | 4 | |
50 | Williamson River | USGS gage (11494000) (RM 19.7) to Larkin Springs confluence (RM 17.5) | 6 | OWRD synoptic measurement | 10/2002 | Synoptic measurement | 4 | |
51 | Spring Creek | Just above Williamson confluence at RM 16.5 | 300 | OWRD measurements (39) | 09/1908– 09/1993 | Average | Small year to year variability | 1 |
Subtotal for lower Williamson River | 350 | |||||||
52 | Wood River | Headwater springs to Dixon Road (RM 16.2) | 250 | OWRD measurements (68) | 11/1925–09/1989 | Index regression to Fall River near Lapine, Oreg. (USGS Site 14057500) | OWRD site 21420395 | 1 |
53 | Annie Creek | Headwaters to National Park Boundary (RM 5.7) | 56 | USFS gage | 10/1992–09/1997 | Index regression to Deschutes River below Snow Cr, near Lapine, Oreg. (USGS Site 14050000) | OWRD site 61420301 | 2 |
54 | Sun Creek | Headwaters to National Park Boundary (RM 5.0) | 13 | NPS measurements (99) | 07/1989–09/1997 | Miscellaneous measurement regression to Deschutes River below Snow Cr, near Lapine, Oreg. (USGS Site 14050000) | OWRD site 21420310 | 2 |
55 | Fort Creek | Headwaters to near Hwy 62 (RM 1.0) | 84 | OWRD measurements (22) | 11/1954–03/1981 | Index regression to Fall River near Lapine, Oreg. (USGS Site 14057500) | OWRD site 21420398 | 1 |
56 | Crooked Creek | Headwaters to above Tecumseh Springs (RM 5.4) near Hwy 62 | 43 | OWRD measurements (16) | 11/1983–09/1987 | Average of all measurements | 2 | |
157 | Tecumseh Springs | Tecumseh Springs | 27 | USGS/OWRD measurements (7) | 08/1907–10/1909 | Average of all measurements | 3 | |
58 | Agency Creek | Headwaters to mouth | 21 | USGS/OWRD measurements (5) | 04/1924– 08/1954 | Average of all measurements | 3 | |
Subtotal for Wood River and tributaries | 490 | |||||||
59 | Sevenmile Creek | Headwaters to RM 17 | 18 | USFS gage | 10/1992–09/1997 | Index regression to North Umpqua River above Copeland Cr near Toketee Falls, Oreg. (USGS Site 14316500) | OWRD site 61420303 | 2 |
160 | Crane Creek | Headwaters to Sevenmile Road | 11 | USGS measurements (3) | 05/1905–08/1911 | Average of all measurements | 4 | |
161 | Mares Egg Spring | Headwaters to mouth | 12 | OWRD measurement (1) | 10/1954 | Four measurements averaged 2.4 ft3/s during summer of 1992 and 1994 | 4 | |
62 | Sevenmile Creek | RM 17 to Sevenmile Road | 60 | OWRD measurements (9) | 10/1908–10/1959 | Average | Unknown upstream diversions. OWRD Site 21420393 | 2 |
63 | Cherry Creek | Headwaters to West Side Road Crossing | 12 | USFS gage | 10/1992–09/1997 | Index regression to Rogue R above Prospect, Oreg. (USGS Site 14328000) | OWRD site 61420302 and site 21420397 | 2 |
64 | Fourmile Creek | Headwaters to West Side Road Crossing | 2 | USGS gage | 10/1964–09/1967 | Index regression to Deer Cr above Crane Prairie Res, near La Pine, Oreg. (USGS Site 14052000) | USGS Site 11505600, regulated at Fourmile Lake | 4 |
Subtotal for other upper Klamath Lake tributaries | 120 | |||||||
65 | Upper Klamath Lake | Upper Klamath Lake | 350 | USGS gages | 10/1964–09/1967 | Mass balance. Annual average (rounded). | Published water balanced study from Hubbard (1970). Analysis used measured inflows, outflows, lake elevations, and evaporation estimates. Agrees with other estimates (Cooper, 2004) | 3 |
Subtotal for upper Klamath Lake | 350 | |||||||
66 | Clear Lake | Drainage to Clear Lake Reservoir Dam (RM 78) | 40 | USGS gage, BOR data | 10/1904–09/1951 | Average | 10/1904–05/1909 USGS gage, 06/1909–09/1951 (Bureau of Reclamation, 1954) | 4 |
67 | Lost River | Clear Lake Reservoir (RM 78) to Malone Dam (64.5) | 2 | BOR data | 08/1987– 08/2002 | Mass balance. Only November average used due to missing data in other months. | Discharge in river and canals below Malone Dam minus Clear Lake mean monthly releases. Gains within uncertainty of estimate. | 4 |
68 | Gerber Reservoir | Drainage to Gerber Reservoir | 10 | USGS gage, BOR data | 10/1904–09/1951 | Average | Flows at Gerber reported by Bureau of Reclamation (1954) | 4 |
