Status, trends, and changes in freshwater inflows to bay systems in the Corpus Christi Bay National Estuary Program study area
W.H. Asquith, J. G. Mosier, P. W. Bush
1997, Report
This report presents the results of a study to quantify current (1983–93) mean freshwater inflows to the six bay systems (open water and wetlands) in the Corpus Christi Bay National Estuary Program study area, to test for historical temporal trends in inflows, and to quantify historical and projected changes in...
A GIS model to predict black bear habitat use
F.T. Van Manen, M.R. Pelton
1997, Journal of Forestry (95) 6-12
No abstract available....
Precambrian to modern manganese mineralization: Changes in ore type and depositional environment
Keith Nicholson, James R. Hein, Bernhard Buhn, Somnath Dasgupta
1997, Geological Society, London, Special Publications (119) 1-3
No abstract available....
Preliminary geologic map of the Fillmore 7.5' quadrangle, Southern California: A digital database
R.F. Yerkes, R. H. Campbell
1997, Open-File Report 95-802
This Open-File report is a digital geologic map database. This pamphlet serves to introduce and describe the digital data. There is no paper map included in the Open-File report. This digital map database is compiled from previously published sources combined with some new mapping and modifications in nomenclature. The geologic map...
Level II scour analysis for Bridge 29 (ROYATH00920029) on Town Highway 92, crossing the First Branch White River, Royalton, Vermont
Emily C. Wild, Robert E. Hammond
1997, Open-File Report 97-819
This report provides the results of a detailed Level II analysis of scour potential at structure ROYATH00920029 on Town Highway 92 crossing the First Branch White River, Royalton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability...
Level II scour analysis for Bridge 37, (BRNETH00740037) on Town Highway 74, crossing South Peacham Brook, Barnet, Vermont
Ronda L. Burns, Timothy Severance
1997, Open-File Report 97-815
This report provides the results of a detailed Level II analysis of scour potential at structure BRNETH00740037 on Town Highway 74 crossing South Peacham Brook, Barnet, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 6 (BRISVT01160006) on State Highway 116, crossing Little Notch Brook, Bristol, Vermont
Erick M. Boehmler, Ronda L. Burns
1997, Open-File Report 97-4
This report provides the results of a detailed Level II analysis of scour potential at structure BRISVT01160006 on State Route 116 crossing the Little Notch Brook, Bristol, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and...
Level II scour analysis for Bridge 28 (CAMBTH00460028) on Town Highway 46, crossing the Seymour River, Cambridge, Vermont
Michael A. Ivanoff
1997, Open-File Report 97-648
This report provides the results of a detailed Level II analysis of scour potential at structure CAMBTH00460028 on Town Highway 46 crossing the Seymour River, Cambridge, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 53 (CAMBTH00750053) on Town Highway 75, crossing the Brewster River, Cambridge, Vermont
Michael A. Ivanoff, Robert E. Hammond
1997, Open-File Report 97-647
This report provides the results of a detailed Level II analysis of scour potential at structure CAMBTH00750053 on Town Highway 75 crossing the Brewster River, Cambridge, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 3 (EASTTH00010003) on Town Highway 1, crossing the East Branch Passumpsic River, East Haven, Vermont
Ronda L. Burns, Erick M. Boehmler
1997, Open-File Report 97-759
This report provides the results of a detailed Level II analysis of scour potential at structure EASTTH00010003 on Town Highway 1 crossing the East Branch Passumpsic River, East Haven, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream...
