Coal Resource Recoverability
A Methodology
U.S. Bureau of Mines Circular 9368
BIBLIOGRAPHY
1. Abbott, D. M. Common Misuses of 'Ore Reserves' in Press Releases and Other Public Disclosures. Pres. at 93rd Natl. Western Min. Conf., Denver, CO, Feb. 8, 1990, 7 pp.
2. Arnold, B. J., C. D. Harrison, and R. A. Lohnes. Coal Handleability- Addressing the Concerns of the Electric Utility Industry. Soc. Min. Eng. preprint 89-5, 1989, 10 pp.
3. Association of American Railroads. The 1989 Coal Book. Off. lnf. and Pub. Affairs, 1989, 65 pp.
4. Averitt, P. Stripping-Coal Resources of the United States. U.S. Geol. Surv. Bull. 1252-C, 1968, 20 pp.
5. Coal Resources of the United States, Jan. 1, 1974. U.S. Geol. Surv. Bull. 1412, 1975, 131 pp.
6. Coal Resources of the United States, Jan. 1, 1967. U.S. Geol. Surv. Bull. 1275, 1969, 3 pp.
7. Coal Reserves of the United States-A Progress Report, Jan. 1, 1960. U.S. Geol. Surv. Bull. 1136, 1961, 3 pp.
8. Babcock, C. O., T. Morgan, and K Haramy. Review of Pillar Design Equations Including the Effects of Constraint. Paper at lst Annu. Conf. on Ground Control in Min., V*rV Univ., Morgantown, WV, July 1981, 12 pp.
9. Berry, C. W. Think Large Mines Have All the Economic Advantages? Think Again. Coal, Oct. 1988, pp. 64A-64D.
10. Bertoldi, M. J. Preliminary Economics of Mining a Thick Coal Seam by Dragline, Shovel-Truck, and Scraper Mining Systems. BuMines IC 8761, 1977, 27 pp.
11. Brant, P- A., D. R. Chesnut, W. T. Frankie, and E. R. PortigCoal Resources of the Big Sandy District, Kentucky. KY Geol. Surv. Energy Resource Series, 1983, 47 pp.
12. Brauner, G. Subsidence Due to Underground Mining. BuMines IC 8571 and IC 8572, 1973, 56 pp. and 53 pp.
13. Brezovec, D. Holton Automates Its Longwall With a Shearer Initiation System. Coal Age, July 1987, pp. 60-62.
14. Operators Try New Roof Support. Coal Age, Mar. 1987, pp. 30-33.
15. Burger, J. P, Island Creek Favors Wash-to-Zero. Coal Age, Sept. 1980, pp. 70-74.
16. Carr, F., E. Martin, and B. H. Gardner. How to Eliminate Roof and Floor Failures with Yield Pillars. Coal Mining, pt. 1, Dec. 1994, pp. 62-70; pt. 2, Jan. 1985, pp. 44-51.
17. Carter, M. D., and N. Y- Gardner. An Assessment of Coal Resources Available for Development: Central Appalachian Region. U.S. Geol. Surv. OFR 89-362, 1989, 53 pp.
18. Cavallaro, J. A. Sulfur Reduction Potential of the Coals of the United States. BuMines RI 8118 (rev. from RI 7633), 1976, 323 pp.
19. Coal. Bailey Mine Forges New Concepts in Size, Productivity. Oct. 1998, p. 46.
20. Coal Age. Continuous Haulage Methods Designed to Keep Continuous Mining Continuous. July 1976, pp. 119-136.
21. The 1987 Coal Age Longwall Census. Aug. 1987, pp. 43-53.
22. Planbook of Coal Mining. McGraw-Hill, 137 pp.
23. Coal Mining. Westmoreland's Bullitt Mine Refines Longwall Development. Dec. 1986, pp. 25-27.
24. Cobb, J. C., J. C. Currens, and H. G. Enoch. Compliance Coal Resources in Kentucky. KY Geol. Surv. Inf. Circ. 9, 1982, 52 pp.
25. Cobb, J. C., J. C. Currens, and K W. Teoh. Predicting the Impact of Changes in the EPA Compliance Standard for Sulfur Emissions on the Coal Resources of Eastern Kentucky. KY Geol. Surv. Inf. Circ. 29, 1989, 9 pp.
