Scientific Investigations Report 2007–5156
In cooperation with the City of Madison, Wisconsin, and the Wisconsin Department
of Natural Resources
By William R. Selbig and Roger T. Bannerman
This report is available for download as a PDF (1,740 KB).

Abstract
Introduction
Purpose and Scope
Description of Study Area
Methods of Data Collection
Street-Dirt Collection and Processing
Basin-Outlet Flow Measurement and Precipitation and Runoff-Sample Collection
Flow Measurement
Precipitation
Runoff-Sample Collection
Changes to Sample-Processing and Analytical Methods
Particle-Size Distribution
Changes in Street-Sweeper Technology in the Air-Sweeper Basin
Characterization of Street Dirt
Calibration Phase
Treatment Phase
Weekly Street-Sweeper Performance
Changes in Street-Dirt Distribution on a Street Surface
Changes in Basin Street Dirt as a Result of Street Sweeping
Effect of Rainfall on Street Dirt
Effects of Street Sweeping on Stormwater-Runoff Quality
Previous Studies
Examination of Stormwater-Quality Concentrations and Loads
Potential Sources of Variability
Comparison of Particle-Size Distribution in Stormwater-Quality Samples
Summary and Conclusions
Acknowledgments
References
Appendix 1. Detailed Street-Dirt and Water-Quality
Data
Appendix 2. Quality Assurance and Quality Control
Figure 1. Map showing location of study basins and water-quality monitoring stations, Madison, Wis.
Figure 2. Photograph showing demonstration of equipment used to collect street dirt samples.
Figure 3. Photograph showing a vacuumed strip leaves a visible trail indicating the degree of available street dirt.
Figure 4. Graph showing verification of regression equations used to predict water levels in the control basin during periods when the water level sensor was faulty.
Figure 5. Graph showing typical subsample coverage of hydrograph.
Figure 6. Boxplot showing average weekly street-dirt yields in the control and test basins during the calibration phase.
Figure 7. Boxplot showing the influence of spring (April–May) street-dirt yield on total basin averages.
Figure 8. Graph showing average basin street-dirt yield categorized by season in the control and test basins during the 2002 calibration phase.
Figure 9. Graph showing paired-basin relation between the control and test basins during the calibration phase.
Figure 10. Graph showing average changes in weekly street-dirt yield as a function of particle size for three street-sweeping treatments in Madison, Wis.
Figure 11. Diagram showing location of sub-sampling strips to determine the distribution of street-dirt yield across a street.
Figure 12. Graph showing street sweeper removal capabilities as a function of initial street-dirt yield.
Figure 13. Boxplot showing average weekly street-dirt yield during the treatment phase.
Figure 14a. Graph showing response of average weekly street-dirt yield to street sweeping in the air-sweeper basin.
Figure 14b. Graph showing response of average weekly street-dirt yield to street sweeping in the high-frequency broom basin.
Figure 14c. Graph showing response of average weekly street-dirt yield to street sweeping in the low-frequency broom basin.
Figure 15. Boxplot showing comparison of street-dirt yields in the control basin, 2002–2004.
Figure 16. Boxplot showing control and test basin water-quality loads for selected constituents during calibration and treatment phases.
Figure 17. Graph showing estimated number of samples required to result in statistically relevant conclusions in a paired-basin study.
Figure 18. Photograph showing examples of lawn-maintenance practices in two study basins.
Figure 19. Photograph showing residue from sand applied to a street surface to provide traction for vehicles.
Figure 20. Photograph showing accumulation of sediment in the junction of a manhole with the storm-sewer conveyance system.
Figure 21. Photograph showing contribution of sediment to a street from a residential lawn.
Figure 22. Photograph showing water-quality sample intake located at a fixed point along the storm-sewer wall.
Table 1. Physical characteristics of the control and test basins selected for the Madison, Wis., street-sweeping study.
Table 2. Characteristics of streets sampled in the control and test basins.
Table 3. Constituents analyzed in samples of runoff at the air sweeper, high-frequency broom, and control study basins.
Table 4. Process of including the mass of sediment wet-sieved from a whole-stormwater sample back into the distribution of particle sizes in a subsample.
Table 5. Schedule for street-dirt sample collection.
Table 6. Comparison of street-dirt yields, measured during the no-sweeping phase of this study in Madison, Wis., to those for other residential streets in the United States.
Table 7. Summary statistics of average basin street-dirt change for the regenerative-air, vacuum-assist, and high-frequency mechanical broom sweepers during the treatment phase.
Table 8. Distribution of street-dirt yield before and after street sweeping on a single street in the air-sweeper basin, April to June 2005.
Table 9. Distribution of particles measured from street surfaces in the control and test basins during the calibration and treatment phases.
Table 10. Summary statistics of average basin street-dirt yields for the control and test basins during calibration and treatment phases.
Table 11a. Summary of water-quality concentrations in storm water from the control and air-sweeper basins during calibration and treatment phases.
Table 11b. Summary of water-quality concentrations in storm-water from the control and high-frequency broom basins during calibration and treatment phases.
Table 12a. Summary of loads in the control and air-sweeper basins during calibration and treatment phases.
Table 12b. Summary of loads in the control and high-frequency broom basins during calibration and treatment phases.
Table 13. Probabilities that there is no difference in storm-runoff loads between calibration and treatment phases for the regenerative-air, vacuum-assist, and high-frequency broom sweepers.
Table 14. Coefficient of variation for constituent loads measured in stormwater from the control and test basins during the calibration and treatment phases.
Table 15. Average percent distribution, by mass, of particle sizes for water-quality samples collected in the control and test basins during calibration and treatment phases.
Appendix 1-1. Control
basin street-dirt yield, in pounds per curb-mile, separated by particle size.
Appendix 1-2. Air-sweeper
basin street-dirt yield, in pounds per curb-mile, separated by particle size.
Appendix
1-3. High-frequency
broom basin street-dirt yield, in pounds per curb-mile, separated by particle
size.
Appendix 1-4. Low-frequency
broom basin street-dirt yield, in pounds per curb-mile, separated by particle
size.
Appendix 1-5. Runoff-event
characteristics for the control basin.
Appendix 1-6. Runoff-event
characteristics for the air-sweeper basin.
Appendix 1-7. Runoff-event
characteristics for the high-frequency broom basin.
Appendix 1-8a. Constituent
event mean concentrations measured at the control and air-sweeper basin outlets
during the calibration phase.
Appendix 1-8b. Constituent
event mean concentrations measured at the control and high-frequency broom basin
outlets during the calibration phase.
Appendix 1-8c. Constituent
event mean concentrations measured at the control and air-sweeper basin outlets
during the treatment phase.
Appendix 1-8d. Constituent
event man concentrations measured at the control and high-frequency broom basin
outlets during the treatment phase.
Appendix 1-9a. Constituent
event mean loads measured at the control and air-sweeper basin outlets during
the calibration phase.
Appendix 1-9b. Constituent
event mean loads measured at the control and high-frequency broom basin outlets
during the calibration phase.
Appendix 1-9c. Constituent
event mean loads measured at the control and air-sweeper basin outlets during
the treatment phase.
Appendix 1-9d. Constituent
event mean loads measured at the control and high-frequency broom basin outlets
during the treatment phase.
Appendix
2-1. Results of blank-sample analyses.
Appendix 2-2. Results of
replicate-sample analyses.