Level II scour analysis for Bridge 2 (BENNCYPARK0002) on Park Street, crossing Furnace Brook, Bennington, Vermont
Scott A. Olson
1997, Open-File Report 97-341
This report provides the results of a detailed Level II analysis of scour potential at structure BENNCYPARK0002 on the Park Street crossing of Furnace Brook, Bennington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 16 (BURKTH00070016) on Town Highway 7, crossing Dish Mill Brook, Burke, Vermont
Ronda L. Burns, Tim Severance
1997, Open-File Report 97-758
This report provides the results of a detailed Level II analysis of scour potential at structure BURKTH00070016 on Town Highway 7 crossing Dish Mill Brook, Burke, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 5 (DUMMVT00300005) on State Route 30, crossing Stickney Brook, Dummerston, Vermont
Michael A. Ivanoff
1997, Open-File Report 97-627
This report provides the results of a detailed Level II analysis of scour potential at structure DUMMVT00300005 on State Route 30 crossing Stickney Brook, Dummerston, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 6 (FAYSTH00010006) on Town Highway 1, crossing Shepard Brook, Fayston, Vermont
Lora K. Striker, Robert H. Flynn
1997, Open-File Report 97-755
This report provides the results of a detailed Level II analysis of scour potential at structure FAYSTH00010006 on Town Highway 1 crossing Shepard Brook, Fayston, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 7 (WARRTH00010007) onTown Highway 1, crossing Freemans Brook, Warren, Vermont
Robert H. Flynn, Ronda L. Burns
1997, Open-File Report 97-8
This report provides the results of a detailed Level II analysis of scour potential at structure WARRTH00010007 on Town Highway 1 crossing Freeman Brook, Warren, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 17 (LYNDTH00020017) on Town Highway 2, crossing Hawkins Brook, Lyndon, Vermont
Emily C. Wild, Laura Medalie
1997, Open-File Report 97-752
This report provides the results of a detailed Level II analysis of scour potential at structure LYNDTH00020017 on Town Highway 2 crossing Hawkins Brook, Lyndon, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 16 (RIPTTH00110016) on Town Highway 11, crossing the Middle Branch Middlebury River, Ripton, Vermont
Ronda L. Burns
1997, Open-File Report 97-751
This report provides the results of a detailed Level II analysis of scour potential at structure RIPTTH00110016 on Town Highway 11 crossing the Middle Branch Middlebury River, Ripton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability...
Level II scour analysis for Bridge 23 (WALDTH00060023) on Town Highway 6, crossing Stannard Brook, Walden, Vermont
Michael A. Ivanoff, Robert E. Hammond
1997, Open-File Report 97-674
This report provides the results of a detailed Level II analysis of scour potential at structure WALDTH00060023 on Town Highway 6 crossing Stannard Brook, Walden, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 21 (MONKTH00340021) on Town Highway 34, crossing Little Otter Creek, Monkton, Vermont
Erick M. Boehmler, Laura Medalie
1997, Open-File Report 97-672
This report provides the results of a detailed Level II analysis of scour potential at structure MONKTH00340021 on Town Highway 34 crossing Little Otter Creek, Monkton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 34 (SHERUS00040034) on U.S. Highway 4, crossing the Ottauquechee River, Sherburne, Vermont
Robert H. Flynn, Timothy Severance
1997, Open-File Report 97-9
This report provides the results of a detailed Level II analysis of scour potential at structure SHERUS00040034 on US Route 4 crossing the Ottauquechee River, Sherburne, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 18 (GROTTH00480018) on Town Highway 48, crossing the Wells River Groton, Vermont
Lora K. Striker, Laura Medalie
1997, Open-File Report 97-626
This report provides the results of a detailed Level II analysis of scour potential at structure GROTTH00480018 on Town Highway 48 crossing the Wells River, Groton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 120 (LEICUS00070120) on U.S. Route 7, crossing the Leicester River, Leicester, Vermont
Erick M. Boehmler, Timothy Severance
1997, Open-File Report 97-3
This report provides the results of a detailed Level II analysis of scour potential at structure LEICUS00070120 on U. S. Route 7 crossing the Leicester River, Leicester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and...
Level II scour analysis for Bridge 40 (ANDOVT00110040) on State Route 11, crossing Lyman Brook, Andover, Vermont
Michael A. Ivanoff, Ronda L. Burns
1997, Open-File Report 97-594
This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110040 on State Route 11 crossing Lyman Brook, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....
Level II scour analysis for Bridge 29 (DORSTH00100029) on Town Highway 10, crossing the Mettawee River, Dorset, Vermont
Emily C. Wild
1997, Open-File Report 97-774
This report provides the results of a detailed Level II analysis of scour potential at structure DORSTH00100029 on Town Highway 10 crossing the Mettawee River, Dorset, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour...
Level II scour analysis for Bridge 13 (SHARTH00040013) on Town Highway 4, crossing Broad Brook, Sharon, Vermont
Emily C. Wild, Matthew A. Weber
1997, Open-File Report 97-593
This report provides the results of a detailed Level II analysis of scour potential at structure SHARTH00040013 on Town Highway 4 crossing Broad Brook, Sharon, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S....