Scientific Investigations Report 2008-5070
U.S. GEOLOGICAL SURVEY
Scientific Investigations Report 2008-5070
Table 3. Bureau of Reclamation Hydromet gaging stations used to estimate flow in the Yakima River mainstem from Roza Diversion Dam to Prosser Dam, Washington.
[Locations of gaging stations are shown in figure 10. NA, not applicable]
| Station name |
Station identification |
River kilometer |
|---|---|---|
| Yakima River below Roza Dam | RBDW | 213.18 |
| Roza Canal at Headworks | RZCW | NA |
| Selah Moxee Canal | SEXW | 206.99 |
| Naches River near Yakima | NRYW | 194.46 |
| Union Gap Canal | UNGW | 192.24 |
| Moxee Drain at Birchfield Road | BICW | 189.63 |
| Ahtanum Creek at Union Gap | AUGW | 179.20 |
| Roza Canal at 11.0 mile | ROZW | NA |
| New Reservation Canal | RSCW | 178.62 |
| Sunnyside Canal | SNCW | 173.71 |
| Yakima River near Parker | PARW | 173.37 |
| Sulpher Creek at Holiday Road, near Sunnyside | SUCW | 99.36 |
| Yakima River at Euclid Road Bridge, near Grandview | YGVW | 89.77 |
| Chandler–Prosser Power Canal | CHCW | 76.62 |
| Yakima River near Prosser | YRPW | 74.64 |