Identification of transportation route alternatives and engineering feasibility studies for Bridger-Teton National Forest, Cache Creek, and Little Granite Creek EIS data gathering and evaluation

Open-File Report 81-858
By:

Links

Abstract

This portion of the Cache Creek-Little Granite Creek EIS Data Gathering and Evaluation Study had two central objectives.

The first was to review all land access possibilities to the NCRA Cache Creek and to the Getty-Reserve Little Granite Creek proposed drilling sites. Based on this review, the preferred access corridor to each site was selected.

The second objective was to perform a reconnaissance survey of a feasible route within the selected corridor. Soils and design data were collected for the development of cost estimates and for use in studies being performed by other disciplines.

Publication type Report
Publication Subtype USGS Numbered Series
Title Identification of transportation route alternatives and engineering feasibility studies for Bridger-Teton National Forest, Cache Creek, and Little Granite Creek EIS data gathering and evaluation
Series title Open-File Report
Series number 81-858
DOI 10.3133/ofr81858
Year Published 1981
Language English
Publisher U.S. Geological Survey
Description Report: 53 p.; 2 Plates: 34.85 x 24.18 inches and 37.29 x 24.63 inches
Country United States
Other Geospatial Bridger-Teton National Forest, Cache Creek, Little Granite Creek
Additional publication details