Appendixes
Data files that contain suspended-sediment measurements and loads (appendixes A–D) and flow-duration/sediment rating curve calculations (appendix E) are presented in five Microsoft© Excel spreadsheets. The appendixes can be accessed and downloaded at URL http://pubs.usgs.gov/sir/2009/5221/.
Appendix A. Suspended-Sediment Measurements at U.S. Geological Survey Gaging Station Elwha River Above Lake Mills (12044900), Elwha River Basin, Clallam County, Washington, Water Years 1995–98
Appendix B Estimates of Monthly and Annual Suspended-Sediment Load at U.S. Geological Survey Gaging Station Elwha River Above Lake Mills (12044900), Elwha River Basin, Clallam County, Washington, Water Years 2006–07
Appendix C. Bedload Measurements at U.S. Geological Survey Gaging Station Elwha River Above Lake Mills (12044900), Elwha River Basin, Clallam County, Washington, Water Years 1995–98
Appendix D. Flow-Duration/Sediment Rating Curve Calculations for Determining Estimated Total Annual Sediment Load into Lake Mills, Elwha River Basin, Clallam County, Washington
Appendix E. Daily, Monthly, and Annual Suspended-Sediment Load at U.S. Geological Survey Gaging Station Elwha River at McDonald Bridge (12045500), Elwha River Basin, Clallam County, Washington, Water Years 2006–07
|
Part or all of this report is presented in Portable Document Format (PDF); the latest version of Adobe Reader or similar software is required to view it. Download the latest version of Adobe Reader, free of charge. |