North American Bat Monitoring Program (NABat) Mobile Acoustic Transect Surveys Standard Operating Procedure 3—Conducting Mobile Transect Surveys

Techniques and Methods 2-C3
By: , and 

Links

Abstract

This standard operating procedure (SOP) provides instructions and considerations for conducting mobile acoustic surveys along road transects to collect bat acoustic data following the North American Bat Monitoring Program (NABat) protocol and sample design. This report discusses measures for ensuring the safety of surveyors and efficiency of mobile transect surveys. This guidance is intended to aid surveyors in equipment setup and operation, including how to mount and orient equipment. Finally, this document provides guidance on driving the route, performing end of survey procedures, and steps for data management.

Suggested Citation

Martin, J., Hall, M., Ferrall, E., Li, H., Rae, J., Straw, B., and Reichert, B., 2022, North American Bat Monitoring Program (NABat) mobile acoustic transect surveys standard operating procedure 3—Conducting mobile transect surveys: U.S. Geological Survey Techniques and Methods 2–C3, 6 p., https://doi.org/10.3133/tm2C3.

ISSN: 2328-7055 (online)

Table of Contents

  • Acknowledgments
  • Abstract
  • Introduction
  • Before Heading into the Field
  • Conducting the Mobile Transect Survey
  • Data Management and Submission
  • Important Considerations
  • Frequently Asked Questions
  • References Cited
Publication type Report
Publication Subtype USGS Numbered Series
Title North American Bat Monitoring Program (NABat) mobile acoustic transect surveys standard operating procedure 3—Conducting mobile transect surveys
Series title Techniques and Methods
Series number 2-C3
DOI 10.3133/tm2C3
Year Published 2022
Language English
Publisher U.S. Geological Survey
Publisher location Reston, VA
Contributing office(s) Fort Collins Science Center
Description vi, 6 p.
Online Only (Y/N) Y
Google Analytic Metrics Metrics page
Additional publication details