26. Cohen, S. L. Coalfield Salary Survey. Coal, Aug. 1989, pp. 38-42.
27. Combs, T. H. Longwall Productivity Continues Upward Trend, Jumps 30 Percent in Year's Time. Coal, Aug. 1988, pp. 40-41.
28. Combs, T. II. Longwall Productivity Had Its Ups and Downs in '96, but Overall Results Show a 13 Percent Boost. Coal Age, Aug. 1987, pp. , 56-57.
29. Curth, E. A., and J. M. Listak. Longwall Roof Support Technology in the Eighties. BuMines IC 9066, 1996, 43 pp.
30. DuCarme, J. P., W. D. Mayercheck, and R. B. Farrar. Conceptual Approach to Mine Mountaintop Tbin-Seam Coal Resources From Highwalls. Paper at 1990 Min. and Recl. Conf. and Exhib., Charleston, VN, Apr. 24-26, 1990, 17 pp.
31. Duda, J. R., and E. L. Hemingway. Basic Estimated Capital Investment and Operating Costs for Underground Bituminous Coal Mines Developed for Longwall Mining- Mines With Annual Production of 1.3 and2.6MillionTonsbyLongwaliMiningFroma48-InchCoalbed. BuMines IC 8720, 1976, 23 pp.
32. Estimated Capital Investment and Operating Costs for Underground Bituminous Coal Mines Developed for Longwall MiningMines With Annual Production of 1.5 and 3 Million Tons by Longwall Mining From an 84-Inch Coalbed. BuMines IC 8715, 1976, 25 pp.
33. Eggleston, J. R., and M. D. Carter. A New Approach to Determining How Much Coal is Available for Mining. U.S. Geol. Surv. Yearbook, 1987, pp. 57-61.
34. Eggleston, J. I-, M. D. Carter, and J. C. Cobb. Coal Resources Available for Development-A Methodology and Pilot Study. U.S. Geol. Surv. Circ. 1055, 1990, 15 pp.
35. Electric Power Research Institute. Removing Sulfur From Coal Gas at High Temperatures. Dec. 1988, pp. 5-7.
36. Energy Information Administration. Annual Outlook for U.S.
Coal 1989. DOE/EIA-0333(89), June 1989, 51 pp.
37. . Estimation of U.S. Coal Reserves by Coal Type: Heat and Sulfur Content. DOE/EIA-0529, Oct. 1989, 57 pp.
38. _. Quarterly Coal Report, October-December 1989. DOE/ EIA-0121(89/4th Qtr.), May 1990, 147 pp.
39. . Cost and Quality of Fuels for Electric Utility Plants 1988. DOE/EIA-019(88), Aug. 1989, 232 pp.
40. Evans, R. J., and J. R. Bitler. Coal Surface Mining Reclamation Costs. BuMines IC 8695, 1975, 50 pp.
41. Eyer, D. D. Underground Mines Continue Evolution, Forego Revolutionary Changes. Coal, Aug. 1989, pp. 52-54.
42. Fcjes, A. J. Surface Subsidence Over Longwall Panels in the Western United States: Monitoring Program and Final Results at the Price River Coal Co. No. 3 Mine, Utah. BuMines IC 9099,1986,21 pp.
43. Fejes, A. J., R. C. Dyni, J. A. Magers, and L. B. Swatek. Subsidence lnformation for Underground Mines-Literature Assessment and Annotated Bibliography. BuMines IC 9007, 1985, 86 pp.
44. Gomez, M., and Y- Hazen. Evaluating Sulfur and Ash Distribution in Coal Seams by Statistical Response Surface Regression Analysis. BuMines RI 7377, May 1970, 120 pp.
45. Hinkle, D. E., G. T. Lineberry, and K F. Unrug. Estimating Secondary Mining Potential of Inactive and Abandoned Appalachian Highwalls. Soc. Min. Eng. prcprint 89-130, 1989, 14 pp. 46. ICF Resources Incorporated. Economic Analysis of Title V (Acid Rain Provisions) of the Administration's Proposed Clean Air Act Amendments (H. F- 3030/S.1490). Sept. 1989, 93 pp. 47. Jackson, D. Coastal's Switch to Longwall Turns on Higher Productivity. Coal Mining, Dec. 1986, pp. 29-32.