Multiply |
By |
To obtain |
Length |
||
| inch (in.) | millimeter (mm) | |
| foot (ft) | meter (m) | |
| mile (mi) | kilometer (km) | |
| millimeter (mm) | inch (in.) | |
Area |
||
| acre | square meter (m2) | |
| acre | hectare (ha) | |
Volume |
||
| gallon (gal) | liter (L) | |
| gallon (gal) | cubic meter (m3) | |
| cubic foot (ft3) | cubic meter (m3) | |
| liter (L) | gallon (gal) | |
Flow rate |
||
| foot per second (ft/s) | meter per second (m/s) | |
| cubic foot per second (ft3/s) | cubic meter per second (m3/s) | |
| gallon per minute (gal/min) | liter per second (L/s) | |
| gallon per day (gal/d) | cubic meter per day (m3/d) | |
| pound, avoirdupoi (lb) | kilogram (kg) | |
| ton per day (ton/d) | metric ton per day | |
| pounds per curb-mile | kilograms per curb-kilometer | |
| gram (g) | ounce, avoirdupois (oz) | |
| kilogram (kg) | pound, avoirdupois (lb) | |
Temperature in degrees Celsius
(°C) may be converted to degrees Fahrenheit (°F) as follows: Concentrations of constituents in water are given either in milligrams per liter (mg/L) or micrograms per liter (μg/L). Particle sizes of sediment are given in micrometers (µm).
A micrometer is one-thousandth of a millimeter. |
||
Recent technological improvements have increased the ability of street sweepers to remove sediment and other debris from street surfaces; the effect of these technological advancements on stormwater quality is largely unknown. The U.S. Geological Survey, in cooperation with the City of Madison and the Wisconsin Department of Natural Resources, evaluated three street-sweeper technologies from 2002 through 2006. Regenerative-air, vacuum-assist, and mechanical-broom street sweepers were operated on a frequency of once per week (high frequency) in separate residential basins in Madison, Wis., to measure each sweeper’s ability to not only reduce street-dirt yield but also improve the quality of stormwater runoff. A second mechanical-broom sweeper operating on a frequency of once per month (low frequency) was also evaluated to measure reductions in street-dirt yield only. A paired-basin study design was used to compare street-dirt and stormwater-quality samples during a calibration (no sweeping) and a treatment period (weekly sweeping). The basis of this paired-basin approach is that the relation between paired street-dirt and stormwater-quality loads for the control and tests basins is constant until a major change is made at one of the basins. At that time, a new relation will develop. Changes in either street-dirt and/or stormwater quality as a result of street sweeping could then be quantified by use of statistical tests.
Street-dirt samples collected weekly during the calibration period and twice per week during the treatment period, once before and once after sweeping, were dried and separated into seven particle-size fractions ranging from less than 63 micrometers to greater than 2 millimeters. Street-dirt yield evaluation was based on a computed mass per unit length of pounds per curb-mile. An analysis of covariance was used to measure the significance of the effect of street sweeping at the end of the treatment period and to quantify any reduction in street-dirt yield. Both the regenerative-air and vacuum-assist sweepers produced reductions in street-dirt yield at the 5-percent significance level. Street-dirt yield was reduced by an average of 76, 63, and 20 percent in the regenerative-air, vacuum-assist, and high-frequency broom basins, respectively. The low-frequency broom basin showed no significant reductions in street-dirt yield. Sand-size particles (greater than 63 micrometers) recorded the greatest overall reduction. Street-sweeper pickup efficiency was determined by computing the difference between weekly street-dirt yields before and after sweeping cleaning. The regenerative-air and vacuum-assist sweepers had similar pickup efficiencies of 25 and 30 percent, respectively. The mechanical broom sweeper operating at high frequency was considerably less efficient, removing an average of 5 percent of street-dirt yield.
The effects of street sweeping on stormwater quality were evaluated by use of statistical tests to compare event mean concentrations and loads computed for individual storms at the control and test basins. Loads were computed by multiplying the event mean concentrations by storm-runoff volumes. Only ammonia-nitrogen for the test basin with the vacuum-assist sweeper showed significant load increases over the control basin, at the 10-percent significance level, of 63 percent. Difficulty in detecting significant changes in constituent stormwater-quality loads could be due, in part, to the large amount of variability in the data. Coefficients of variation for the majority of constituent loads were greater than 1, indicating substantial variability. The ability to detect changes in constituent stormwater-quality loads was likely hampered by an inadequate number of samples in the data set. However, sediment transport in the storm-sewer pipe, sediment washing onto the street from other source areas, winter sand application, and sampling challenges were additional sources of variability within each study basin and may have increased the difficulty in evaluating street sweeping as a stormwater-quality-management tool.
The Wisconsin Department of Natural Resources (WDNR) has promulgated a series of stormwater performance standards that attempt to mitigate both water-quantity and water-quality impacts associated with stormwater runoff (Wisconsin Administrative Code NR 151, 2002). Performance standards for established urban areas will require qualifying cities to reduce the annual total suspended solids (TSS) load by 40 percent. The City of Madison, along with more than 200 other Wisconsin cities, will be required to meet these performance standards by the year 2013 as part fulfillment of their U.S. Environmental Protection Agency National Pollution Discharge Elimination System (NPDES) Phase II permits.
Previous studies have indicated that runoff from street surfaces is a major contributor of constituents to receiving waters (Sartor and Boyd, 1972; Pitt and Amy, 1973; Amy and others, 1974; Waschbusch and others, 1999). Particulate and dissolved solids and organic and inorganic compounds resulting from vehicular wear and emissions, pavement degradation, maintenance, atmospheric deposition, and littering are commonly associated with urban drainage from paved areas (Sansalone and others, 1998). Although several structural best management practices (BMPs) have been designed to mitigate these constituents, most are only effective once constituents have already become entrained in urban runoff. Selection of one or more BMPs to address constituents in urban runoff may be limited by available space, existing infrastructure, and maintenance (Breault and others, 2005). One nonstructural way to control the quality of roadway or parking lot runoff is to use street sweeping as a means to remove constituents before they become entrained in runoff. Instead of facing the potentially high cost of installing and maintaining structural stormwater-treatment practices, street sweeping offers the promise of simply modifying an existing program to achieve stormwater-quality goals.
Like many other cities around the Nation, the City of Madison has limited open space available to construct new structural BMPs. The possibility of retrofitting existing areas remains an option for environmental managers, but costs may be prohibitive. The city already owns and operates nine street sweepers (A. Schumacher, City of Madison, written commun., 2007). Eight of the sweepers use a mechanical broom as the principal mechanism to clean a street. This technology has been around for decades and is used primarily for spring cleanup, trash removal, and fall leaf pickup. In addition to mechanical-broom sweepers, the city also owns and operates one street sweeper using vacuum-assist technology. The improved technology incorporated into these street sweepers has not been adequately field tested, especially when considering their effect on stormwater quality. In order to understand how best to protect the many lakes and rivers that surround the City of Madison, city officials were interested in evaluating the effectiveness of street sweeping as a stormwater-quality-management option.
