Stream measurement work: Appendix 4 in Nineteenth biennial report of the State Engineer to the governor of Utah: 1933-1934
Links
- More information: Full Text of Biennial Report
- Download citation as: RIS | Dublin Core
Abstract
Stream measurement work under the usual co-operative agreement between the U.S. Geological Survey and the State Engineer continued during the biennium for the purpose of determining the water resources of the State. This work in Utah is part of the general plan for a systematic determination of the water resources of the United States begun by the Geological Survey in 1888. Records of stream flow on a few rivers in the West were taken as part of special studies on irrigation, in which connection gaging stations were established on the Bear, Weber, Provo, and Sevier rivers. The Bear River station at Collinston has been maintained continuously since that date.
Publication type | Report |
---|---|
Publication Subtype | State or Local Government Series |
Title | Stream measurement work: Appendix 4 in Nineteenth biennial report of the State Engineer to the governor of Utah: 1933-1934 |
Series title | Utah State Engineer Biennial Report |
Series number | 19 |
Chapter | Appendix 4 |
Year Published | 1934 |
Language | English |
Contributing office(s) | Utah Water Science Center |
Description | 4 |
Larger Work Type | Report |
Larger Work Subtype | State or Local Government Series |
Larger Work Title | Nineteenth biennial report of the State Engineer to the governor of Utah: 1933-1934 |
First page | 57 |
Last page | 60 |
Country | United States |
State | Utah |
Google Analytic Metrics | Metrics page |