48. Jankowski, F- A., and J. S. Kelley. Longwall Shearers Reverse Drum Rotation and Show Production and Health Benefits. Coal, Sept. 1988, pp. 72-76.
49. Katell, S., and E. L. Hemingway. Basic Estimated Capital Investment and Operating Costs for Underground Bituminous Coal Mines: Mines With Annual Production of 1.06 to 4.99 Million Tons From a 72Inch Coalbed. BuMines IC 8632, 1974, 41 pp.
50. Katell, S., and E. L. Hemmingway. Basic Estimated Capital Investment and Operating Costs for Coal Strip Mines. BuMines IC 8661, 1974, 31 pp.
51. . Basic Estimated Capital Investment and Operating Costs for Underground Bituminous Coal Mines: Mines With Annual Production of 1.03 to 3.09 Million Tons From a 48-Inch Coalbed. BuMines IC 8641, 1974, 31 pp.
52. Katell, S., E. L. Hemingway, and L. H. Berkshire. Basic Estimated Capital Investment and Operating Costs for Underground Bituminous Coal Mines: Mines With Annual Production of 1.03 to 3.09 Million Tons From a 48-Inch Coalbed. BuMines IC 8689 (rev. from IC 8641), 1975, 32 pp.
53. Kaufman, W. W., and J. C. Ault. Design of Surface Mine Haulage Roads-A Manual. BuMines IC 8758, 1977, 68 pp.
54. Kennedy, F. Coal Mining Research at Consolidation Coal Company. Soc. Min. Eng. preprint 89-92, 1989, 9 pp.
55. Kentucky Geological Survey. Coal-Tbickness Data for the Big Sandy District, Kentucky. KY Geol. Surv. OFR, Series XI, 1986, 212 pp.
56. Khair, A. W., and R. D. Begley. Assessment of Modeling Techniques for Prediction of Subsidence Over Longwall Areas. Soc. Min. Eng. preprint 89-14, 1989, 7 pp.
57. Koontz, C. P. CAD Cuts Coal Costs: Using Autocad at Beaver Creek Coal Company. Cadence, Aug. 1989, 7 pp.
58. Kripakov, N. P., L. A. Beckett, D. A. Donato, and J. S. L)urrComputer-Assisted Mine Design Procedures for Longwall Mining. BuMines RI 9172, 1990, 38 pp.
59. Landsberg, H. H. Coal Revisited. CO Sch. Mines Working Paper 88-12, Oct. 1988, 19 pp.
60. Larwood, G. M., and D. C. Benson. Coal Transportation Practices and Equipment Requirements to 1985. BuMines IC 8706, 1976, 90 pp.
61. Lowrie, R. L. Recovery Percentage of Bituminous Coal Deposits in the United States (In Two Parts)-Part 1: Underground Mines. BuMines RI 7109, 1968, 19 pp.
62. Lu, P. H. Integrity Factor Approach to Mine Pillar Stability Evaluation and Design. BuMines Tech. News, No. 321, Jan. 1989, 1 p.
63. . Ground Control Study of a Mechanized Longwall Coal Operation in West Virginia. BuMines RI 8929, 1985, 34 pp.
64. Lucas, H. H., and J. K McWilliams. A Superwall for Super Production. Coal, Oct. 1988, pp. 54-57.
65. Maleki, H. N. Detecting Stability Problems by Monitoring Rate of Roof Movement. Coal, Dec. 1988, pp. 34-37.
66. Marino, G. G., and R- A. Bauer. Behavior of Abandoned Room and Pillar Mines in Illinois. Soc. Min. Eng. prcprint 89-3, 1989, 8 pp.
67. Mark, C Longwall Pillar Design-Some Recent Developments. Soc. Min. Eng. preprint 89-103, 1989, 9 pp.
68. Matson, T. K, and D. H. White, Jr. Ile Reset* Base of Coal for Underground Mining in the Western United States. BuMines IC 8678, 1975, 238 pp.
69. Merritt, P., A. Sanda, and M. Sprouls. Consol Structures Its Management for Long-Term Leadership. Coa ' 1, Oct. 1988, pp. 36-51.
