#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 4725 UIRB UIRB 05526000 A 7/22/1999 8:30 REACH R Light post in clearing on LB Fitzpatrick, Faith, Adolphson DL,Tegt S,Woessner K Good Large river - should probably use longer reach length Not Modified 300 30 -300 0 Left Left Yellow-capped rebar in patch of poison ivy Light post in clearing on LB GPS: 41 03 06.58 0.000243 0.00404 Surveying Level Large river - should probably use longer reach length 2/8/2000 11:28 6/25/2003 17:06