The focus of the study described in this report was to characterize the effectiveness of street sweeping at reducing street-dirt yield, as well as evaluating street sweeping’s effect on stormwater quality. Few studies have quantified the capabilities of street sweepers with improved technologies, such as regenerative-air or vacuum-assisted brooms, to remove street dirt. Even fewer studies have examined the benefits of street sweeping on stormwater quality. To augment previously collected data sets that characterize various street-sweeper technologies and to understand the stormwater-quality benefits from these sweepers, the U.S. Geological Survey, in cooperation with the City of Madison and the Wisconsin Department of Natural Resources, collected street-dirt from four residential basins in Madison. Stormwater-quality samples also were collected in three of the four basins. Samples were used to calculate loads during a calibration (no sweeping) and treatment (sweeping) phase. Relations were established between the loads for the control and test basins. These relations were tested for changes between the calibration and treatment periods. This study supports an ongoing effort to identify existing and new methods to reduce nopoint-source pollution from urban areas.
This report describes the methods used in and the results from the City of Madison street-sweeping study. An analysis of potential street dirt and stormwater-quality-constituent load reductions are presented to provide an estimate of stormwater-quality benefits from street sweeping. A paired-basin design (Clausen and Spooner, 1993) was used to help evaluate the effectiveness of various street-sweeping programs at reducing street-dirt yields and improving stormwater quality in urban runoff.
Four basins were chosen to represent various sweeping scenarios. Specifically, this study examined the street-dirt-removal efficiencies and subsequent changes in stormwater-quality loads from a regenerative-air, vacuum-assisted, and mechanical-broom street sweeper operated on a frequency of once per week (high frequency). An additional mechanical-broom sweeper operating on a frequency of approximately once per month (low frequency) was also evaluated for street-dirt removal only. The study period began in 2002 and ended in 2006.
Concentrations of 26 constituents including particulate and dissolved solids, inorganic compounds, and trace metals in stormwater-runoff samples were used to compute storm loads for each constituent at the basin outfall. Reduction in constituent loads by use of different sweeper technologies was estimated based on differences between calibration and treatment phases. In addition to stormwater quality and quantity, street-dirt yields were characterized before and after street sweepers entered each basin.
Madison, Wis. has a population of 208,054 (based on the 2000 census). The climate is typical of interior North America, with a large annual temperature range and frequent short-period temperature changes. Nearly 60 percent of the 32.95 inches of average annual precipitation falls in the months of May through September (National Climatic Data Center, 2003). The study area is near the southwest limits of the city in a predominantly single-family residential setting (fig. 1). Study basins were within a 1-mile radius of each other to help reduce variation in storm rainfall. Selection of each basin was based on similarity in physical conditions, including basin area, land use, street condition, age of streets since last resurfacing, overhead tree canopy, topography, and lot size. Table 1 details some of the physical characteristics of each basin.
Figure 1. Location of study basins and water-quality monitoring stations, Madison, Wis.
Table 1. Physical characteristics of the control and test basins selected for the Madison, Wis., street-sweeping study.
[%, percent; --, land use not present in basin; values in parentheses represent percentages of total basin area]
(weekly) |
(monthly) |
|||
| Drainage area (acres) | ||||
| Land use (acres): |
|
|||
| Driveway | ||||
| Lawns | ||||
| Roofs | ||||
| Sidewalks | ||||
| Streets | ||||
| Parking lot | ||||
| Other | ||||
| Soil type | ||||
| Average age of homes (years) | ||||
| Years since streets last resurfaced | ||||
| Street composition/condition | ||||
| Street texture | ||||
| Average slope | ||||
| Average lot size (acres) | ||||
A naming convention based on the type of street-sweeper technology used was adopted to simplify discussion of each basin involved in the study. The control basin was appropriately named “control.” The test basin, where a regenerative air sweeper was used (later replaced by a vacuum-assisted sweeper) is referred to as the “air-sweeper” basin. The two basins that were swept with a mechanical broom sweeper are distinguished by the frequency at which the basin was swept, “low-frequency broom” representing a frequency of approximately once per month, and “high-frequency broom” representing a frequency of once per week.
The test basins selected for this study have similar drainage areas. The drainage area for the control basin is considerably larger, nearly double that of the test basins (table 1). Land use was categorized into seven major source areas: driveways, rooftops, lawns, streets, sidewalks, parking lot, and other. Lawns and grassy areas make up the majority of each basin, ranging from 65 to 69 percent. Streets make up approximately the same area for each basin, ranging from 8 percent in the low-frequency broom basin to 13 percent in the air-sweeper basin. Both the high-frequency broom basin and the control basin include small areas that do not fit into one of the major source-area categories. A city park occupies 4 percent of the high-frequency broom basin. This area was not included in the “lawn” category because the physical processes associated with a public park may be different from those of a typical residential lawn. Similarly, the control basin includes a small community swimming pool that makes up 1 percent of basin area. Drainage of stormwater in each basin is collected into a network of storm-sewer pipes that eventually flow into Dunn’s Marsh, approximately 1.0 mile southeast of the study area. Street widths within each basin typically measured 33 feet from curb to curb. Onstreet parking was minimal and considered negligible with respect to street-sweeper performance. Therefore, parking restrictions were not enforced during sweeper operation. There were no catch basins in the storm-drainage network for either the control or test basins.
The control and test basins, with the exception of the low-frequency broom basin, were equipped with monitoring stations to measure stormwater runoff and collect stormwater-quality data. The locations of the monitoring stations are identified in figure 1.
This study collected, characterized, and interpreted data derived from street-dirt and stormwater-quality samples collected in the four residential basins. Street-dirt data consists of street-dirt yields reported in units of mass per unit length. Constituent concentrations and loads were determined from data collected from a storm-sewer pipe near the basin outlet. Quality assurance and quality control methods and results can be found in appendix 2.
Street-dirt particulate sampling consisted of collecting available material from street surfaces within the designated test and control basins. Three streets within each basin were selected to represent overall basin street-dirt characteristics. Individual streets that were sampled are identified in figure 1 and described in table 2. Predetermined numbers of subsamples were collected at random locations across each street width and were later combined to make up a single street-dirt sample.
Table 2. Characteristics of streets sampled in the control and test basins.
(feet) |
(feet) |
(cars per day) |
||
| Control | Barton | |||
| Flad | ||||
| Dorsett | ||||
| Air sweeper | Manor Green | |||
| Aspen | ||||
| Teal | ||||
| Low-frequency broom (monthly) |
Tolman | |||
| Crabapple | ||||
| Bartlett | ||||
| High-frequency
broom (weekly) |
Suffolk | |||
| Piping Rock | ||||
| Hempstead |
The equipment and sampling procedures were slightly modified from those described by Pitt (1979) and Bannerman and others (1983). Subsamples were collected with a single 9-gallon, stainless steel, wet/dry vacuum rated at 92 cubic feet per minute maximum air flow. The vacuum head was connected to a 25-foot black neoprene, wire-reinforced hose, which was in turn connected to a wand and 6-inch-wide aluminum nozzle. The vacuum and generator were transported by a trailer-mounted cargo carrier on a USGS field vehicle. Figure 2 shows the equipment used during street-dirt sample collection.
Figure 2. Demonstration of equipment used to collect street dirt samples.
Samples were obtained by vacuuming several narrow strips across the street width, beginning from one curb edge and moving across the street to the other curb edge (fig. 2). Initially, 10 subsamples, consisting of a single curb-to-curb vacuum pass, were collected and weighed individually at each street selected in the study to determine the variability in street-dirt yields. The variability was then used to calculate the number of subsamples necessary per street to accurately represent a composite street-dirt yield. The number of subsamples, N, was determined as follows:
|
|
where
N is the estimated number of subsamples required to estimate residential street-dirt
yield;
is
the average mass of measured subsamples;
s is the standard deviation of measured subsamples’ mass; and
r is the allowable error.
