Level II scour analysis for Bridge 39 (TOPSTH00510039) on Town Highway 51, crossing Tabor Branch Waits River, Topsham, Vermont
Lora K. Striker, Tim Severance
1997, Open-File Report 97-797
This report provides the results of a detailed Level II analysis of scour potential at structure TOPSTH00510039 on Town Highway 51 crossing the Tabor Branch Waits River, Topsham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability...
Level II scour analysis for Bridge 25 (DANVTH00610025) on Town Highway 61, crossing Water Andric Brook, Danville, Vermont
Robert H. Flynn, Timothy Severance
1997, Open-File Report 97-796
This report provides the results of a detailed Level II analysis of scour potential at structure DANVTH00610025 on Town Highway 61 crossing Water Andric Brook, Danville, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 23 (WEELTH00210023) on Town Highway 21, crossing Miller Run, Wheelock, Vermont
Robert H. Flynn, Erick M. Boehmler
1997, Open-File Report 97-795
This report provides the results of a detailed Level II analysis of scour potential at structure WEELTH00210023 on Town Highway 21 crossing Miller Run, Wheelock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 39 (STOWTH00160039) on Town Highway 16, crossing Moss Glen Brook, Stowe, Vermont
Michael A. Ivanoff, Robert E. Hammond
1997, Open-File Report 97-794
This report provides the results of a detailed Level II analysis of scour potential at structure STOWTH00160039 on Town Highway 16 crossing Moss Glen Brook, Stowe, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 5 (MORRTH00060005) on Town Highway 6, crossing Bedell Brook, Morristown, Vermont
Erick M. Boehmler, James R. Degnan
1997, Open-File Report 97-793
This report provides the results of a detailed Level II analysis of scour potential at structure MORRTH00060005 on Town Highway 6 crossing Bedell Brook, Morristown, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 17 (SHEFTH00380017) on Town Highway 38, crossing Miller Run, Sheffield, Vermont
Lora K. Striker, James R. Degnan
1997, Open-File Report 97-782
This report provides the results of a detailed Level II analysis of scour potential at structure SHEFTH00380017 on Town Highway 38 crossing Miller Run, Sheffield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 37 (CABOTH00410037) on Town Highway 41, crossing the Winooski River, Cabot, Vermont
Robert H. Flynn, Laura Medalie
1997, Open-File Report 97-781
This report provides the results of a detailed Level II analysis of scour potential at structure CABOTH00410037 on Town Highway 41 crossing the Winooski River (also referred to as Coit’s Pond Brook), Cabot, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a...
Level II scour analysis for Bridge 36 (STOWTH00430036) on Town Highway 43, crossing Miller Brook, Stowe, Vermont
Lora K. Striker, Emily C. Wild
1997, Open-File Report 97-780
This report provides the results of a detailed Level II analysis of scour potential at structure STOWTH00430036 on Town Highway 43 crossing the Miller Brook, Stowe, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 27 (STJOTH00080027) on Town Highway 8, crossing the Sleepers River, St. Johnsbury, Vermont
Michael A. Ivanoff
1997, Open-File Report 97-779
This report provides the results of a detailed Level II analysis of scour potential at structure STJOTH00080027 on Town Highway 8 crossing the Sleepers River, St. Johnsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and...
Level II scour analysis for Bridge 34 (CONCTH00110034) on Town Highway 11, crossing Miles Stream, Concord, Vermont
Ronda L. Burns, Robert E. Hammond
1997, Open-File Report 97-776
This report provides the results of a detailed Level II analysis of scour potential at structure CONCTH00110034 on Town Highway 11 crossing Miles Stream, Concord, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 39 (PEACTH00620039) on Town Highway 62, crossing South Peacham Brook, Peacham, Vermont
Ronda L. Burns, James R. Degnan
1997, Open-File Report 97-775
This report provides the results of a detailed Level II analysis of scour potential at structure PEACTH00620039 on Town Highway 62 crossing South Peacham Brook, Peacham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 29 (DORSTH00100029) on Town Highway 10, crossing the Mettawee River, Dorset, Vermont
Emily C. Wild
1997, Open-File Report 97-774
This report provides the results of a detailed Level II analysis of scour potential at structure DORSTH00100029 on Town Highway 10 crossing the Mettawee River, Dorset, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 38 (JERITH0020038) on Town Highway 20, crossing the Lee River, Jericho, Vermont
Emily C. Wild, James R. Degnan
1997, Open-File Report 97-773
This report provides the results of a detailed Level II analysis of scour potential at structure JERITH00200038 on Town Highway 20 crossing the Lee River, Jericho, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 18 (SHEFTH00410018) on Town Highway 41, crossing Millers Run, Sheffield, Vermont
Emily C. Wild, Erick M. Boehmler
1997, Open-File Report 97-772
This report provides the results of a detailed Level II analysis of scour potential at structure SHEFTH00410018 on Town Highway 41 crossing Millers Run, Sheffield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 41 (ANDOVT00110041) on State Route 11, crossing the Middle Branch Williams River, Andover, Vermont
Emily C. Wild, Robert E. Hammond
1997, Open-File Report 97-771
This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110041 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability...
