Geologic and seismic investigations for relocation of Route 20 (Springfield bypass) grade separation and approach cuts at Burnett Road, stations 225 to 236+10.34; 411+40 to 416, Chicopee, Massachusetts
Links
- The Publications Warehouse does not have links to digital versions of this publication at this time
- Download citation as: RIS | Dublin Core
Abstract
| Publication type | Report |
|---|---|
| Publication Subtype | USGS Numbered Series |
| Title | Geologic and seismic investigations for relocation of Route 20 (Springfield bypass) grade separation and approach cuts at Burnett Road, stations 225 to 236+10.34; 411+40 to 416, Chicopee, Massachusetts |
| Series title | Open-File Report |
| Series number | 53-188 |
| DOI | 10.3133/ofr53188 |
| Year Published | 1953 |
| Language | ENGLISH |
| Description | 3 p., 3 plates |