The allowable error used for this study was 0.50, or plus or minus 50 percent. Lower error terms were not feasible because of subsequent increases in sampling effort. For example, an error term of 25 percent would increase the number of subsamples at one particular street from 9 to 34, making data collection cost prohibitive. A similar conclusion was reached for street-dirt data collected as part of the Nationwide Urban Runoff Program (NURP). At an allowable error of 25 percent, the number of required subsamples approached 25 (U.S. Environmental Protection Agency, 1983). Use of an allowable error of 50 percent kept the number of subsamples at or below 10 for each street in the study. To simplify the street-dirt collection effort, approximately 10 subsamples were collected at all streets selected for this study.
Each subsample was collected to represent the material that might be removed from a street surface during a heavy rainstorm. Therefore, the locations of the subsample strips were areas along each street that were not influenced by unusual loading conditions such as debris piles. Markers were painted on the curb of each street at approximately 100-foot increments to indicate to field crews the locations of subsample strips. Even though the markers served as means to identify where to collect subsamples, they were merely visual guides and not exact locations. Therefore, each subsample was collected with appropriate discretion. This flexibility artificially reduced variability in street-dirt yields by allowing field technicians to move the location of a subsample strip in the event of an unusual loading condition, such as a leaf pile or accumulated debris.
A test was set up to examine the reproducibility of the street-dirt sample-collection procedures. Street-dirt samples were collected on consecutive days during the 2004 sample-collection year in the control basin. A paired sample t-test, used to find differences between paired data sets, evaluated whether street dirt from the first sample set was different from that in the second sample set. Results of the test revealed no difference between the first and second collections of street-dirt samples at the 95-percent confidence level. Because the street-dirt samples showed good precision, any sources of variability in street-dirt yields were not likely caused by sample-collection techniques.
Because of differences in street textures, care was taken to ensure a proper rate at which the nozzle was moved across the street. A rough, pitted street surface required a slower rate than a smooth street did. Additionally, a greater amount of particulate material on a street surface required more time for adequate sample collection. The average rate used during the course of this study was approximately 1 foot per second. However, confirmation of an adequate rate to move the nozzle came from both visual and audible observation of the street surface itself. The operator of the sample-collection wand was able not only to see the material removed from the street surface but could also hear particles moving through the vacuum hose. The operator would adjust the rate to ensure that as much of the stored dirt was removed as possible. At times, a visible trail was left behind where the nozzle had removed available street dirt (fig. 3). During the fall, leaves would often clog the vacuum nozzle; consequently, an effort was made to physically pick up by hand any leaves or other detritus that was within the 6-inch-wide swath. All material was later added to the vacuum collection bag. Ultimately, when the accumulating amount of vegetative material on the street made it impractical to collect such a large volume of leaves, street-dirt collection was suspended until the following spring.
Figure 3. A vacuumed strip leaves a visible trail indicating the degree of available street dirt.
Once all subsamples for a particular street were collected, the vacuum was shut off and disassembled. A cloth filter inside the vacuum head was first shaken vigorously inside the vacuum canister and then was carefully brushed with a soft broom to remove most of the filtered material. After the dust inside the vacuum canister settled for a few seconds, all contents were transferred into a plastic container and sealed. On days when winds were gusty, some of the dust captured by the filter became airborne and was lost. Measures were taken to minimize the loss by moving the filter into an area protected from the wind.
All street-dirt samples were taken back to the USGS Wisconsin Water Science Center’s Middleton Field Office and dried overnight in an oven at 105˚C. The samples were then weighed and separated into eight different fractions including large detritus and particles in the ranges (micrometers) of: greater than 2,000; 1,000–2,000; 500–1,000; 250–500; 125–250; 63–125; and less than 63. Results of individual street-dirt yields for each basin broken down by particle size can be found in tables 1-1 through 1-4 in appendix 1.
Stormwater runoff was measured and collected at the basin outlets in the control, air-sweeper, and high-frequency broom basins. Locations of the monitoring stations are shown in figure 1. Each monitoring station was equipped with automated stormwater-quality samplers and instruments to measure water level and velocity. Measurement, control, and storage of data were done by way of electronic dataloggers. Data were automatically retrieved twice daily with telephone modems. In both the air-sweeper and high-frequency broom basins, precipitation data were collected by use of a tipping-bucket rain gage calibrated to 0.01 inch. Descriptive statistics for sampled runoff events in the control and test basins are detailed in tables 1-5 through 1-7 in appendix 1.
Flow Measurement
Monitoring stations measured flow and collected
samples at the basin outlet from a 3.50-foot-diameter circular storm sewer at
the control and air-sweeper basin and a 38 x 60-inch elliptical storm sewer in
the high-frequency broom basin. A probe with two different sensor systems was
mounted to the bottom of each pipe. Each probe contained a pressure transducer
to measure water level and a pair of ultrasonic transducers to measure velocity.
A fifth-order polynomial was used to convert water level into cross-sectional
area for each pipe configuration. Instantaneous pipe discharge was then computed
by multiplying the cross-sectional area of the pipe by the associated mean velocity.
Storm-runoff volumes were computed by summing the 1-minute-interval instantaneous
discharge during the sampled storm. When water level at the sensor was less than
1 inch, flow calculations were not considered reliable because the sensor itself
was not fully submersed. Given the large diameter of the drainage pipe at each
monitoring station, all flows occurring at less than 1-inch depth were considered
insignificant to the overall event volume.
The area-velocity probe at the control-basin outlet frequently produced periods of unreliable water-level data during June–September, 2002 and April–September, 2003. Steps were taken to obtain the most accurate flow estimates possible for this basin. Because of the proximity of the control and air-sweeper basin and similarities in pipe diameter, storm-runoff hydrographs at each basin outlet mirrored each other quite closely when equipment at both stations was functional. A polynomial regression equation was developed for these periods over a wide range of water levels. The following equations were used to adjust questionable water-level data at the control-basin outlet given reliable water-level data from the air-sweeper basin:
(feet) |
|
| Sc = 0.00196 + 1.01Sa + 3.72Sa2 + 19.3Sa3 – 125Sa4 | |
| Sc = -0.0108 + 1.72Sa + 1.05Sa2 – 8.63Sa3 + 8.77Sa4 | |
| Sc = 0.427 – 0.381Sa + 2.02Sa2 – 1.66Sa3 + 0.738Sa4 | |
| Sc = 0.267 + 0.984Sa – 0.196Sa2 |
where
Sc is the gage height, in feet, at the control basin; and
Sa is the gage height, in feet, at the air-sweeper basin.
The regression equations were verified by applying them to periods of runoff when the control-basin water-level sensor was working properly. Figure 4 represents an event hydrograph comparing original water levels and those predicted by use of the regressions for the control basin during periods when the water levels were measured correctly.
Figure 4. Verification of regression equations used to predict water levels in the control basin during periods when the water level sensor was faulty.
Precipitation
Continuous precipitation data were collected by use of two tipping-bucket
rain gages, one each in the air-sweeper and high-frequency broom basins. Although
these rain gages were not designed to measure snowfall, there were several runoff
events during winter months where precipitation was in the form of rain instead
of snow. Precipitation data were compiled and statistical summaries were computed
for both rain-gage locations. Precipitation data measured in the air-sweeper
and the high-frequency broom basin are presented in tables 1-6 and 1-7, respectively,
in appendix 1.