Level II scour analysis for Bridge 8 (WELLTH00020008) on Town Highway 2, crossing Wells Brook, Wells, Vermont
Lora K. Striker, Michael A. Ivanoff
1997, Open-File Report 97-770
This report provides the results of a detailed Level II analysis of scour potential at structure WELLTH00020008 on Town Highway 2 crossing the Wells Brook, Wells, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 53 (CHESTH01180053) on Town Highway 118, crossing the Williams River, Chester, Vermont
Lora K. Striker, Laura Medalie
1997, Open-File Report 97-769
This report provides the results of a detailed Level II analysis of scour potential at structure CHESTH01180053 on Town Highway 118 crossing the Williams River, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 22 (WALDTH00180022) on Town Highway 18, crossing Coles Brook, Walden, Vermont
Lora K. Striker, Michael A. Ivanoff
1997, Open-File Report 97-768
This report provides the results of a detailed Level II analysis of scour potential at structure WALDTH00180022 on Town Highway 18 crossing Coles Brook also known as Joes Brook, Walden, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of...
Level II scour analysis for Bridge 31 (JERITH00350031) on Town Highway 35, crossing Mill Brook, Jericho, Vermont
Emily C. Wild
1997, Open-File Report 97-767
This report provides the results of a detailed Level II analysis of scour potential at structure JERITH00350031 on Town Highway 35 crossing Mill Brook, Jericho, Vermont (figures 1– 8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 46 (BRNETH00610046) on Town Highway 61, crossing East Peacham Brook, Barnet, Vermont
Michael A. Ivanoff
1997, Open-File Report 97-766
This report provides the results of a detailed Level II analysis of scour potential at structure BRNETH00610046 on Town Highway 61 crossing East Peacham Brook, Barnet, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 4 (RYEGTH00050004) on Town Highway 5, crossing the Wells River, Ryegate, Vermont
Michael A. Ivanoff, Robert E. Hammond
1997, Open-File Report 97-765
This report provides the results of a detailed Level II analysis of scour potential at structure RYEGTH00050004 on Town Highway 5 crossing the Wells River, Ryegate, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 4 (MAIDTH00070004) on Town Highway 7, crossing Cutler Mill Brook, Maidstone, Vermont
Lora K. Striker, Laura Medalie
1997, Open-File Report 97-760
This report provides the results of a detailed Level II analysis of scour potential at structure MAIDTH00070004 on Town Highway 7 crossing the Cutler Mill Brook, Maidstone, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and...
Level II scour analysis for Bridge 3 (EASTTH00010003) on Town Highway 1, crossing the East Branch Passumpsic River, East Haven, Vermont
Ronda L. Burns, Erick M. Boehmler
1997, Open-File Report 97-759
This report provides the results of a detailed Level II analysis of scour potential at structure EASTTH00010003 on Town Highway 1 crossing the East Branch Passumpsic River, East Haven, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream...
Level II scour analysis for Bridge 16 (BURKTH00070016) on Town Highway 7, crossing Dish Mill Brook, Burke, Vermont
Ronda L. Burns, Tim Severance
1997, Open-File Report 97-758
This report provides the results of a detailed Level II analysis of scour potential at structure BURKTH00070016 on Town Highway 7 crossing Dish Mill Brook, Burke, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 20 (BRISTH00270020) on Town Highway 27, crossing Little Notch Brook, Bristol, Vermont
Erick M. Boehmler
1997, Open-File Report 97-756
This report provides the results of a detailed Level II analysis of scour potential at structure BRISTH00270020 on Town Highway 27 crossing Little Notch Brook, Bristol, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...