#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 21246 UIRB UIRB 05533000 A 7/13/2000 14:45 REACH R us side of bridge at German Church Rd. "Tegt, Sarah, Stewart, Jana S., Fuller, Janice A." Excellent Stream falling after runoff event- slightly turbid 30.5 Wading Rod Not Modified 180 18 -191 -11 10.7 m ds of Auto Bridge entrance to Swimming pool 11m us of us side of bridge at German Church Rd. Stream falling after runoff event- slightly turbid 8/1/2000 16:55 6/25/2003 17:06