Runoff-Sample Collection
Sample collection was activated by a rise in water level in the pipe during
a storm. Once the water-level threshold was exceeded, typically a depth of 0.15
ft from the pipe floor, the volume of water passing the station was measured
and accumulated at 1-minute increments until a volumetric threshold was reached.
At that point, the sampler collected a discrete water sample and the volumetric
counter was reset. The process was repeated until the water level receded below
the threshold. The Teflon-lined intake nozzle of the sampler orifice was approximately
1 inch above the pipe floor. One liter sub-samples were transferred through the
Teflon-lined sample tubing into a 10-liter glass jar refrigerated at 4 degrees
Celsius.
These flow-weighted samples were collected and composited into a single water sample, then split and processed for analysis. A Teflon-coated, stainless steel churn splitter was used to composite and split samples into smaller plastic bottles for chemical and physical analysis. Processed samples were kept in a refrigerator until picked up, usually within 48 hours after runoff cessation, by City of Madison Department of Public Health staff for determination of concentrations of the constituents listed in table 3. Because each discrete sample was composited into a single event sample, the resulting concentration represents the event mean concentration (EMC). An example of flow-weighted sampling from a storm on October 24, 2004, is shown in figure 5.
Table 3. Constituents analyzed in samples of runoff at the air sweeper, high-frequency broom, and control study basins.
[N, nitrogen; MDPH, Madison Department of Public Health; USGS–ISL, U.S. Geological Survey Iowa Sediment Laboratory; WSLH, Wisconsin State Laboratory of Hygiene; USEPA, U.S. Environmental Protection Agency (U.S. Environmental Protection Agency, 1979); SM, Standard Methods (American Public Health Association and others, 1989)]
| Dissolved cadmium | ||
| Total cadmium | ||
| Total calcium | ||
| Dissolved copper | ||
| Total copper | ||
| Dissolved lead | ||
| Total lead | ||
| Total magnesium | ||
| Total phosphorus | ||
| Dissolved zinc | ||
| Total zinc | ||
| Total alkalinity | ||
| Dissolved chloride | ||
| Conductivity | ||
| Total hardness | ||
| Ammonia N | ||
| Total Kjeldahl N | ||
| Dissolved N2+N3 | ||
| Dissolved nitrate, as N | ||
| Dissolved nitrite, as N | ||
| Orthophosphorus | ||
| pH | ||
| Total solids | ||
| Total dissolved solids | ||
| Total suspended solids | ||
| Suspended sediment | ||
| Sand-silt split | ||
| Visual accumulation tube | ||
| Sedigraph | ||
| Laser diffraction | ||
| Wet-sieve | ||
| Microfiltration | ||
Figure 5. Typical subsample coverage of hydrograph.
Previous studies have demonstrated that use of both churn splitting and aliquots can introduce significant bias and (or) poor precision into sediment and sediment-associated constituent-concentration results (Capel and Larson, 1996; Horowitz and others, 1997; Gray and others, 2000; Selbig and others, 2007). Much of the variability can be attributed to the presence of entrained sediment in urban runoff whose size can have a large mass fraction in the sand-size range (Horwatich and others, 2004). During the early stages of this study, whole-stormwater samples collected from the control and test basins were found to frequently contain suspended-sediment concentrations exceeding 1,000 milligrams per liter (appendix tables 1-8a and 1-8b), with a large percentage of sediment particles larger than 250 micrometers (table 15).
In order to reduce the bias and improve precision of stormwater constituent-concentration data, sand-size particles were physically removed from the whole-stormwater sample by wet-sieving and were analyzed as a solid sample. The remaining filtrate was analyzed separately as an aqueous sample. Typically, sediment in a whole-stormwater sample was separated into one or more of the following particle-size ranges: 125–250, 250–500, and greater than 500 micrometers using nylon sieves. The methods used to wet-sieve a whole-stormwater sample, as well as the analytical techniques used to detect the presence of trace metals on resulting sieved solids, are described by Selbig and others (2007). These new methods were adopted as part of this study in May 2004.
Concentrations of some chemical constituents may have been compromised because of physical separation of sand-size particles during the wet-sieving process. Some of the constituents, such as total Kjeldahl nitrogen, are not quantifiable from a solid-phase sediment sample. Other constituents are affected because of the method by which concentrations are determined in the analytical laboratory. For example, sediment removed from a whole-water sample by wet-sieving will no longer be available when determining constituent concentrations from the aqueous phase of the sample. Therefore, total suspended solids cannot be adequately quantified because it is based on the dry weight of sediment from a known volume of a subsample of the original. Of those constituents listed in table 3, total solids, total suspended solids, and total Kjeldahl nitrogen were not considered reliable and therefore were eliminated from statistical interpretation.
Analysis of particle sizes in stormwater-quality samples was done by one of three methods, depending on the amount of material available in the sample container. The first level of particle-size definition was a “sand/silt split,” which was used to determine the percentage of sediment, by mass, with a diameter greater than 63 micrometers (defined as sand) and less than 63 micrometers (defined as silt). If a sufficient quantity of sediment was available in the sample, a visual-accumulation (VA) tube analysis was used to further derive the percentage of sediment, by mass, with diameters less than 1,000, 500, 250, 125, and 63 micrometers (Guy, 1969). Often, the amount of material was insufficient for the VA tube analysis. For this reason, an alternative method described by Burton and Pitt (2002) was used to define the distribution of particles in a runoff sample. The new method, adopted as part of this study in July 2004, builds on the concept of wet-sieving by passing a stormwater-quality sample through a series of nylon-mesh sieves with mesh openings of 500, 250, 125, 63, and 32 micrometers. All material remaining on each sieve was dried and weighed to compute mass. Particles less than 32 micrometers remaining in the filtrate were further delimited into four additional particle sizes by means of laser diffraction. This process determined the percentage of sediment by mass with diameters less than 14, 8, 5, and 2 micrometers.
For those whole-stormwater samples that were wet-sieved during the sample-splitting process, the mass of sediment separated from the whole-stormwater sample was later included into the full particle-size distribution of the sample. The mass of sediment retained on each sieve, in milligrams, was divided by the volume of the whole-stormwater sample, in liters, to obtain a concentration of sediment per each particle-size fraction. This concentration was assumed to be the same in a subsample of the whole-stormwater sample had the particles not been removed by wet-sieving. The concentrations of the particles wet-sieved from the whole-stormwater sample were then included in the computation of particle-size distribution for the subsample submitted to the laboratory for particle-size analysis. Table 4 demonstrates the process of including the mass of sediment wet-sieved from the whole-stormwater sample back into the distribution of particle sizes in the subsample.
Table 4. Process of including the mass of sediment wet-sieved from a whole-stormwater sample back into the distribution of particle sizes in a subsample.
