Coal Resource Recoverability
A Methodology

U.S. Bureau of Mines Circular 9368


Table 5.-Surface production rates by mining method

Mining method Production per seam method
12 - 36 in >36 in
Contour stripping 5,200 BCY1/shift 6,500 BCY1/shift.
Area stripping 8,500 BCY1/shift 8,500 BCY1/shift
Auger mining 175 tons/shift 250 tons/shift.
PREVIOUS NEXT

1BCY Bank Cubic Yards