Identification of transportation route alternatives and engineering feasibility studies for Bridger-Teton National Forest, Cache Creek, and Little Granite Creek EIS data gathering and evaluation
Links
- Document: Report (pdf)
- Plates:
- Download citation as: RIS | Dublin Core
Abstract
This portion of the Cache Creek-Little Granite Creek EIS Data Gathering and Evaluation Study had two central objectives.
The first was to review all land access possibilities to the NCRA Cache Creek and to the Getty-Reserve Little Granite Creek proposed drilling sites. Based on this review, the preferred access corridor to each site was selected.
The second objective was to perform a reconnaissance survey of a feasible route within the selected corridor. Soils and design data were collected for the development of cost estimates and for use in studies being performed by other disciplines.
| Publication type | Report |
|---|---|
| Publication Subtype | USGS Numbered Series |
| Title | Identification of transportation route alternatives and engineering feasibility studies for Bridger-Teton National Forest, Cache Creek, and Little Granite Creek EIS data gathering and evaluation |
| Series title | Open-File Report |
| Series number | 81-858 |
| DOI | 10.3133/ofr81858 |
| Year Published | 1981 |
| Language | English |
| Publisher | U.S. Geological Survey |
| Description | Report: 53 p.; 2 Plates: 34.85 x 24.18 inches and 37.29 x 24.63 inches |
| Country | United States |
| Other Geospatial | Bridger-Teton National Forest, Cache Creek, Little Granite Creek |