70. Moebs, N. N., and R. M. Stateham. Geologic Factors in Coal Mine Roof Stability-A Progress Report. BuMines IC 8976,1984,27 pp. 71. . 'ne Diagnosis and Reduction of Mine Roof Failure. Coal Mining, pt. 1, Feb. 1985, pp. 52-55; pt. 2, Mar. 1985, pp. 4248.
72. Molinda, G. M., and D. Y- Ingram. Effects of Structural Faults on Ground Control in Selected Coal Mines in Southwestern Virginia. BuMines RI 9289, 1989, 25 pp.
73. NationalAcademyofSciences/NationalAcademyofEngineering. Underground Disposal of Coal Mine Wastes. 1975, 172 pp.
74. Organiscak, J. A., S. L. Page, and R. A. Jankowski. 4,000 TonPer-Shift Longwalls: How Do They Do It? Coal, Dec. 1988, pp. 31-33. 75. Page, S. J., J. C. Volkwein, and F. N. Yisscil. Some Continuous Sections Can Cut Morenan 1,000 Tons Per Unit Shift. Coal Age, Jan. 1987, pp. 51-55.
76. Peng, S. S. Longwall Automation Grows. Coal Mining, May 1987, pp. 48-51.
77. Persse, F. H. Strip-Mining Techniques to Minimize Environmental Damage in the Upper Missouri River Basin States. BuMines IC 8685, 1975, 53 pp.
78. Pritchard, C. J. Advancing Tailgate Shortwall Ventilation in Underground Trona Mining. Soc.Min.Eng.preprint89-54,1989,6pp.
79. Puente, C., and J. T. Atkins. Simulation of Rainfall-Runoff Response in Mined and Unmined Watersheds in Coal Areas of West Virginia. U.S. Geol. Surv. Water-Supply Paper 2298, 1989, 48 pp.
80. Reese, P- G., B. B. Dash, and P. A. Hamilton. Coal Recovery From Underground Bituminous Coal Mines in the United States, by Mining Method. BuMines IC 8785, 1978, 30 pp.
81. Reisinger, R. W. U.S. Coal Exports: Can Iley Compete in the World Market? Minerals Today, Mar. 1990, pp. 16-22.
82. Sanda, A. P. Westmoreland Scores Big Savings With New Dump Train. Coal, Sept. 1988, pp. 54-56.
83. Sanda, A. P., and Zaburunov, S. A. Is It a Short Longwall, or a Long Shortwall? Coal, Dec. 1989, pp. 3941.
84. . Longwalling and Mettiki: A Case of Investing in the Future or Closing Out the Books. Coal, Nov. 1988, pp. 77-81.
85. Dos Santos, J. A. High Angle Conveyors-Hac For Surface Minin@1988." Soc. Min. Eng. preprint 89-86, 1989, 7 pp.
86. Secor, E. S., G. M. Larwood, A. B. Gupta, and A. S. Lees. Coal Recovery From Bituminous Coal Surface Mines in the Eastern United States-A Survey. BuMines IC 8738, 1977, 14 pp.
87. Secretary of the Interior. 'ne Mineral Position of the United States-1989. Annual Report of the Secretary of the Interior Under the Mining and Minerals Policy Act of 1970, Sept. 1990, 66 pp.
88. Seegmiller, B. L., and J. A. Reeves, Jr. Performance of Entry Trusses, Continuous Entry Trusses and Roktrusses at the Mid-Continent Dutch Creek Mines, Redstone, Colorado. Soc. Min. Eng. prcprint 89138, 1989, 7 pp.
89. Seiner, G. I., and R. B. Taylor. GSMAP and GSDRAW System, Version 6.0. U.S. Geol. Surv. OFR 89-373A, Documentation and Tutorial, and OFR 89-373B, Executable Program Disks, 1989.
90. Spendlove, M. J. Bureau of Mines Research on Resource Recovezy. Reclamation, Utilization, Disposal, and Stabilization. BuMines IC 8750, 1977, 104 pp.