[µm, micrometer; mg/L, milligram per liter; %, percent; >, greater than; <, less than; --, not analyzed]
| Concentrations | sediment |
concentration of sediment (mg/L) |
|||||||||||
(mg/L) |
(mg/L) |
(mg/L) |
(mg/L) |
(mg/L) |
(%) |
(%) |
(%) |
(%) |
(%) |
(mg/L) |
(mg/L) |
||
| Aqueous subsample |
|
|
|
|
|
||||||||
| Sieved fractions |
|
|
|
|
|
|
|
||||||
| Total |
|
|
|||||||||||
a 35% = 1 – [(<1 + 107 + 38)
/ 223]
Of the 158 stormwater-quality samples analyzed for particle-size distribution, 23 samples were analyzed for sand/silt split only. Sixty of the runoff samples had sufficient sediment for the VA tube analysis. For the remaining 75 samples, a combination of wet-sieving and laser diffraction was used, resulting in a complete definition of the particle-size distribution. For all samples analyzed by either the VA tube or wet-sieving and laser-diffraction analysis, a sand/silt split was computed by subtracting the percentage of sediment, by mass, for particles less than 63 micrometers from 100. For example, if 60 percent of sediment in a runoff sample was less than 63 micrometers, then 40 percent (100 minus 60) would be greater than 63 micrometers.
Traditional mechanical-broom sweepers have been the workhorse for many municipalities around the country. However, previous studies indicate they are not able to effectively pick up fine accumulated sediments (U.S. Environmental Protection Agency, 1983; Pitt, 1985; Sutherland and Jelen, 1997). One of the goals of this study was to evaluate some of the advancements in street-sweeper technology that have been made over the past several years. One such technology, regenerative-air sweeping, was initially evaluated in the air-sweeper basin from April 2003 to May 2004. Regenerative-air sweepers use a mechanical broom that passes debris and sediment near the center of the vehicle chassis, where air is blown onto the pavement and immediately vacuumed back in so as to entrain and filter out accumulated sediments (Sutherland and Jelen, 1997).
The regenerative-air sweeper was replaced with a different sweeper technology starting May 26, 2004. The new vacuum-assisted sweeper was considered by industry representatives to be more effective at removing street dirt than a regenerative-air sweeper. In addition to a wire-bristled broom, the vacuum-assisted sweeper had a powerful vacuum to capture debris and sediment quickly. The vacuum was placed along the vehicle chassis such that it was able to partially overlap the area of curb swept by the broom. The new vacuum-assisted sweeper remained in the air-sweeper basin for the remainder of the study. Where appropriate, street-sweeper performance on street-dirt removal and stormwater quality in the air-sweeper basin is reported as either regenerative-air or vacuum-assist.
The quantity of street dirt and the constituents associated with it can vary widely depending on street-sweeper technology and frequency. The street-sweeper technologies most often used today are mechanical broom, regenerative air, and vacuum assisted. Performance evaluations of vacuum-assisted and regenerative-air sweepers appear mostly in trade journals and are rarely documented in peer-reviewed literature (Zarriello and others, 2002). Mechanical-broom sweepers were extensively tested during the 1970s and 1980s as part of the National Urban Runoff Program (NURP); those studies concluded that mechanical-broom sweepers removed only coarser particles and did not result in any stormwater-quality benefit (Athayde and others, 1983). This study examined the removal efficiencies of these three most common street-sweeper technologies. The regenerative-air and vacuum-assisted sweepers were operated on a weekly schedule, whereas the mechanical-broom sweeper was evaluated at two levels of operating frequency, weekly and monthly.
Street-dirt samples were collected weekly in the control and test basins by means of techniques described earlier in this report. The study was separated into two phases: (1) calibration and (2) treatment (street sweeping) on a weekly schedule. The calibration phase ran from June 2001 through September 2002 for the air-sweeper and low-frequency-broom basins and May 2002 through September 2002, and April to May 2005 for the high-frequency-broom basin. The treatment phase was conducted from April 2003 through September 2004 for the high- and low-frequency-broom basins, and April 2003 through May 2005 for the air-sweeper basin. Street-dirt sample collection was typically done during April through September to avoid snow and ice on street surfaces during winter and large amounts of organic detritus during fall. Street sweepers were dispatched to each basin in late March, after all remaining snow had melted, for a single pass prior to street-dirt sample collection; this served as a method to normalize each basin by limiting any bias from winter sand application and creating a common baseline for measurement of initial street-dirt yields. Table 5 details the street-dirt sample-collection schedule.
Table 5. Schedule for street-dirt sample collection.
EXPLANATION
Calibration period |
Treatment period | Equilibration period (sweep only once) |
1 Sweeping in air-sweeper basin and no sweeping in high-frequency broom basin.
Street-dirt yields are represented as pounds per curb-mile. Results of previous studies showed that pounds per curb-mile is a more meaningful unit than simply pounds when evaluating sweeper effectiveness because it represents actual mass of constituent removed from a street surface (Pitt, 1979). A composite street-dirt yield, in pounds per curb-mile, for each basin was calculated by means of the following formula:
![]() |
where
P is the mass of dirt on a street, in pounds per curb-mile;
n is the total number of streets in each basin;
i is an index to each street sampled in a study basin;
M is the total mass of sampled street-dirt,
in grams;
W is the width of the vacuum nozzle, in feet;
N is the number of individual strips vacuumed per street;
Lft is the length of each street, in feet;
Lmi is the length of each street, in miles; and
0.0022 is a unit conversion factor between grams and pounds.
Figure 6 characterizes basin street-dirt yields during the part of the study when street sweepers were not used. The calibration phase was established to develop relations between the control and test basins without the influence of normal street-sweeping operations. Street-dirt yields exhibited a non-normal distribution, as determined by an evaluation of normality with the Kolmogorov-Smirnov test at the 5-percent significance level. During this period, the air-sweeper basin had the highest median street-dirt yield, followed by the low-frequency broom, control, and high-frequency broom basins, respectively. However, results of the Kruskall-Wallis statistical test show no significant difference in median street-dirt yield between the four basins at the 5-percent significance level. Similarly, an examination of street dirt by particle size indicates no significant difference in distribution. The majority of particles in each basin were greater than 250 micrometers; 50 percent on average fell between the 250- and 1,000-micrometer particle-size fractions.
Figure 6. Average weekly street-dirt yields in the control and test basins during the calibration phase.
Previous studies indicate that dirt loading from street surfaces can vary widely and that the variation can be attributed to many factors, including differences in basin characteristics, study methods, and variation inherent in environmental factors (Steuer and others, 1997; Smith, 2002). Table 6 compares mean street-dirt yields in the control and test basins during the no-sweeping phase of this study to those measured in similar street-cleaning studies in other parts of the country. Given the similarities in average basin street-dirt yield, conclusions drawn from this study may be transferable to other residential communities across the Nation.
Table 6. Comparison of street-dirt yields, measured during the no-sweeping phase of this study in Madison, Wis., to those for other residential streets in the United States.
[--, no data; all values in pounds per curb-mile]
broom |
broom |
Ill.1 |
Wash.2 |
Calif.3 |
nationwide4 |
|||
| Mean | ||||||||
| Median | ||||||||
1 Bender and Terstriep, 1984.
2 Pitt, 1985.
3 Pitt, 1979.
4 Sartor and Boyd, 1972.
The high-frequency broom basin was added to the study in May 2002; therefore, this report does not include any street-dirt sample data before that date. The late start in this basin may have had an effect on the summary statistics for the basin because the majority of street-dirt yield is often measured in early spring. Had the basin been added in March or April, the median street-dirt yield represented in figure 6 would likely have been greater. The influence of spring street-dirt yield is illustrated in both the control and air-sweeper basins, where the months of April and May were included in 2002 but not 2001 (fig. 7). Figure 8 further shows the seasonal influence on basin street-dirt yield by highlighting proportions of average load contributions during spring, summer, and fall for the control and air-sweeper basins during the 2002 sample-collection year. Average basin street-dirt yield during spring was 20 to 50 percent greater than loads measured during summer or fall in the control and study basins.
