This report presents data on streamflow, suspended-sediment concentration, geomorphic measurements of pools, and particle-size distribution of surficial bed material, collected along a 5-mile reach of the Gibbon River in Yellowstone National Park. The study was done in cooperation with the National Park Service. The Park Service was concerned about the potential effects that road reconstruction would have on water quality.
A streamflow-gaging station and two automatic pumping samplers were installed in September 2000 to collect suspended-sediment samples. The gage and samplers were operated seasonally from March through September 2001. The geomorphic survey of pools and sampling of bed material occurred during October 2000.