Landsat-4/5 Band 6 relative radiometry
Links
- More information: Publisher Index Page (via DOI)
- Download citation as: RIS | Dublin Core
Abstract
Relative radiometric responses for the thematic mapper (TM) band 6 data from Landsat-4 and Landsat-5 were analyzed, and an algorithm has been developed that significantly reduces the striping in Band 6 images due to detector mismatch. The TM internal calibration system as originally designed includes a DC restore circuit, which acts as a feedback system designed to keep detector bias at a constant value. There is a strong indication that the DC restore circuitry implemented in Band 6 does not function as it had been designed to. It operates as designed only during a portion of the calibration interval and not at all during acquisition of scene data. This renders the data acquired during the calibration shutter interval period virtually useless for correction of the individual responses of the four detectors in Band 6. It was observed and statistically quantified that the relative response of each of the detectors to the band average is stable over the dynamic range and throughout the lifetime of the instrument. This allows an alternate approach to relative radiometric correction of TM Band 6 images
Publication type | Article |
---|---|
Publication Subtype | Journal Article |
Title | Landsat-4/5 Band 6 relative radiometry |
Series title | IEEE Transactions on Geoscience and Remote Sensing |
DOI | 10.1109/36.981362 |
Volume | 40 |
Issue | 1 |
Year Published | 2002 |
Language | English |
Publisher | IEEE |
Contributing office(s) | Earth Resources Observation and Science (EROS) Center |
Description | 5 p. |
First page | 206 |
Last page | 210 |
Online Only (Y/N) | N |
Additional Online Files (Y/N) | N |
Google Analytic Metrics | Metrics page |