|
|
The CHN can either be started from standby mode or from shut-down mode.
The CHN is usually in this
mode. After the system has purged completely, it will go into STANDBY.
Start running a Conditioner Sample by pushing Single Run (see Setting up an Auto Run). A Conditioner Sample is run at the beginning of each sample set in order to calibrate the machine. This sample is comprised of 1.5 to 2.5mg of Acetanilide and run as a sample. *If Helium is low, then the machine might give you a message to change the tank - (see Changing the Gases). |
Flip
the white button on the right side panel of the machine to the "On"
position.
When you turn the machine on, the system will check itself. If there is a failure, it will be displayed on the screen and you will have to look it up in the PE Manual or call the Service Representative. If the checks pass, you'll
see the following prompts on the screen where you will enter information: The machine will take approximately 2 hours to get up to temperature. Follow warm start procedure. |
Return to Methods Procedures |
Return to Index |