Station list     Available data
BIG MUDDY RIVER BASIN


05595820       CASEY FORK AT MT. VERNON, IL

 

LOCATION.-- Lat 38°17'12", long 88°52'19" (NAD of 1927), in NE1/4NE1/4 sec.9, T.3 S., R.3 E., Jefferson County, Hydrologic Unit 07140106, on left bank on upstream side of bridge on State Highway 142, 0.2 mi downstream from Sevenmile Creek, about 2 mi southeast of Mt. Vernon, and at mile 18.8.

 

DRAINAGE AREA.-- 76.9 mi2.

 

PERIOD OF RECORD.--

SURFACE-WATER DISCHARGE AND STAGE

 

DISCHARGE: October 1985 to current year.

 

STAGE: Water years 1995 to current year. October 1985 to September 1994 (8 AM gage heights). Gage-height record for April 1965 to May 1971 available in files of U.S. Army Corps of Engineers.

 

GAGE.-- Water-stage recorder, U.S. Army Corps of Engineers satellite telemeter, and crest-stage gage. Datum of gage is 420.00 ft above NGVD of 1929 (levels by U.S. Army Corps of Engineers).

 

REMARKS.-- Sewage-treatment plant upstream at Mt. Vernon.

 

EXTREMES FOR PERIOD OF RECORD.--

SURFACE-WATER DISCHARGE AND STAGE: Maximum discharge, 16,100 ft3/s, May 17, 1990, gage height 17.03 ft; minimum daily discharge, 0.15 ft3/s, Sept 29, 1989.

 

EXTREMES OUTSIDE PERIOD OF RECORD.--

SURFACE-WATER DISCHARGE AND STAGE: Flood of Apr. 4, 1968, reached a stage of 14.60 ft, from records of U.S. Army Corps of Engineers.




Table of Contents

Introduction

Station Descriptions

Surface-Water Data

Ground-Water Data

Meteorological Data

Biological Data