69 | Lost River | Malone Dam (RM 64.5) to Gift Road (RM 58) | 11 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | 4 | |
70 | Lost River | Gift Road (RM 58) to Keller Bridge (RM 50.3) | 16 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | 4 | |
71 | Lost River | Keller Bridge (RM 50.3) to east Bonanza (RM 45.1) | 9 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | Synoptic overall gains (73 ft3/s) from Keller Bridge to Harpold Dam is close to the average (82 ft3/s) of 13 measurements taken from 11/1925–12/2001 | 3 |
72 | Lost River | East Bonanza (RM 45.1) to Harpold Bridge (RM 43.9) | 61 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | Synoptic overall gains (73 ft3/s) from Keller Bridge to Harpold Dam is close to the average (82 ft3/s) of 13 measurements taken from 11/1925–12/2001 | 3 |
73 | Lost River | Harpold Bridge (RM 43.9) to Harpold Dam (RM 40.8) | 3 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | Synoptic overall gains (73 ft3/s) from Keller Bridge to Harpold Dam is close to the average (82 ft3/s) of 13 measurements taken from 11/1925–12/2001 | 3 |
74 | Lost River | Harpold Dam (RM 40.8) to Kirsh Bridge (RM 34.8) | 10 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | 4 | |
75 | Lost River | Kirsh Bridge (RM 34.8) to Stevenson Park (RM 30.5) | 29 | OWRD synoptic measurement | 12/1997 | Synoptic measurement | 4 | |
76 | Miller Creek | Gerber Reservoir to mouth | 4 | OWRD measurement and BOR reservoir outflow data | 12/1997 | Mass balance from measurement and reservoir release data. | 4 | |
Subtotal for Lost River | 200 | |||||||
77 | Williow Creek | Measured at bridge crossing about 3 mi from headwater springs | 5.8 | USGS measurements (4) | 12/1954–3/1955 | Average | Wood, 1960 | 4 |
78 | Cottonwood Creek | Combined measurements of headwaters springs | 10 | USGS measurements (4) | 12/1954–5/1955 | Average | Wood, 1960 | 4 |
79 | Sheepy Creek | Measured at road crossing (48N/1E-35) about 1 mi north of headwater springs | 16 | USGS measurements (5) | 11/1954–5/1955 | Average | Wood, 1960 | 4 |
80 | Hot Creek | Measured at outlet of empty reservoir 47N/1E-3 about 0.5 mi from headwater springs | 3.4 | CDWR and USGS measurements | 12/1954 (stream) 6/1954 (wells) | Flow of spring-fed stream with probable contributions from flowing artesian wells subtracted | Wood, 1960 | 4 |
Subtotal for lower Klamath Lake | 35 | |||||||
81 | Klamath River | Keno Dam (RM 230.5) to below JC Boyle powerplant (RM 218.1) | 190 | USGS gage and Pacific Corp. Reservoir data | 10/1967–10/1987, 10/1989–09/2001 | Average (rounded). Mass balance. Derived from monthly mean discharge and reservoir content data. Excludes gains from Spencer Cr. | USGS gages: (11509500) Klamath River at Keno, Oreg. and (11510700) Klamath River below JC Boyle powerplant near Keno, Oreg. Minus gains estimate from Spencer Creek. | 2 |
82 | Spencer Creek | Headwaters to mouth | 27 | USGS gage | 10/1925–09/1931 | Index regression to Rogue River above Prospect, Oreg. (USGS Site 14328000) | USGS Site 11510000. Restarted in 2002 by OWRD | 3 |
83 | Fall Creek | Headwaters to mouth | 36 | USGS gage | 07/1928–09/1959 | Index regression to McCloud R near McCloud CA (USGS Site 11367500) | USGS Site 11512000 | 2 |
84 | Jenny Creek | Headwaters to mouth | 9 | USGS gage | 10/1922–09/1928 | Index regression to South Fork Little Butte Cr near Lake Creek, Oreg. (USGS Site 14341500) | USGS Site 11516500 | 3 |
85 | Klamath River | Below JC Boyle powerplant (RM 218.1) to Iron Gate Dam | 92 | USGS gage and Pacific Corp. Reservoir data | 10/1967–09/2000 | Average. Mass balance from monthly mean discharge, reservoir content data, and tributary flow listed in table. Excludes gains from tributaries listed in table. | Klamath River below JC Boyle powerplant near Keno, Oreg. (USGS Site 11510700) to Klamath River below Iron Gate Dam, Calif. (USGS Site 11516530). Minus gain estimates from tributaries. | 3 |
Subtotal for Klamath River below Keno | 350 |