91. Sprouls, M. W. Coal Mining and Coal Burning Turn Up in '87. Coal Mining, Jan. 1987, pp. 22-26.
92. Longwall Census '88. Coal, Feb. 1988, pp. 65-77,
93. Longwall Census '87. Coal, Feb. 1987, pp. 26-41.
94. Rond Lake Banks On Longwalls. Coal, Apr. 1989, pp. 88-90.
95. Longwall Census '89. Coal, Feb. 1989, pp. 3143.
96. Stefanko, R. Coal Mining Technologyneory and Practice. Society of Mining Engineers, 1983, 410 pp.
97. Tanious, N. S. Investigation of a Large-Scale Coal Pillar Failure. Soc. Min. Eng. preprint 89-152, 1989, 5 pp.
98. Thompson, S. D., G. T. Lineberry, and A. J. Basu. Comparison of Two Simulators for Belt System Design. Soc. Min. Eng. preprint 8997, 1989, 8 pp.
99. Thomson, R. D., and H. F. York. The Reserve Base of U.S. Coals by Sulfur Content. BuMines IC 8680, 1975, 27 pp.
100. Toth, G. W. Coal Mining Cost Model, Volume 1: Underground Coal Mining Cost Model. NUS Corporation, EA-1273, Research Project 1009-2, prep. for Electric Power Research Institute, Jan. 1981, 303 pp.
101. Coal Mining Cost Model, Volume 2: Users' Guide for the Underground Coal Mining Cost Model. NUS Corporation, EA-1273, Research Project 1009-2, prep. for Electric Power Research Institute, Jan. 1981, 112 pp.
102. Coal Mining Cost Model, Volume 3: Surface Coal Mining Cost Model. NUS Corporation, EA-1273, Research Project 1009-i, prep. for Electric Power Research Institute, Jan. 1981, 246 pp.
103. Toth, G. W. Coal Mining Cost Model, Volume 4: Users' Guide for the Surface Coal Mining Cost Model. NUS Corporation, EA-1273, Research Project 1009-2, prep. for Electric Power Research Institute, Jan. 1981, 117 pp.
104. Trent, V. Seven Field Books. U.S. Geological Survey, May 1961, 92 pp.
105. Treworgy, C. G. Techniques for Estimating the Coal Reserve Base of a Region Using a Geographic Information System: A Case Study from Illinois. IL State Geol. Surv. unpublished paper, 1989, 16 pp.
106. U.S. Bureau of Mines. Mine Subsidence Control. IC 9042,1985, 56 pp.
107. Cost Analyses of Model Mines for Strip Mining of Coal in the United States. IC 8535, 1972, 116 pp.
108. Strippable Reserves of Bituminous Coal and Lignite in the United States. IC 8531, 1971, 148 pp.
109. The Reserve Base of Bituminous Coal and Anthracite for Underground Mining in the Eastern United States. IC 8655, 1974, 428 pp.
110. U.S. Geological Survey, and U.S. Bureau of Mines. Coal Resource Classification System of the U.S. Bureau of Mines and U.S. Geological Survey. U.S. Geol. Surv. Bull. 1450-B, 1976, 7 pp.
111. U.S. Department of Commerce, and U.S. Department of Interior. A Cost Comparison of Selected U.S. and Colombian Coal Mines. Jan. 1986, 62 pp.
112. U.S. Department of Energy. Documentation of the Resource Allocation and Mine Costing (RAMC) Model. DOE/EIA-MO21, May 1987, 174 pp.
113. U.S. Geological Survey. Available Coal Resources Computer Applications. Br. Coal Geol., Nov. 1988, 17 pp.
114. . Briefing Package for USBM on USGS Research on the Availability of Coal Resources for Development. Nov. 1988, 28 pp.
115. University of Kansas, Kansas Institute for Mineral Resource Research. Shallow-Cover Coal: New Mining Methods and the Environment. Univ. KS, 1974, 87 pp.
116. Walker, J. S., and L C. LaScola. Foundation Response to Subsidence-Induced Ground Movements: A Case Study. BuMines RI 9224, 1989, 12 pp.
117. Wilkinson, J. F. Plant Rebuilt for Longwalling. Coal Age, July 1987, pp. 42-44.
118. Wood, G. H., Jr., T. M. Kehn, M. D. Carter, and W. C Culbertson. Coal Resource Classification System of the U.S. Geological Survey. U.S. Geol. Surv. Circ. 891, 1983, 65 pp.
119. Wood, G. H., Jr., and W. V. Bour, 111. Coal Map of North America. U.S. Geol. Surv., 1988, 2 sheets and explanatory pamphlet.
[ Contents | Eastern Energy Home ]
Created by the EERT WWW Staff.
[an error occurred while processing this directive]