#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 21236 UIRB UIRB 05539335 A 7/11/2000 9:30 REACH R ds side of bridge at Mills Rd. Stewart, Jana S., Fuller, Janice A., Tegt, Sarah Excellent Runoff from 7/10/00 storm Lightly affected 200 20 5.8 205.8 Right 5.8 meters DS of Mills Road Bridge First elm tree metal foot bridge is 16m DS from transect 11 Runoff from 7/10/00 storm 8/1/2000 16:42 6/25/2003 17:06