Scientific Investigations Report 2012–5004
Figure 9. Replacement rate of water calculated over 1 day in (A) Goose Bay and (B) Tulana, Upper Klamath Lake, Oregon, based on numerical tracer experiments. The calculations were made at 5-day intervals between April 27 and October 9, 2008. The flow from the Williamson River was set to 25 cubic meters per second and the lake elevation was varied between 4,140.5 and 4,142.5 feet. |
First posted March 29, 2012
For additional information contact: Part or all of this report is presented in Portable Document Format (PDF); the latest version of Adobe Reader or similar software is required to view it. Download the latest version of Adobe Reader, free of charge. |