Sections of tracklines where navigation was recorded but no seismic data were logged are not included. There is no line L47f1 (acquisition system froze 2 minutes into this line, no good data were recorded), there is also no line L132 and L133. Time gaps occurred during this field activity where no surveying was done due to bad weather, rough seas and stops in port for crew changes. Planned surveying was paused and no main survey line data were collected during these times:
JD143 15:20 - JD146 20:06 (no data were collected on JD144 or JD145)
JD149 15:40 - JD151 18:59 (no data were collected on JD150)
JD153 00:01 - JD153 14:32
JD155 18:16 - JD156 02:06
JD158 06:12 - JD160 19:15 (no data were collected on JD159)