Figure 7. Influence of spring (April–May) street-dirt yield, in pounds per curb-mile, on total basin averages.
Figure 8. Average basin street-dirt yield categorized by season in the control and test basins during the 2002 calibration phase. Numbers in parentheses indicate percentage of street-dirt yield.
Each of the four basins was treated identically in that other than the single sweeper pass in March of each year, no street sweeping was done during a calibration period of 2 years. Street-dirt data collected from the control basin was paired with data from each of the test basins to establish a quantifiable relation. The basis of this paired-basin approach is that the relation between paired street-dirt yields for the control and tests basins is valid until a major change is made at one of the basins (Clausen and Spooner, 1993). At that time, a new relation will develop. The strength of this approach is that it does not require the assumption that the control and test basins are statistically the same; however, it does require that the two basins respond in a predictable manner together and that their relation remains the same over time except for the influence of street sweeping. Figure 9 represents the relations developed between the control and test basins during the calibration period. The relation is described by a simple linear regression. By use of analysis of variance (ANOVA), the significance of each linear regression was confirmed at the 5-percent significance level. There is a moderate to strong correlation between the control and test basin street-dirt yields, with correlation coefficients ranging from 0.73 to 0.80 for the high- and low-frequency broom basins, respectively.
Figure 9. Paired-basin relation between the control and test basins during the calibration phase.
In spring 2003, street sweepers were dispatched weekly to the air-sweeper and high-frequency broom basins. The low-frequency broom basin resumed the normal sweeping schedule for the city (approximately once per month). Street-dirt samples were collected before and after street sweepers cleaned each basin. An effort was made to minimize the amount of time between presweeping and postsweeping operations each week. Typically, postsweeper street-dirt samples were collected within 24 to 48 hours after presweeping samples were collected. All street-dirt sample collection was suspended during rain and as long as street surfaces remained wet. If a rain event occurred after the presweeping sample was collected, the postsweeping sample collection effort was postponed up to 1 day until street surfaces were sufficiently dry. If the duration of wet streets persisted beyond 1 day, the postsweeping sample collection effort was canceled. Of the 103 sampling trips scheduled during the course of the study, only 16 were canceled because of weather or mechanical problems.
Weekly Street-Sweeper Performance
During the treatment phase of the study, street-dirt samples
were collected weekly to determine the street-dirt-removal capabilities of each
street-sweeping program. Samples were acquired before and after street sweepers
cleaned each test basin. The performance of each sweeper was determined by analyzing
the difference between presweeping and postsweeping street-dirt yields.
Because of limitations in the street-dirt sample-collection process, the percentage reductions presented herein are somewhat underestimated. The presweeping and postsweeping street-dirt samples represent the load across the entire width of a street surface. A street sweeper’s path typically extends only 8 feet from the curb (M. Kinter, Elgin Sweepers, written commun., 2006), leaving the middle of the street unswept. It was necessary to measure the street-dirt yield across the entire street width to adequately quantify the load available for washoff during runoff events; however, inclusion of unswept dirt from the middle of the street confounded the presweeping versus postsweeping load computations.
An attempt was made to estimate the reduction in street-dirt that lies only within the sweeper path, excluding the part of the street that is normally unswept. Several samples were collected in the air-sweeper basin, characterizing the distribution of street-dirt yields across the width of a street. A logarithmic regression was fit to cumulative street-dirt yields at a distance of 3 and 13 feet from the curb. By use of the regression, a presweeping and postsweeping street-dirt yield was interpolated at a distance of 8 feet from the curb. On average, reduction in street-dirt yields increased only slightly (5 percent) when focusing on the actual sweeper path compared to the entire street width. This analysis suggests that sampling the entire street width has minor influence on assessment of overall street-sweeper performance. Therefore, discussion on sweeper performance refers to the reduction of street-dirt yield across the entire street width, and thus the total available load, rather than only that which lies in the path of the sweeper. Results of street-dirt distribution are presented and discussed in greater detail later in the report.
Table 7 details street-dirt removal statistics for each street sweeper evaluated during the study. A negative percentage indicates that more material was added than removed. The regenerative-air and vacuum-assist sweepers performed similarly over the range of measured values. The vacuum-assist sweeper had slightly better removal capabilities with respect to the mean and median values. On average, the mechanical broom had minor removal capabilities and often would add to the overall street-dirt yield after cleaning. However, results of a Wilcoxon signed-ranks test (Helsel and Hirsch, 1992), used to find differences between non-normally distributed paired data sets, showed a slight but significant reduction from presweeping to postsweeping street-dirt yields for the high-frequency broom basin at the 95-percent confidence level. Similar tests for the regenerative-air and vacuum-assist sweepers also showed a significant reduction in street-dirt yield at the 95-percent confidence level.
Table 7. Summary statistics of average basin street-dirt change for the regenerative-air, vacuum-assist, and high-frequency mechanical broom sweepers during the treatment phase. A negative value indicates an increase in street-dirt yield after sweeping.
[all values given in percent]
| Maximum | |||
| Minimum | |||
| Mean | |||
| Median | |||
| Number of samples | |||
Many studies report a range of measured and simulated sediment removal capabilities ranging from 35 to over 90 percent for regenerative-air or vacuum-assist sweeper technologies (Sutherland and Jelen, 1997; The Terrene Institute, 1998; Bannerman, 1999; Shoemaker and others, 2000, as cited in Zarriello and others, 2002). Similarly, Breault and others (2005) measured overall average street-sweeper efficiency ranging from 60 to 92 percent for a vacuum-assist sweeper. The methods used to determine pickup efficiency in these cases typically involved one or more passes of a street sweeper over a premeasured, mechanically applied street-dirt mix on a test street surface. Although this approach may describe the performance of a street sweeper under a very specific set of controlled conditions, it may not fully test the range of loading conditions represented by a variety of street surfaces with varying initial street-dirt yields over time. In contrast, this study evaluated sweepers under the conditions in which they are typically used.
Of the 37 paired street-dirt samples collected in the high-frequency broom basin, 14 pairs showed an increase in street-dirt yield after the sweeper cleaned the basin; in contrast, 2 postsweeping loads were greater than presweeping loads for the regenerative-air and vacuum-assist sweepers combined. One explanation for an increase in street-dirt yield after sweeping is the abrasive action of the wire bristles attached to the gutter brooms of each sweeper. By scouring the pavement, the wire-bristle brooms may loosen particles embedded in cracks found in the pavement or simply tear up the pavement itself. Although all three sweeper technologies make use of a wire-bristled gutter broom, the regenerative-air and vacuum-assist sweepers are better suited to remove a broader range of particles available for washoff by adding a powerful blast of air and (or) vacuum suction. The mechanical-broom sweeper simply passes any debris captured by the gutter broom into the path of a second, center-transfer broom.
