Stochastic programming with a joint chance constraint model for reservoir refill operation considering flood risk
Links
- More information: Publisher Index Page (via DOI)
- Download citation as: RIS | Dublin Core
Abstract
Suggested Citation
Xu, B., Boyce, S.E., Zhang, Y., Liu, Q., Guo, L., Zhong, P., 2017, Stochastic programming with a joint chance constraint model for reservoir refill operation considering flood risk: Journal of Water Resources Planning and Management, v. 143, no. 1, 04016067; 11 p., https://doi.org/10.1061/(ASCE)WR.1943-5452.0000715.
| Publication type | Article |
|---|---|
| Publication Subtype | Journal Article |
| Title | Stochastic programming with a joint chance constraint model for reservoir refill operation considering flood risk |
| Series title | Journal of Water Resources Planning and Management |
| DOI | 10.1061/(ASCE)WR.1943-5452.0000715 |
| Volume | 143 |
| Issue | 1 |
| Year Published | 2017 |
| Language | English |
| Publisher | ASCE |
| Contributing office(s) | California Water Science Center |
| Description | 04016067; 11 p. |
| Country | China |
| Other Geospatial | Xiluodu Cascade Reservoir |