Preconstruction and postconstruction ground-water levels, Lock and Dam 1, Red River Valley, Louisiana

Open-File Report 79-918
By:

Links

Abstract

Proposed construction of a series of locks and dams in the Red River in Louisiana will cause a permanent increase in average river stage. The potentiometric surface of the shallow alluvial aquifer and the water table in the fine-grained material confining the aquifer will be affected. The purpose of this study, using digital-modeling techniques, was to predict the average postconstruction potentiometric surface (steady state) and the water table (nonsteady state) so that potential effects of the water-level changes could be evaluated.

Plans for Lock and Dam 1 at mile 44 (kilometer 71) above the mouth of the Red River call for a pool elevation of 40 feet (12.2 meters) and will cause an average increase in river stage of 9 feet (2.7 meters). As a result, ground-water levels will be raised 1 foot (0.3 meter) or more within 4 miles (6.4 kilometers) of the river. The potentiometric surface may be near land surface in low-lying areas, and above land surface along the course of drainage features near the dam. The magnitude of ground-water-level fluctuations near the river will be reduced. 

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Preconstruction and postconstruction ground-water levels, Lock and Dam 1, Red River Valley, Louisiana
Series title Open-File Report
Series number 79-918
DOI 10.3133/ofr79918
Year Published 1979
Language English
Publisher U.S. Geological Survey
Description iv, 17 p.
Country United States
State Louisiana
Other Geospatial Red River Valley
Google Analytic Metrics Metrics page
Additional publication details