The differences in street-dirt pickup efficiency between each sweeper can be further evaluated by analysis of particle size. Previous studies found mechanical-broom sweepers to be poorly suited for picking up particles of less than 10 to 250 micrometers (U.S. Environmental Protection Agency, 1983; Bender and Terstriep, 1984; Pitt, 1985; Wheaton and others, 1999; Shoemaker and others, 2000). Figure 10 illustrates the average weekly percent reduction of street dirt for particle sizes ranging from greater than 2,000 to less than 63 micrometers. As in table 7, a negative percentage indicates more material was added than removed. Reductions of street-dirt yield decreased with decreasing particle size for all sweepers. The high-frequency mechanical broom and regenerative-air sweepers were unable to adequately pick up particles less than 250 and 125 micrometers, respectively. Only the vacuum-assist sweeper was capable of reducing street-dirt yield across the entire range of particle sizes measured. Even at the smallest particle-size fraction, less than 63 micrometers, the vacuum-assist sweeper was able to reduce a percentage of the street-dirt yield by incorporating a powerful vacuum that extends into the curb, overlapping part of the gutter-broom. The vacuum appears to capture most of what the gutter broom cannot.
Figure 10. Average changes in weekly street-dirt yield as a function of particle size for three street-sweeping treatments in Madison, Wis. A negative value indicates an increase in street-dirt yield after sweeping.
Changes in Street-Dirt Distribution on a Street Surface
Pitt and Amy (1973) found that street dirt is unevenly distributed
across the street surface and that 90 percent of the street-dirt total mass is
within the first foot of the curb. A test was done during this study to identify
the distribution of street dirt across a street width. Sampled streets in the
air sweeper basin were split into “curb” and “center” lanes. The curb lanes stretched
out 3 feet from the curb on each side of the street (fig. 11). The remaining
26 feet was considered the center lane (fig. 11). Table 8 shows the percentage
contribution of street dirt for each lane from April through early June 2005.
When normalized by area, the curb lanes contained less street dirt than the center
lane during the early spring months. This result is likely due to remnants of
winter sand, which is typically applied in residential areas for traction enhancement
(A. Schumacher, City of Madison, written commun., 2006). However, each successive
week recorded a transgression of street-dirt from the center to the curb lanes.
By early summer, the curb lanes contained approximately 75 percent of the street
dirt. This distribution was confirmed by an earlier test in August 2003 showing
that 77 percent of street-dirt was contained in the curb lane. Furthermore, it
appears the vacuum-assist sweeper operating in the basin during this test was
able to reduce street dirt yield in the curb to a consistent level. This is evident
from postsweeping street-dirt yield distribution percentages remaining relatively
the same (approximately 25 percent) in the spring and summer, regardless of presweeping
load (table 8). Despite more street dirt moving from the center lane to curb
lanes, the vacuum-assist sweeper was able to remove the increased load and maintain
a stable distribution across the street width.
Figure 11. Location of sub-sampling strips to determine the distribution of street-dirt yield across a street.
Table 8. Distribution of street-dirt yield before and after street sweeping on a single street in the air-sweeper basin, April to June 2005.
[all values given in percent of total street-dirt yield]
April 21, 2005 |
||||
April 28, 2005 |
||||
May 5, 2005 |
||||
May 18, 2005 |
||||
May 25, 2005 |
||||
June 2, 2005 |
||||
The Nationwide Urban Runoff Program (NURP) recognized that street-dirt removal performance is higher with increasing street-dirt yield and that a certain residual load remains on each street at which no additional sweeping has any beneficial impact (Bannerman and others, 1983). Figure 12 illustrates how sweeper-removal rates vary proportionally to the available initial street-dirt yield in each of the test basins. For each sweeper evaluated, the amount of street dirt removed increased with increasing initial street-dirt yield. The mechanical broom sweeper appears to be relatively ineffective until the initial street-dirt yield approaches 1,000 pounds per curb-mile, whereas both the regenerative-air and vacuum-assist sweepers are effective at much lower initial street-dirt yields (fig. 12). Typically, street-dirt yields of this magnitude are measured during early spring months and are a reflection of the above-mentioned accumulated sand applied during the winter for better traction. Therefore, street-sweeping programs utilizing mechanical-broom sweepers could improve the overall reduction of street dirt by cleaning the entire street width rather than just the curb lanes during periods of heavy loading commonly associated with winter sand application in cold climates.
Figure 12. Street sweeper removal capabilities as a function of initial street-dirt yield, in pounds per curb-mile. A negative value for net yield removed indicates an increase in street-dirt yield after sweeping.
Changes in Basin Street Dirt as a Result of Street Sweeping
Figure 13 details average weekly street-dirt yields in each basin
during the treatment phase. The data used to build figure 13 represent the weekly
basin street-dirt yield before street sweepers entered each basin. The street-dirt
yields presented in figure 13 for the air-sweeper basin represent a combined
effect of the regenerative-air and vacuum-assist sweepers. The control basin
(not swept) had the highest median street-dirt yield with decreasing yields in
the low-frequency broom, high-frequency broom, and air-sweeper basins, respectively.
Table 9 details the average basin percent distribution of particle sizes measured
during the calibration and treatment phases. Similar to the calibration phase,
the majority of particles in each basin during the treatment phase were greater
than 250 micrometers. Both the regenerative-air and vacuum-assist sweepers produced
slight reductions of particles greater than 250 and 500 micrometers, respectively.
The broom sweeper, regardless of operating frequency, was only capable of reducing
particles greater than 1,000 micrometers. All sweepers evaluated during this
study produced slight increases in the percentage of particles less than 125
micrometers.
Figure 13. Average weekly street-dirt yield, in pounds per curb-mile, during the treatment phase.
Table 9. Distribution of particles measured from street surfaces in the control and test basins during the calibration and treatment phases.
[>, greater than; <, less than; all values given in percent of total mass; columns may not total to 100 percent because of independent rounding]
(micrometers) |
|||||||||
broom |
broom |
||||||||
Detritus
|
|||||||||
>2,000 |
|||||||||
1,000–2,000
|
|||||||||
500–1,000
|
|||||||||
250–500
|
|||||||||
125–250
|
|||||||||
63–125
|
|||||||||
<63 |
|||||||||
According to the paired-basin approach, any change in the relation established between the control and test basins during the calibration phase of the study can be attributed directly to street-sweeping activity. The magnitude of change may reflect upon the technology of the sweeper used, the frequency of sweeping, or both. Changes in the relation between paired data during the treatment phase of the study are highlighted in figures 14a-c. As with the calibration regression, an ANOVA test was performed on each treatment regression to confirm its significance at the 5-percent level.
Figure 14a. Response of average weekly street-dirt yield, in pounds per curb-mile, to street sweeping in the air-sweeper basin.
Figure 14b. Response of average weekly street-dirt yield, in pounds per curb-mile, to street sweeping in the high-frequency broom basin.
Figure 14c. Response of average weekly street-dirt yield, in pounds per curb-mile, to street sweeping in the low-frequency broom basin.
At the end of the treatment period, the significance of the effect of street sweeping was determined using analysis of covariance (ANCOVA) (Clausen and Spooner, 1993). Results of the ANCOVA test indicate a significant change (95-percent confidence level) between the calibration and treatment relations in the air-sweeper basin for both the regenerative-air and vacuum-assist sweepers. The high-frequency broom basin also had a significant change (95-percent confidence level) in the intercept of the treatment regression. However, a change in slope between the calibration and treatment phases for the high-frequency broom basin was determined to be insignificant. This indicates an overall parallel shift in the regression equation. In this case, the treatment regression shifted below that of the calibration phase, demonstrating some level of benefit at reducing street-dirt yields. The low-frequency broom basin did not have a significant change for either the slope o