An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the
United States.
Secure .gov websites use HTTPS
A lock (
) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Preconstruction and postconstruction ground-water levels, Lock and Dam 4, Red River Valley, Louisiana
Open-File Report
79-921
Prepared in cooperation with the U.S. Army Corps of Engineers and the U.S. Soil Conservation Service
Proposed construction of a series of locks and dams in the Red River in Louisiana will cause a permanent increase in average river stage. The potentiometric surface of the shallow alluvial aquifer and the water table in the fine-grained material confining the aquifer will be affected. The purpose of this study, using digital-modeling techniques, was to predict the average postconstruction potentiometric surface (steady state) and the water table (nonsteady state) so that potential effects of the water-level changes could be evaluated. Plans for lock and dam 4 at realined mile 154 (kilometer 250) above the mouth of the Red River call for a pool elevation of 115 feet (35 meters) and will cause an average increase in river stage ranging from 24 to 4.5 feet (7 to 1.4 meters). As a result, ground-water levels will be raised 1 foot (0.3 meter) or more between the Red River and Bayou Pierre from the dam to Coushatta , and below Campti, east of the river. The potentiometric surface may be at or near land surface in low areas between the Red River and Bayou Pierre, and above land surface locally upstream from the dam. The magnitude of ground-water-level fluctuations near the river will be reduced to less than half the present range.
Suggested Citation
Ludwig, A.H., Reed, J., 1979, Preconstruction and postconstruction ground-water levels, Lock and Dam 4, Red River Valley, Louisiana: U.S. Geological Survey Open-File Report 79-921, Report: v, 22 p.; 6 Plates: 39.49 x 39.10 inches and smaller, https://doi.org/10.3133/ofr79921.
ISSN: 2331-1258 (online)
Study Area
Publication type
Report
Publication Subtype
USGS Numbered Series
Title
Preconstruction and postconstruction ground-water levels, Lock and Dam 4, Red River Valley, Louisiana
Series title
Open-File Report
Series number
79-921
DOI
10.3133/ofr79921
Year Published
1979
Language
English
Publisher
U.S. Geological Survey
Publisher location
Barton Rouge, LA
Description
Report: v, 22 p.; 6 Plates: 39.49 x 39.10 inches and smaller