Dual-track CCS stakeholder engagement: Lessons learned from FutureGen in Illinois
Links
- More information: Publisher Index Page (via DOI)
- Download citation as: RIS | Dublin Core
Abstract
FutureGen, as originally planned, was to be the world’s first coal-fueled, near-zero emissions power plant with fully integrated, 90% carbon capture and storage (CCS). From conception through siting and design, it enjoyed strong support from multiple stakeholder groups, which benefited the overall project. Understanding the stakeholder engagement process for this project provides valuable insights into the design of stakeholder programs for future CCS projects. FutureGen is one of few projects worldwide that used open competition for siting both the power plant and storage reservoir. Most site proposals were coordinated by State governments. It was unique in this and other respects relative to the site selection method used on other DOE-supported projects. At the time of site selection, FutureGen was the largest proposed facility designed to combine an integrated gasification combined cycle (IGCC) coal-fueled power plant with a CCS system. Stakeholder engagement by states and the industry consortium responsible for siting, designing, building, and operating the facility took place simultaneously and on parallel tracks. On one track were states spearheading state-wide site assessments to identify candidate sites that they wanted to propose for consideration. On the other track was a public-private partnership between an industry consortium of thirteen coal companies and electric utilities that comprised the FutureGen Alliance (Alliance) and the U.S. Department of Energy (DOE). The partnership was based on a cooperative agreement signed by both parties, which assigned the lead for siting to the Alliance. This paper describes the stakeholder engagement strategies used on both of these tracks and provides examples from the engagement process using the Illinois semi-finalist sites.
Publication type | Article |
---|---|
Publication Subtype | Journal Article |
Title | Dual-track CCS stakeholder engagement: Lessons learned from FutureGen in Illinois |
Series title | Energy Procedia |
DOI | 10.1016/j.egypro.2011.02.634 |
Volume | 4 |
Year Published | 2011 |
Language | English |
Publisher | elsevier |
Description | 8 p. |
First page | 6218 |
Last page | 6225 |
Google Analytic Metrics | Metrics page |