#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 21231 UIRB UIRB 05551340 A 7/10/2000 14:15 REACH R DS end of first low-head dam- US of highway 31 Tegt, Sarah, Stewart, Jana S., Fuller, Janice A. Good Runoff from storm--- 2 points were estimated because too deep, bank full measurments questionable, Transect 11 has an island, which created a problem with the canopy angles Left channel left 110 right 60 Right channel left 70 right 90 Lightly affected 300 30 -404 -104 us end of island at hiking trail # 2--- cliff across from end of island on RB Runoff from storm--- 2 points were estimated because too deep, bank full measurments questionable, Transect 11 has an island, which created a problem with the canopy angles Left channel left 110 right 60 Right channel left 70 right 90 8/1/2000 16:35 6/25/2003 17:06