#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 22212 UIRB UIRB 05545955 A 7/18/2000 12:30 REACH R US side of bridge at Bassett Rd (Cty F) Stewart, Jana S., Tegt, Sarah, Wolf, Julie A. Excellent Slightly Turbid, Many frogs, recent sewage treatment plant overflow in early June, residential along lb 3.03 Not Modified 150 15 -161.8 -11.8 Right 161.8 meters US from Bassett Road Bridge T-1 begins at the us side of a concrete block Slightly Turbid, Many frogs, recent sewage treatment plant overflow in early June, residential along lb 8/3/2000 9:42 6/25/2003 17:06