Coal Resource Recoverability
A MethodologyU.S. Bureau of Mines Circular 9368
Table 5.-Surface production rates by mining method
Mining method | Production per seam method | |
12 - 36 in | >36 in | |
Contour stripping | 5,200 BCY1/shift | 6,500 BCY1/shift. |
Area stripping | 8,500 BCY1/shift | 8,500 BCY1/shift |
Auger mining | 175 tons/shift | 250 tons/shift. |
1BCY Bank Cubic Yards
[ Contents | Eastern Energy Home ]
Created by the EERT WWW Staff.
[an error occurred while processing this directive]