#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 122462 UIRB UIRB 05532500 A 8/12/2003 9:15 REACH R "Harris,Mitchell,Hogan,Jennifer,Scudder,Barb,FazioD" Good "reach between two bridges, pipes, paths" 3.26 316 Gage Lightly affected 300 30 Left Left rebar halfway up slope nr sprawling hawthorn at 41 49 05.58 87 48 29.39 rebar at top of bank at 41 48 57.20 87 48 33.58 "reach between two bridges, pipes, paths" 10/7/2003 15:03 12/23/2003 10:11