Table 8. Survey data for mined sites on the South Umpqua River, Oregon, 2001–2009.
[Survey data provided by the gravel operators. At most sites, surveys from 2001–04 provide raw cut and fill volumes, but for 2005–09, only the net volumes were provided. Survey volumes were converted to mass using a bulk density of 2. Abbreviation: FPKM, flood-plain kilometer; –, no data; na, not applicable]
Operator |
Survey date |
Bar process recorded in survey |
Raw survey data |
|
Net deposition, extraction,
and erosion volumes |
Notes |
Surveyed raw
cut mass
(metric tons) |
Surveyed raw
fill mass
(metric tons) |
Deposition mass
(metric tons) |
Extracted (mined) mass
(metric tons) |
Erosion mass (metric tons) |
Umpqua Sand and Gravel Bar, FPKM 171.4 |
Umpqua Sand
and Gravel1 |
09-00 |
– |
– |
na |
|
na |
na |
|
|
|
06-01 |
Erosion |
-11,510 |
550 |
-10,960 |
|
|
|
|
08-01 |
Extraction |
-10,390 |
1,120 |
na |
-9,260 |
na |
|
|
08-02 |
Deposition |
-1,220 |
3,220 |
2,000 |
na |
na |
|
|
08-03 |
Deposition |
-1,580 |
42290 |
2,710 |
na |
na |
|
|
10-03 |
Extraction |
-1,550 |
940 |
na |
-610 |
|
|
|
07-04 |
Deposition |
– |
– |
1,790 |
na |
|
Bulk of deposit near one
transect (L3) |
|
09-04 |
Extraction |
– |
– |
na |
-1,910 |
na |
Most of material mined
between two
transects (L3 and L4) |
|
05-06 |
Deposition |
– |
– |
15,920 |
na |
na |
Bar migrated upstream;
decreased length,
increased width and
elevation (~0.3–0.6 m) |
|
07-07 |
Deposition |
– |
– |
1,650 |
na |
na |
Minor increase in
bar elevation (~0.3 m) |
|
06-08 |
Deposition |
– |
– |
3,110 |
na |
na |
Minor increase in
bar elevation (~0.3 m),
more defined side
channel developed |
|
10-09 |
Erosion |
– |
– |
na |
na |
-1,580 |
Most erosion on
downstream one-third
to one-half bar |
Shady Bar, FPKM 186.2 |
Knife River Corporation2 |
07-01 |
Deposition |
-1,400 |
9,590 |
8,180 |
na |
na |
Fill quantities almost
entirely from additional
gravel in stock piles |
|
07-02 |
Erosion |
-3,750 |
1,260 |
na |
na |
-2,490 |
|
|
07-03 |
Deposition |
-2,030 |
7,370 |
5,340 |
na |
na |
|
|
08-04 |
Deposition |
– |
– |
10,420 |
na |
na |
Mining across and
along bar |
|
07-05 |
Erosion |
– |
– |
na |
na |
-2,770 |
|
|
05-06 |
Deposition |
– |
– |
30,600 |
na |
na |
Uniform increase in
bar elevation (~0.3–0.6 m)
measured at each transect |
|
06-07 |
Deposition |
– |
– |
9,750 |
na |
na |
Indiscernible difference for
transects between surveys |
|
06-2008 |
Deposition |
– |
– |
2,810 |
na |
na |
Indiscernible difference for
transects between surveys |
Little Valley Bar, FPKM 189.7 |
Knife River Corporation2 |
09-02 |
– |
– |
na |
na |
na |
|
|
|
07-03 |
Deposition |
-2,310 |
7,600 |
5,290 |
na |
na |
|
|
07-04 |
Deposition |
-470 |
3,600 |
3,130 |
na |
na |
|
|
07-05 |
Deposition |
– |
– |
2,610 |
na |
na |
|
|
05-06 |
Deposition |
– |
– |
9,200 |
na |
na |
Increase in bar elevation
(~1 to 4 feet) |
|
07-07 |
Deposition |
– |
– |
3,110 |
na |
na |
Increased elevation upstream,
decreased elevation downstream |
|
06-08 |
Deposition |
– |
– |
1,680 |
na |
na |
|
|
09-09 |
Deposition |
– |
– |
1,250 |
na |
na |
|
Weigle Bar, FPKM 211 |
Knife River Corporation2 |
07-02 |
– |
– |
na |
na |
na |
|
|
|
07-03 |
Deposition |
-740 |
2,300 |
1,570 |
na |
na |
|
|
07-04 |
Erosion |
-1,140 |
790 |
na |
na |
-350 |
|
|
09-04 |
Extraction |
– |
– |
na |
-13,160 |
na |
Increase in bar elevation
(~2 to 5 feet) |
|
07-05 |
Deposition |
– |
– |
2,450 |
na |
na |
|
|
05-06 |
Deposition |
– |
– |
8,370 |
na |
na |
|
|
06-07 |
Erosion |
– |
– |
na |
na |
-1,870 |
|
|
06-08 |
Deposition |
– |
– |
170 |
na |
na |
|
|
09-09 |
Deposition |
– |
– |
480 |
na |
na |
|
Gazley East Bar, FPKM 232 |
Knife River Corporation2 |
07-02 |
– |
– |
na |
na |
na |
|
|
|
07-03 |
Deposition |
-2,420 |
3,950 |
1,530 |
na |
na |
|
|
08-04 |
Deposition |
– |
– |
4,500 |
na |
na |
|
|
07-05 |
Erosion |
– |
– |
na |
na |
-9,240 |
|
|
06-06 |
Deposition |
– |
– |
20,810 |
na |
na |
Increase in bar elevation
(~0.5–2 feet) |
|
06-07 |
Erosion |
– |
– |
na |
na |
-1,930 |
|
|
06-08 |
Deposition |
– |
– |
1,300 |
na |
na |
|
|
09-09 |
Deposition |
– |
– |
1,590 |
na |
na |
|
Days Creek Bar, FPKM 249.9 |
Knife River Corporation2 |
07-02 |
– |
– |
na |
na |
na |
|
|
|
07-03 |
Erosion |
-4,880 |
3,230 |
-1,660 |
|
|
|
|
07-04 |
Deposition |
-4,810 |
5,940 |
1,140 |
na |
na |
|
|
09-04 |
Extraction |
– |
– |
na |
-21,500 |
na |
Most of material
mined between two
transects
(7+48.33 and 8+86) |
|
08-05 |
Deposition |
– |
– |
80 |
na |
na |
|
|
05-06 |
Deposition |
– |
– |
9,210 |
na |
na |
Previously extraction zones
filled with deposition material |
|
06-07 |
Erosion |
– |
– |
na |
na |
-2,800 |
|
|
06-08 |
Deposition |
– |
– |
6,630 |
na |
na |
Water flow in
extraction zone |
|
09-09 |
Deposition |
– |
– |
1,940 |
na |
na |
|
Gazley West Bar, FPKM 231 |
Knife River Corporation |
09-09 |
Deposition |
– |
– |
na |
na |
na |
|
|
First posted September 29, 2011
Part or all of this report is presented in Portable Document Format (PDF); the latest version of Adobe Reader or similar software is required to view it. Download the latest version of Adobe Reader, free of charge. |